Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/15/2017 - P107

Finance Committee - Agenda - 3/15/2017 - P107

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
107
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

i.

Final Design for Primary Tank Upgrade

A.

Permitting, Codes, Regulatory Buy-in

Complete environmental permitting applications/reports (if needed), discuss
local/state/federal code requirements with authority having jurisdiction, and
discuss and obtain permissions from DIVISION for any sole-sourcing of
equipment on the project.

60% Completion Plans, Contract Documents and Cost Estimates

Based on an agreed upon preliminary design documents for the primary tank
upgrade and appurtenances, ENGINEER shall proceed to develop 60% design
plans, specifications, and bidding document. .Provide a progress printing with five
(5) copies of the preliminary plans and specifications submitted to the OWNER
for review and comment. Hold a review meeting to discuss issues requiring
OWNER input. @ :

90% Completion Plans, Contract Documents and Cost Estimates

Following the review meeting, ENGINEER shall proceed with the 90% design
plans, specifications, and bidding documents as well as to prepare an updated
estimate of construction cost. Submit five (5) copies of these plans, specifications
and bidding documents to OWNER for review and comment. Advise OWNER of
any adjustments to the Sgnstruction Cost Estimate as a result of changes in scope

of the. Project.

1. “Meet with OWNER to discuss comments on 90% documents and provide
written Tesponse to all comments received to the satisfaction of the
OWNER.

2. ENGINER shall submit three (3) copies of the 90% plans, contract
documents and estimates must be submitted to the DIVISION for their
review. All comments from DIVISION shall be incorporated into the
documents with a written response on how it was addressed.

3. The 90% documents shall be submitted to the OWNER within160 days of
the OWNER’s approval of the Preliminary Design Report.

Final Plans, Contract Documents and Cost Estimates

Upon the OWNER’s and DIVISION’s acceptance of the 90% plans and contract
documents as adequately completed, the ENGINEER shall proceed with the final,