Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/15/2017 - P109

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P109

ase UOIMysSUO
puny HequoD

4 aseyd Suppig |

BUIpPprg 103 syUZWINIOp JoesyUOD pue sued azyeuly

Pa : }Pyhugns Manas AiojeMsas 4565
Ka Jeaoidde J Mains 10} AUF 0} sjuaUUNOOp UElsap 3406
3 jenoride / maiaes 10) Ay 0} SyuaLINOOp UBIsap 4409
a WL UW udd UO S]UaURUOD Ssaippy
4 poday ugsag Aull Huns

ES aeeny WEN PUBIOWSU [RIUYSa} yueseig f SAANBUIEYe apeusdn ayenjeay

xe OR ALUM 2390 07 SUSI agg

ay <a SHUR SSA) SS3ig0iq PUP 270-491y

paaioig 0} amoN / 9B3]}U03 JO LOLNIaNg / UONDapes JUeYNsUGD

fesodoud puuqns

Finance Committee - Agenda - 3/15/2017 - P108

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P108

III.

bid-ready design plans, specifications and estimates for construction costs, revised
to address the comments from the draft reviews. The submittal shall be ready to
be advertised for construction bidding and shall include a schedule for the bidding
and construction process.

Bidding Phase Services

Assistance in securing construction bids, conducting bid opening, tabulation and analysis
of bids, and recommendation regarding award of contract. A copy of the bid analysis
will be furnished to the DIVISION.

l.
2.

2 me

Finance Committee - Agenda - 3/15/2017 - P107

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P107

i.

Final Design for Primary Tank Upgrade

A.

Permitting, Codes, Regulatory Buy-in

Complete environmental permitting applications/reports (if needed), discuss
local/state/federal code requirements with authority having jurisdiction, and
discuss and obtain permissions from DIVISION for any sole-sourcing of
equipment on the project.

60% Completion Plans, Contract Documents and Cost Estimates

Finance Committee - Agenda - 3/15/2017 - P106

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P106

Receive OWNER comments and provide written response to all comments
to satisfaction of OWNER. Submit final Preliminary Design documents to
DIVISION for review.

The draft preliminary design report shall be completed within 180 days of
receiving authorization to proceed. The attached schedule shows the
timeline for preliminary design tasks in greater detail.

Finance Committee - Agenda - 3/15/2017 - P105

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P105

12.

13,

° ENGINEER’s instrumentation division shall summarize the
existing control system and recommended improvements in draft
TM. TM shall include both the flight and sprocket monitoring
system for the clarifier mechanism and the proposed changes to the
sludge withdrawal system.

° ENGINEER’s electrical division will summarize the existing
electrical gear, code requirements and recommended
improvements to include in the upgrade in draft TM.

Finance Committee - Agenda - 3/15/2017 - P104

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P104

10.

11.

Evaluate scum disposal and handling options. The scum disposal

alternatives shall include:

e Continuing disposal at City landfill or other short-haul options

e Co-disposal with screenings and disposal at City landfill.

e Long-distance transportation in tanker to sludge incinerator or other
disposal option, and

e Transfer to existing anaerobic digester for digestion.

Finance Committee - Agenda - 3/15/2017 - P103

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P103

Exhibit A: Scope of Work — Revised 2/14/2017

I. Prepare Preliminary Design Report for Primary Tank Upgrade

A.

Preliminary workshop. ENGINEER shall attend a preliminary workshop with
OWNER to review the work plan for the upgrade project, and solicit input on a
wide range of issues including chain and flight material, shaft layout, scum
handling and disposal options, and ancillary improvements. Brainstorm on
options, and identify the preferred alternatives for detailed evaluation.

Finance Committee - Agenda - 3/15/2017 - P102

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P102

PART III - PRICE SUMMARY

COMPETITOR'S CATALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES
13. (Indicate basis for price comparison)

MARKET
PRICE (S)

PROPOSED
PRICE

PART IV - DIRECT LABOR BY CATEGORY

14. INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD INCLUDE BUT
NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH AS DESIGN, SURVEY,
SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION, RECORD DWGS, START-UP, SPECIAL

SERVICES, ETC.

Finance Committee - Agenda - 3/15/2017 - P101

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P101

COST OR PRICE SUMMARY FORMAT FOR SUBAGREEMENTS UNDER NH SAG & SRF

Form Approved
DES 02/06

PART I - GENERAL

1, GRANTEE / LOANEE
City of Nashua, New Hampshire

2. GRANT/LOAN NO.

3. NAME OF CONTRACTOR OR SUBCONTRACTOR

Woodard & Curran, Inc.

4. DATE OF PROPOSAL
December 16, 2016

5. ADDRESS OF CONTRACTOR OR SUBCONTRACTOR (Include ZIP)

6. TYPE OF SERVICE TO BE FURNISHED

PART II - COST SUMMARY

Finance Committee - Agenda - 3/15/2017 - P100

By dnadmin on Mon, 11/07/2022 - 10:27
  • Read more about Finance Committee - Agenda - 3/15/2017 - P100

ENGINEERING DESIGN PHASE CONTRACT
For Professional Services for Treatment Works

The Project Engineer shall be*

Jeffrey R. Pinnette, P.E.
(name and address)
Wright-Pierce, 99 Main St., Topsham, ME 04086

* Resume clearly describing the candidate's qualifications for
the assignment is appended for convenience of reference.

Pagination

  • Previous page ‹‹
  • Page 1154
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact