TF B0S01-090618
BID COMPARISON
ENERGY RECOVERY GENERATOR UPGRADES
Item | Approximate Brief Methuen Engineering
No. Quantity Deseription of Construction Construction
Item with Unit Company Services
All labor, materials, tools and equipment
required to complete the project as indicated on
1 Lump Sum the Drawings and as specified and all its! $ 1,749,378 $ 2,811,501
appurtenances in its entirety, except that work
included for payment under other items.
Cash All cost associated with Gas Utility
2 Allowance improvements required for new metering $18.000 $18.000
Bid Alternate C-ADD Response to Spec section
3 Lump Sum 481100 use option for gas booster/blend skid
P (includes allocation of spare breaker designated | $ 20,000 $ 298,295
for gas blower option per 262419 and E- 6031)
Total of all items 1 thru 2 above (excludes 3) $1,767,378 $2,829,501
Total of all items 1 thru 3 above $1,787,378 $3,127,796