Siphon Rehabilitation
Scope of Work for Engineering Design and Construction Phase Services
Table 2 Summary of Recommended Siphon Rehabilitation
Name Size Material Rehab Siphon Comment
(in) Recommendation QSR
CSO 6 18 RCP CIPP 2813 CIPP for cracks, visible aggregate
Trestle
Bridge
Canal St 10 Cl CIPP 3121 Install full length CIPP due to erosion of cement
Parking liner.
Lot 36 RCP ISR 1100 Install ISR from 63-71 LF from DSMH to repair
crack and |/| stain. Work with contractor to
ensure that ISR can navigate bend.
Main St 21 RCP CIPP 5242 Hole and severe corrosion, leaving
reinforcement visible. Use a pre-liner to cover
hole and use water cure to avoid excessive
pressure on host pipe. Drill hole and inject grout
to fill void post-liner cure.
c) Fairmount 10 Cl CIPP 3J00 Install full length CIPP due to potential hole at
St 28 LF from $2154 and deteriorating cement
liner throughout.
18 RCP CIPP 2J00 Install full length CIPP for I/l, aggregate visible
throughout pipe, and possible cracking at 193
LF from USMH.
30 RCP CIPP 4231 Install full length CIPP due to I/l, cracks, and
surface damage throughout.
5 Exit 6 8 Cl CIPP 3100 Install full length CIPP due to many instances
of failing cement liner.
16 Cl CIPP 3100 Install full length CIPP due to deteriorating
cement liner throughout.
21 RCP CIPP 4132 Install full length CIPP due to surface damage,
visible rebar, and some aggregate visible
throughout.
7 New 10 Di CIPP 1A00 Cement lining mostly missing, DIP may be
Searles corroding/tuberculation evident. Some Joint
Rd Separation.'
24 DI CIPP 2A00 Cement lining mostly missing, DIP may be
corroding/tuberculation evident. Some Joint
Separation.'
Kathy Dr 8 Di CIPP 4131 Cement lining mostly missing, DIP may be
corroding/tuberculation evident. Some Joint
Separation.'
10 DI CIPP 3122 Corrosion and cement lining damage
throughout.'
B1.1 Develop Base Maps
Consultant will be responsible for preparing base maps to be used for the design. The base maps will be
prepared in accordance with the following: The base maps will consist of GIS topographic data, information
from record drawings, and field investigations for confirmation. Consultant to provide services for field
verifying the base map information. City will conduct topographic survey for areas of work as required. The
survey will consist of mapping all surface features and preparing existing contours at 1-foot intervals.
3
FEBRUARY 2021