Finance Committee - Agenda - 12/5/2018 - P31
TF B0S01-090618
BID COMPARISON
ENERGY RECOVERY GENERATOR UPGRADES
TF B0S01-090618
BID COMPARISON
ENERGY RECOVERY GENERATOR UPGRADES
ASA
breaker designated for gas blower option per 262419 and B-
6031)
¢ Twenty Thousand Dollars
16, With what banks do you conduct business? Enterprise Bank
De you grant the Engineer permission to contact this (these) institutions? X_(Yes)
(No)
NOTE: Bidders may be required to furnish their latest fmancial statement as part of
the award process.
144 Main Street, PO Box 980, Plaistow, NH 03865
Ss Signature * Address
President and CEO September 6, 2078
Tide Date
Beine duly sworn, deposes and says that he
Joseph A. Barbone, Jr. g Gury , 2 3
President and CEO of Methuen Construction Company, Inc.
A-3.2
The Bidder shall state below what works of a similar character to that of the proposed contract he
has performed, and provide such references as will enable the Owner to judge his experience, skill,
and business standing.
Ail questions must be answered and the data given must be clear and comprehensive. This
statement must be notarized. HW necessary, add separate sheets.
1. WNameofBidder, Methiien Construction Company, Inc.
4 Permanent Main Office address 144 Main Street, PO Box 980, Plaistow, NH 03865
A-3.1
BID
Proposal of __ Methuen Construction Company, Inc. (hereinafter
called "BIDDER"), organized and existing under the laws of the State of New Hampshire
doing business as Corporation
(Corporation, Parinership, Individual}
To the City of Nashua, New Hampshire (hereinafter called "OWNER".
To:
From:
Re:
B. Motion:
Attachments:
Discussion:
City of Nashua, Public Works Division
Board of Public Works Meeting Date: November 19, 2018
David L. Boucher, Superintendent
Wastewater Department
Energy Recovery Upgrades Project
THE CITY OF NASHUA “The Cate City
Financial Services
Purchasing Department
November 29, 2018
Memo #19-096
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: ENERGY RECOVERY UPGRADES — CONSTRUCTION SERVICES (VALUE:
$1,787,373)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER
Please see the attached communication from David L. Boucher, Superintendent Wastewater Department
dated November 19, 2018 for the information related to this contract.
op Project Lead Project Staff Lead Staff Direct labor
Task Descriptions Manager Engineer Engineer Designer Designer Admin Total Hours | Non-Labor Cost TOTAL
Typical Salary Rate $74 $52 $32 $40 $33 $24
Summary by Task for 5700 Form:
1. Pre-Con Services 12 0 16 0 0 0 28 $1,400 $4,060.00
2. Construction Observation 34 72 0 0 0 0 106 $6,260 | $18,154.00
3. RFE & Submittal Review 2 16 48 0 0 0 66 $2,516 $7,296.40
4. Startup and Commisssioning 10 58 112 0 0 4 184 $3,200 $7,424 | $24,729.60
Task Descriptions
Manager
$74
Construction
Schedule
On
Punch list
Final Walkthru
3. RFL& Submittal
and
T Plans and T
Interconnect
/ commissioni
W-P
Closeout
O&M Manual
Manual
TOTAL HOURS
Exhabit B-1 SUMMARY OF ESTIMATED STAFF EFFORT (HOURS) AND COSTS
Construction Adminstration for Energy Recovery Generator Upgrade
Engineer
Engineer
$32
16
Designer
$40
of Nashua
Designer
$33
Admin
4
City of Nashua Waste Water Treatment Facility — Energy Recovery Generator Upgrade
Construction Administration
Clarifications
1. Emission and other Environmental tests by others.
2. Load bank, if needed, by others.
3. Digested gas quality and quantity is managed by NWWTE and meet the engine
generator minimum standards. During startup and commissioning, Waldron expected
there is sufficient digested gas to operate minimum one new engine generator at any
given time.
4. Factory Acceptance Test is not included.