PART III - PRICE SUMMARY
COMPETITOR'S CATALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES
13. (Indicate basis for price comparison)
MARKET
PRICE (S)
PROPOSED
PRICE
PART IV - DIRECT LABOR BY CATEGORY
14. INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD INCLUDE BUT
NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH AS DESIGN, SURVEY,
SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION, RECORD DWGS, START-UP, SPECIAL
SERVICES, ETC.
Work category 5, y
™ oc ol 2 ~~
3 QD op wn op ot 245 a
a £ g = 3 5 g Ep Total
Ho 2 A S a -& _ & Si} Hours | Rate Cost
aq E S © o's §
> ee} & = 2 = geass
ne Py 6 DB & Am O a
TOTAL HOURS 135 20 265.5 50. | 293: 38 801:5
Client Manager 44 4 18 $82 $1,476
Project Manager g 4 S38 _ #8 20 64 $57 $3,648
Lead Project Engineer 40 8 40 Al 2 40 8 148 $37 $5,476
Sr. Technical Advisor 8 % a “Ee 4 16 $82 $1,312
SCADA Engineer 4 5 30 30 60 $45 $2,700
Sr. Electrical Engineer 6.5 6 12.5 $57 $713
Electrical Engineer 55 55 110 $37 $4,070
Staff Engineer 75 8 60 8 60 211 $27 $5,697
Sr. Structural Engineer 4 4 8 $57 $456
Structural Engineer 30 30 60 $37 $2,220
Cost Estimator 4 24 $49 $1,176
reehnial Specialist 20 20 40 $46 $1,840
Project Specialist 4 8 8 10 30 $28 $840
Total - Direct Labor Cost $31,624
Page 2 of 2