Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 26991 - 27000 of 38765

Finance Committee - Agenda - 12/5/2018 - P15

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

mm oRTHEAST
2 “Gees SAND & GRAVEL
PO Box 497

New ipswich, NH 03071

sales@nesand.com

603-809-7834
(fax) 603-878-0025
sieve Analysis
Job: Town of Nashua NH seaanmmhit Ds essseaon
Source Wilton Date TOIBi2018
SIEVE SCREEN CUMLATIVE CUMLATIVE TOTAL % G-33
SIZE WGT. WGT. % RETAINED PASSING SPEC
3/8" 0 0.00 0.00 400.0 100
#4 17.00 3.84 96.2 95-100
#8 39,00 6.80 91.2 80-100
#16 86.00 19.44 80.6 50-35
#30 182.00 43.34 56.7 25-60
#50 344.00 77.65 22.3 5-30
#106 417.00 94.13 5.3 0-10
#200 435.00 98.19 1.81 o~-3
PAN 443.00 400.00 0.8
FM 247
GROSS
FM Using C #DIV/0!

Organics:

Page Image
Finance Committee - Agenda - 12/5/2018 - P15

Finance Committee - Agenda - 12/5/2018 - P16

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
16
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

| THE CITY OF NASHUA “the Gate City"

Financial Services

Purchasing Department

November 29, 2018
Memo #19-095

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: ENERGY RECOVERY UPGRADES ~ CONSTRUCTION PHASE ENGINEERING
SERVICES (VALUE: $76,762)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from David L. Boucher, Superintendent Wastewater Department
dated November 19, 2018 for the information related to this contract.

§ 5-83. Professional services. [NRO 1975, T. 4, § 1613; NRO 1987, § 2-248; amended 11-26-1977 by
Ord. No. O-77-278; 4-22-1986 by Ord. No. O-86-50; 6-28-1988 by Ord. No. 0-88-43; 3-10-1998 by Ord.
No. 0-98-05; 70-26-1999 by Ord. No. O-99-139]

In the purchase of accounting, architectural, auditing, engineering, legal, medical and ambulance services
and purchases of independent professional consultant services for personnel, data processing, actuarial,
planning, management and other comparable purchases competitive bidding shall not be required.
Competitive bidding is required in the procurement of insurance agents and consultants.

The Superintendent Wastewater Department, the Board of Public Works (November 19, 2018 meeting)
and the Purchasing Department recommend the award of this contract in an amount of $76,762 to
Waldron Engineering of Exeter, NH.

Purchasing Manager

Ce: D Boucher L Fautuex

229 Main Street e Nashua, New Hampshire 03061 © Phone (603) 589-3330 e Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 12/5/2018 - P16

Finance Committee - Agenda - 12/5/2018 - P17

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
17
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua, Public Works Division

To: Board of Public Works Meeting Date: November 19, 2018
From: David L. Boucher, Superintendent

Wastewater Department
Re: Energy Recovery Upgrades — Construction Phase Services

C. Motion: To approve the contract with Waldron Engineering of Exeter, NH in an amount
not to exceed $76,762 for construction administration services for the Energy
Recovery Upgrade Project. Funding will be through: Department: 169-
Wastewater; Fund: Wastewater; Activity: Energy Recovery Upgrades.

Attachments: Waldron Engineering Contract

Discussion: The Nashua Wastewater Treatment Facility is undergoing an upgrade of its
energy recovery system.

Waldron Engineering is the design engineer and is very familiar with this project.
The project went out bid in August and 2 bids were received on September 6,
2018. The construction portion of this project is being awarded and construction
phase services from Waldron are needed.

Construction is estimated to last 8 months and Waldron’s services include
residential engineering and construction administration. Their cost proposal for
$76,762 is very reasonable when compared to the overall $1.78 million
construction costs. Typical construction phase service costs are around 8 to 10%
of construction costs, while this is only 5%.

Page Image
Finance Committee - Agenda - 12/5/2018 - P17

Finance Committee - Agenda - 12/5/2018 - P18

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
18
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

37 INDUSTRIAL DHIVE SUITEG-1 EXETER. NH OSES9 (603) 772-7753

WALDRON ENGINEERIMG & CONSTRUCTION, INC.

September 6" , 2018

William Keating

Wastewater Project Engineer

Nashua Waste Water Treatment Facility
2 Sawmill Road

Nashua, NH 03061

RE: Energy Recovery Generator Upgrade
Construction Administration Service Proposal

Dear Mr. Keating,

Waldron Engineering and Construction, Inc. (Waldron) is pleased to submit the Construction
Administrative Service proposal for the Nashua Waste Water Treatment Energy Recovery Generator
Upgrade Project. We have compiled this proposal based on the documents provided through your
discussion on the correct RFQ process.

Waldron looks forward to the opportunity to present our team and work with the facility. We are
confident we have a solid understanding of Construction Observational Site trips, General Contractor’s
RFI, Submittal reviews, Commissioning, and Operation Manual/Turnover packages and can deliver a
quality program that will insure a successful close-out project. We thank you for this opportunity to
present our offering and hope you can work with us to bring our design project to a successful
conclusion through a well-run construction process.

Sincerely,
Waldron Engineering & Construction, Inc.

Cedric Chan, P.E.
Director

27 7OELECTRIC ROAR ROANOKE VA GdO15 [540] 491-0071

Page Image
Finance Committee - Agenda - 12/5/2018 - P18

Finance Committee - Agenda - 12/5/2018 - P19

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
19
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Construction Administration

i, Executive Summary

Waldron Engineering and Construction, Inc. (Waldron) has compiled a project team witha
depth of cogeneration construction, startup, commissioning, project closeout and waste
water treatment plant operations experience that will ensure success for the Construction
Administration aspects of the Waste Water Treatment Facility Energy Recovery Generator
Upgrade project (ERU Project). The team will implement work on five aspects of the
project

e Construction Observation Site Trips to review ongoing-work during the eight
months of the G.C.

e General Contractor Requests for Information (RFD

e General Contractor Submittal Reviews

e® Start-up & Commissioning of the ERU project

e@ Preparation of Turn-over package and an Operations Manual for the project

Our team uses proprietary, state-of-the art RFI/Submittal tracking databases which are
synchronized with our design specification requirements, making the integration of our
Design teams with our field team seamless. Our proposed lead for Commissioning has
recently completed similar work at Tuffs University and has a great familiarity with CAT
engines and their requirements. We conducted operator training, manage turn-over
packages and close-out documentation on similar projects

The Waldron team has the capability to assist the Waste Water Treatment Facility during
the critical construction and commissioning phases. We have a proven track record and
have delivered similar CHP projects within the established project budget, exceeding the
anticipated performance goal and more importantly, on time completion so that the
Facilities successfully achieved the energy efficiency and economic goal.

Waldron completed over 27 power generation projects from detailed design, construction,
startup and commissioning that enable us to oversee and guide the G.C. to successful
implement your project in the field.

We have the experience to make your project a success. Our CHP project post-design
services have been a large part of what has made our projects so successful through the
years. We are confident to make this project a success for the City of Nashua Waste Water
Treatment Facility.

Page Image
Finance Committee - Agenda - 12/5/2018 - P19

Finance Committee - Agenda - 12/5/2018 - P20

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
20
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua Waste Water Treatment Facility —- Energy Recovery Generator Upgrade
Construction Administration

2 Scope of Work

Pre-Construction Services

Review General Contractor proposed schedule

Review Contractor bid and provide technical evaluation
Review Contractor Change Order Requests

Review Contractor Invoice

Review Contractor final completion

WP WN

Construction Observation

1. Attend bi-weekly construction meetings (up to 16)

2. Review construction progress schedule

3. Inspection construction for workmanship & accordance with plans & specs (up to 16
visits)

4. Participate punch list process

5. Perform a final walk thru with NWWTF and GC

Contractor Request for Information (RFD and Submittal Review
1. Review RFI (up to 18 RFI and 1 review cycle)
2. Review and assess contractor submittal (1 review cycle)

Startup and Commissioning

1. Develop ERU system startup and commissioning checklists

2. Develop Training Plans. Define minimum training requirement and skills that the
operation staff would be needed to operate the ERU properly and safely. Detailed
training plans and course materia! for the engine generator will be prepared by
others.

3. Waldron will conduct system operation trainings (up to 2 x 4 hour sessions).
Equipment training by others.

4, Provide technical inputs to NWWTF for Eversource interconnect testing. Utility and
major equipment startup technician coordination by NWWTF.

5. Perform Independent Review of Interconnection installation per Eversource
requirements, including managing project photo directory per requirements

6. Participate trouble shooting during startup and commissioning (up to 8 mandays on

site and 40 manhours remote support). GC and NWWTF to provide trade and

operation personnel to assist.

Participate Commissioning punch list and resolution.

8. Collect startup and completed checklists from Contractor as part of the project
turnover

9. Issue Commissioning Report.

N

WALDRON =

Page Image
Finance Committee - Agenda - 12/5/2018 - P20

Finance Committee - Agenda - 12/5/2018 - P21

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
21
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua Waste Water Treatment Facility ~ Energy Recovery Generator Upgrade

Construction Administration

Project Close-out

1.

wt

Update CAD drawings “for Record” based on contractor provided red-line markup.
Revision for equipment markup will be by equipment vendors.

Review major equipment O&M manuals for completeness and accuracy

Review and comment on spare parts inventories. Make recommendations regarding
specific parts and quantities to be kept on hand

Review and comment on service contracts. Make recommendations regarding
adequacy of contracts in place and frequency of service.

Review equipment warranties to ensure Owner's responsibilities are clearly defined.
Compile a Systems Operations Manual that consists of the following: design narrative
and basis of design, space and use descriptions, single line drawings and schematics
for major systems, control drawings, sequences of control and a table of all set points
and implications of changing them, schedules, startup and shutdown.

Page Image
Finance Committee - Agenda - 12/5/2018 - P21

Finance Committee - Agenda - 12/5/2018 - P22

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
22
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

City of Nashua Waste Water Treatment Facility — Energy Recovery Generator Upgrade
Construction Administration

Clarifications

1. Emission and other Environmental tests by others.

2. Load bank, if needed, by others.

3. Digested gas quality and quantity is managed by NWWTE and meet the engine
generator minimum standards. During startup and commissioning, Waldron expected
there is sufficient digested gas to operate minimum one new engine generator at any
given time.

4. Factory Acceptance Test is not included.

5. Waldron is not responsible for Warranty period for specific equipment and
components.

6. Waldron estimate uninterrupted, continuous commissioning and testing period will
last 4 weeks.

7. -No performance test is included.

8. Red-line drawings and As-built document and electronic files will be provided by
others.

9. All protection relay setting, programming, installation and third party
verification would be by others.

10. Noise Testing of completed project not included

11. Material delays or suspension in the continuous progression of the
Commissioning work which is beyond the reasonable control of Waldron will be
subject to delay and or remobilization charges. Waldron proposes to enter into
discussion with NWWTF in the development of a revised commissioning
schedule and, as a part of that process, reasonable durations for the work will
be determined and become the reference baseline for any delay or suspension.

a) In the event of such a delay, time extensions will be invoiced at Time and Material
Basis. Waldron’s rate schedule is attached for your reference.

VWWALDRON ©)

Page Image
Finance Committee - Agenda - 12/5/2018 - P22

Finance Committee - Agenda - 12/5/2018 - P23

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
23
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

Task Descriptions

Manager
$74

Construction
Schedule
On
Punch list
Final Walkthru

3. RFL& Submittal
and
T Plans and T
Interconnect
/ commissioni
W-P
Closeout

O&M Manual
Manual

TOTAL HOURS

Exhabit B-1 SUMMARY OF ESTIMATED STAFF EFFORT (HOURS) AND COSTS
Construction Adminstration for Energy Recovery Generator Upgrade

Engineer

Engineer

$32

16

Designer
$40

of Nashua

Designer
$33

Admin
4

Total Hours

Non-Labor

Direct Labor
Indrect labor
Non-Labor
Subcontractor
Sub Markup
Fixed Fee
TOTAL Fee

872

$22,872

$43,457

$600

$3,200
0

$6,633

$76,762

Page Image
Finance Committee - Agenda - 12/5/2018 - P23

Finance Committee - Agenda - 12/5/2018 - P24

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/30/2018 - 13:06
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 12/05/2018 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__120520…

op Project Lead Project Staff Lead Staff Direct labor
Task Descriptions Manager Engineer Engineer Designer Designer Admin Total Hours | Non-Labor Cost TOTAL
Typical Salary Rate $74 $52 $32 $40 $33 $24
Summary by Task for 5700 Form:
1. Pre-Con Services 12 0 16 0 0 0 28 $1,400 $4,060.00
2. Construction Observation 34 72 0 0 0 0 106 $6,260 | $18,154.00
3. RFE & Submittal Review 2 16 48 0 0 0 66 $2,516 $7,296.40
4. Startup and Commisssioning 10 58 112 0 0 4 184 $3,200 $7,424 | $24,729.60
5.Project Closeout 6 22 102 0 0 20 150 $5,272 | $15,288.80
TOTAL HOUR 64 168 278 0 0 24 534 $22,872 $69,529
$4,736 $8,736 $8,896 $0 $0 $504 Direct Labor $22,872
Indrect labor $43,457
Non-Labor $600
Subcontractor $3,200
Sub Markup $0
Fixed Fee $6,633
TOTAL Fee $76,762

Page Image
Finance Committee - Agenda - 12/5/2018 - P24

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2696
  • Page 2697
  • Page 2698
  • Page 2699
  • Current page 2700
  • Page 2701
  • Page 2702
  • Page 2703
  • Page 2704
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact