B. MATERIALS AND CONSTRUCTION
The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement of retro reflective paint and thermoplastic pavement markings in accordance
with Section 632 of the most current edition of the NHDOT Standard Specifications for Road
and Bridge Construction and the most current edition of the MUTCD. Striping shall match
existing striping and be replaced in kind or as directed by the Engineer. All stop bars, crosswalks
and symbols shall be retro reflective thermoplastic and all long lines shall be retro reflective
paint.
C. MEASUREMENT AND PAYMENT
Retro reflective Paint Pavement Marking,
Single Solid Line, 4in. Linear Foot
Retro reflective Thermoplastic Pavement Marking,
Single Solid Line, 12in. Linear Foot
Retro reflective Thermoplastic Symbol Square Foot
02745A-2