Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 2651 - 2660 of 38765

Board Of Aldermen - Agenda - 8/9/2022 - P76

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
76
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Read Concord, NH 03301

t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
WORK HOURS TOTAL
TASKIDESCHIFHON PM Structural PE SrPD Tc HOURS
Segment 2 - Path & Riverbank Enhancements
2.1 - Substation Riverbank E&S Evaluation 8 24 32
Pe OER ess ERY UAE SL ORB ee pea 0 SMh [oan 2a en OMSL RON RIE 732 — 5
TOTAL HOURS 8 0 24 0 ft) 32
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 3 $ 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ -
Project Engineer (PE) 24 § 130.60 $ 3,120.00
Sr, Project Designer | (Sr PD) 0 $ 105.00 S -
Technical Coordinator (TC) 0 5 100.00 $ .
| 32 Total Fully Burdened Labor $ 4,320.00
Subconsultant $ .
Expenses 5 100.00

Estimated Direct Costs
TOTAL ESTIMATED COST =

$ 100.00

$ 4,420,00

P:\4920 VHB - Nashua River Waik\Organization\Proposais\Final Engineering Design Proposal 05-11-22\Final Engineering

Estimate 05-11-22.xlsx

1of2

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P76

Finance Committee - Agenda - 5/4/2022 - P140

By dnadmin on Sun, 11/06/2022 - 21:42
Document Date
Fri, 04/29/2022 - 14:39
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/04/2022 - 00:00
Page Number
140
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050420…

19.

20.

21.

written amendments or modifications. Subject to the foregoing provisions, the contract
inures to the benefit of, and is binding upon, the successors and assigns of the parties.

CITY INSPECTION OF CONTRACT MATERIALS The books, records, documents and
accounting procedures and practices of DesignLAB related to this contract shall be subject
to inspection, examination and audit by the City of Nashua, including, but not limited to,
the contracting agency, the Board of Public Works, Corporation Counsel, and, if
applicable, the Comptroller General of the United States, or any authorized representative
of those entities.

DISPOSITION OF CONTRACT MATERIALS Any books, reports, studies, photographs,
negatives or other documents, data, drawings or other materials, including but not limited
to those contained in media of any sort (e.g., electronic, magnetic, digital) prepared by or
supplied to DesignLAB in the performance of its obligations under this contract shall be
the exclusive property of the City of Nashua and all such materials shall be remitted and
delivered, at DesignLAB's expense, by DesignLAB to the City of Nashua upon completion,
termination, or cancellation of this contract. Alternatively, if the City of Nashua provides
its written approval to DesignLAB, any books, reports, studies, photographs, negatives or
other documents, data, drawings or other materials including but not limited to those
contained in media of any sort (e.g., electronic, magnetic, digital) prepared by or supplied
to Designi_AB in the performance of its obligations under this contract must be retained by
DesignLAB for a minimum of four years after final payment is made and ail other pending
matters are closed. If, at any time during the retention period, the City of Nashua, in writing,
requests any or all of the materials, then DesignLAB shall promptly remit and deliver the
materials, at DesignLAB’s expense, to the City of Nashua. DesignLAB shall not use,
willingly allow or cause to have such materials used for any purpose other than the
performance of DesignLAB's obligations under this contract without the prior written
consent of the City of Nashua.

PUBLIC RECORDS LAW, COPYRIGHTS, AND PATENTS DesignLAB expressly agrees that all
documents ever submitted, filed, or deposited with the City of Nashua by DesignLAB
(including those remitted to the City of Nashua by DesignLAB pursuant to paragraph 20),
unless designated as confidential by a specific statue of the State of New Hampshire, shall
be treated as public records and shall be available for inspection and copying by any person,
or any governmental entity.

No books, reports, studies, photographs, negatives or other documents, data, drawings or
other materials including but not limited to those contained in media of any sort (e.g.,
electronic, magnetic, digital) prepared by or supplied to DesignLAB in the performance of
its obligations under this contract shall be the subject of any application for a copyright or
patent by or on behalf of DesignLAB. The City of Nashua shall have the right to reproduce
any such materials.

DesignLAB expressly and indefinitely waives all of its rights to bring, including but not
limited to, by way of complaint, interpleader, intervention, or any third party practice, any
claims, demands, suits, actions, judgments, or executions, for damages or any other relief,
in any administrative or judicial forum, against the City of Nashua or any of its officers or
employees, in either their official or individual capacity of the City of Nashua, for
violations of or infringement of the copyright or patent laws of the United

GC 10 of 13

Page Image
Finance Committee - Agenda - 5/4/2022 - P140

Board Of Aldermen - Agenda - 8/9/2022 - P77

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
77
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t 603.228.1122 hiturner.com

Nashua Riverfront Development Project

Final Engineering Oesign

5/11/2022
TASK DESCRIPTION WORK HOURS UO
PM Structural PE Sr PD Tc HOURS
Segment3-SubstationScreening | faa
3.1 - Metal Screening Structure 4 24 40 2 70
3.2 - Foundation Design 8 a 8
Preliminary (completed) 8 36 2 46
Final Design 8 24 2 34
3.3 - Flood Resiliency Evaluation 8 24 2 34
od ee ee eee
84 8 192
‘aca nel naan aaa Carian Wa ee ee em mm mw
TOTAL HOURS 36 84 24 40 8 192
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 36 § 150.00 S$ 5,400.00
Structural Engineer (Structural} 84 § 185.00 $ 15,540.00
Project Engineer (PE) 24 $ 130.00 § 3,120.00
Sr, Project Designer | (Sr PD) 40 § 105.00 § 4,200,00
Technical Coordinator (TC) 8 5 100.00 5 800.00
192 Total Fully Burdened Labor $ 29,060.00
Geotech Subconsultant $§ -
Expenses $ 150.00
Estimated Direct Costs $ 150.00
TOTAL ESTIMATED COST= $ 29,210.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P77

Board Of Aldermen - Agenda - 8/9/2022 - P78

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
78
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.

L. Turner Group Inc.

27 Locke Road Concord, NH 03301 = 4: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WORK HOURS TOTAL
PM Structural PE Sr PD Te HOURS
Segment 5 - Multi-Use Path Connector
5.1 - Erosion & Scour Determination 8 20 i 30
PUIGITISSII EROS Se SS A
TOTAL HOURS 8 0 20 0 2 30
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 8 $ 150.00 $ 1,200.00
Structural Engineer (Structural) 0 S$ 185.00 5 -
Project Engineer (PE} 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PD) ie) $ 105.00 $ -
Technical Coordinator (TC) 2 S$ 100.00 S$ 200.00
| 30 | Total Fully Burdened Labor $ 4,000.00
Subconsultant $ -
Expenses § 100.00

Estimated Direct Costs

TOTAL ESTIMATED COST =

$100.00

§ 4,100.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P78

Board Of Aldermen - Agenda - 8/9/2022 - P79

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
79
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION BVORKHCORS BQTAS
PM Structural PE SrPD Tc HOURS
Segment 6 - 53 Main Street Boardwalk 1
6.1 - Pile Redesign 2 24 6 16 2 50
6.2 - Verify 0.00 ft rise 4 24 2 30
16.3 - Structural Detailing (9)
6.4 - E&S Evaluation 4 16 2
6.5 - Final Drawings & Specifications 8 40 4 64 4 120
TOTAL HOURS 18 64 50 80 10 222
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 18 $ 150.00 $ 2,700.00
Structural Engineer (Structural} 64 $ 185.00 $ 11,840.00
Project Engineer (PE} 50 $ 130.00 5 6,500.00
Sr. Project Designer t (Sr PD) 80 $ 105,00 $ 8,400.00
Technical Coordinator (TC) 10 $ 100.00 S 1,000.00
222 Total Fully Burdened Labor $ 30,440.00
Subconsultant $s -
Expenses S 200.00
Estimated Direct Costs $ 200.00

TOTAL ESTIMATED COST = $ 30,640.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P79

Board Of Aldermen - Agenda - 8/9/2022 - P80

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
80
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301 =: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WORKRHOERS reiet
PM Structural PE Sr PD Tc HOURS
Segment 7 - Riverfront Path Along BAE Property
7.1- Erosion & Scour Determination 8 20 2 30
eas | SEWERS ST aie SMS 5 (Si Rad Ree 8 RP AO aes Le 20-0) ie 0 Gass cineca A leet
TOTAL HOURS 8 it) 20 0 2 30

ESTIMATED ENGINEERING COSTS

Work Estimated
Hours Hourly Rate Costs
Project Manager (PM)} 8 S$ 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ -
Project Engineer (PE) 20 $ 130.00 S$ 2,600.00
Sr. Project Designer I {Sr PD} fe] $ 105,00 $ -
Technical Coordinator (TC} 2 $ 100.00 $ 200.00
| 30 | Total Fully Burdened Labor $ 4,000.00
Subconsultant $ :
Expenses $ 100.00
Estimated Direct Costs ¢ 100,00

TOTAL ESTIMATED COST: $ 4,100.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P80

Board Of Aldermen - Agenda - 8/9/2022 - P81

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group inc.

27 Locke Road Concord, NH 03301 =: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WORK HOURS TOTAL
PM Structural PE $rPD Te HOURS
Segment 8 - New River Crossing (Pedestrian Bridge} 7
8.1 - Bridge Abutment - Floodway “0.00 ft rise" Analysis 8 24 2 34
8.2 - Abutment Relocation and E&S Recommendations 4 16 2 22
Bee SM Wk ates Mea [TLD a. WO PARE wa COMM eNs Oa] WN SOTeY " iS6 w
TOTAL HOURS 12 t] 40 t] 4 56

ESTIMATED ENGINEERING COSTS

Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 12 $ 150.00 $ 1,800.00
Structural Engineer (Structural) 0 § 185.00 $ =
Project Engineer (PE) 40 $ 130.00 § 5,200.00
Sr. Project Designer | (Sr PD} 0 $5 105.00 $ -
Technical Coordinator (TC) 4 $ 100,00 § 400.00
i 56 | Total Fully Burdened Labor $ 7,400.00
Subconsultant $ -
Expenses 5 100.00

Estimated Direct Costs $ 100.00
TOTAL ESTIMATED COST= 5 7,500.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P81

Board Of Aldermen - Agenda - 8/9/2022 - P82

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301 = 1: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
WORK HOURS TOTAL
OESC 1ON
Mosk voli PM Structural PE Sr PO Tc HOURS
Segment 11 - 58-60 Main Street Boardwalk ped Ns
11.1 - Design Bracket Connections 2 16 2 20
11.2 - Transition Design - Boardwalk to Ramp 2 16 2 20
11.3 - Design - Ramp & Piles 2 24 2 28
11.4 - Riverbank Slope E&S 4 16 2 22
115 - Final Drawings & Specifications 8 S6 4 80 8 156
fe Se a SY ce ey ee ee ee es ee ee es ee ee le ee ey ee ee ee ee ee ee ee ee ee es
112 20 | 246
ees ee ee 8 ere se ee ee eee
TOTAL HOURS 18 112 20 80 16 246
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 18 $ 150.00 $ 2,700.00
Structural Engineer (Structural} 112 $ 185,00 $ 20,720.00
Project Engineer (PE} 20 5 130.00 $ 2,600.00
Sr. Project Designer | (Sr PD} 80 5 105.00 $ 8,400.00
Technical Coordinator (TC) 16 § 100.00 $ 1,600.00
246 Total Fully Burdened Labor $ 36,020.00
Subconsultant $ -
Expenses 5 300.00
Estimated Direct Costs $ 300.00

TOTAL ESTIMATED COST: $ 36,320 0D

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P82

Board Of Aldermen - Agenda - 8/9/2022 - P83

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t: 693.226.1122 hiturner.com

Nashua Riverfront Development Project

Final Engineering Design

§/11/2022
TASK DESCRIPTION WORKNEORS neta
PM Structural PE SrPD Tc HOURS
Segment 12 - Bicentennial Park Renovation
12.1 - Determine Park - 4 Water Street Interface 4 16 4 2 26
2.2 - Design R ing W d i
1 esign Retaining Wall and Other Foundation 3 Ba 16 9 a4
Structures
cel Evaluate River Erosion & Scour at Modified 4 16 > 22
Retaining Wail
12.4 - Prepare Final Drawings & Specifications 2 16 4 24 2 48
TOTAL HOURS 12 56 20 44 8 140
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 12 $ 150.00 $1,800.00
Structural Engineer (Structural) 56 $5 185.00 $ 10,360.00
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PO) 44 § 105.00 $ 4,620.00
Technical Coordinator {TC} 8 § 100.00 S 800.00
140 Total Fully Burdened Labor $ 20,180.00

Subconsultant

Expenses

Estimated Olrect Costs

TOTAL ESTIMATED COST =

$ -
$ 200.00
$ 200.00

$ 20,380.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P83

Board Of Aldermen - Agenda - 8/9/2022 - P84

By dnadmin on Mon, 11/07/2022 - 07:48
Document Date
Fri, 08/05/2022 - 12:01
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 08/09/2022 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__080920…

The H.L. Turner Group Inc.

a SSS

27 Locke Aoad Concord, NH 03301

+: 603.228,1

122 ~=fhlturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WORK HOURS TOTAL
PM Structural PE Sr PD Te HOURS
Segment 13 - 4 Water Street Boardwalk eee. eta
13.1 - Boardwalk River Piles & Building
FConnections é a4 e : : we
13.2 - Boardwalk Structural Details 4 16 4 zZ 26
13.3 - Expanded Boardwalk Design Coordination ‘ 18 4 2 0
13.4 - Design Expanded Boardwalk Section 4 20 4 8 2
13.5 - Design Retaining Wall{s) & River Plies for
Expanded Boardwalk Section : 2 2 16 oy
13.6 - Design Piles - New Floating Dock 2 16 Fi 20
13.7 - Design the New Floating Dock & Gangway 2 16 18
System Including Intermediate Supports
13.8 - Re-examine Flood Rise Criteria with
Final Pile(s} Layout 24 =o.
13.9 - Assess Pile Erosion/Scour tce & Pr 12 4 is
Woody/Miscellaneous Debris Loadings
210 - D
13.10 - Prepare Final Design Drawings & 8 40 16 140 12
Specifications
FLOR Galt AL RE “4a a7 7 pra one oan Oe Ware. COUT bre Oia rp on a
Nee ae ca ea a ER 64 soe LS 72 BRL 78 Se 2 er e236 SY
TOTAL HOURS 44 172 72 176 26 490
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 44 $ 150.00 $ 6,600.00
Structural Engineer (Structural) 172 $ 185.00 $ 31,820.00
Project Engineer (PE} 72 $ 130.00 $ 9,360.00
Sr. Project Designer i (Sr PD} 176 $ 105.00 $ 18,480.00
Technical Coordinator (TC) 26 $ 160.00 $ 2,600.00
{ 490 Total Fully Burdened Labor $ 68,860.00
Subconsultant $ :
Expenses S 400.00

Estimated Direct Costs 5 400.00
TOTAL ESTIMATED COST = $ 69,260.00

Page Image
Board Of Aldermen - Agenda - 8/9/2022 - P84

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 262
  • Page 263
  • Page 264
  • Page 265
  • Current page 266
  • Page 267
  • Page 268
  • Page 269
  • Page 270
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact