Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 2511 - 2520 of 38765

Board Of Aldermen - Agenda - 4/12/2022 - P56

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (603) 594-3233

March 30, 2022
Memo #22-253

TO: Mayor Donchess
Finance Committee

SUBJECT: Sewer Replacement in the amount not to exceed $2,135,950 funded from Bond

Please see attached communications from Daniel Hudson, City Engineer, dated March 24, 2022 for project
specific details related to this purchase. Below please find a summary of the purchase approval request:

Item: 2022 Sewer Replacement Program to replace approximately 4,000 linear feet of
failing/aged sewer mains, drainage structures & pipes

Value: $2,135,950

Vendor: SUR Construction West, Inc

Department: 169 Wastewater
Source Fund: 81700 Infrastructure Improvements/ Bond

Ordinance: Pursuant to § 5-78 Major purchases (greater than $25,000) A. All supplies and
contractual services, except as otherwise provided herein, when the estimated
cost thereof shall exceed $25,000 shall be purchased by formal, written contract
from the lowest responsible bidder, after due notice inviting bids.

A competitive bidding IFB for this project was issued on 1/24/2022 and the following bids were received:

Vendor Location Amount Note

De Felice Corp Dracut, MA $2,687,820.50

S.U.R Construction West, Inc | Winchester, NH $2,135,950.00

N. Granese and Sons Inc. Salem, MA $3,262,920.00

Jennings Excavation, Inc Hollis, NH $2,076,630.25 Bid was withdrawn 2/23/22

We recommend this bid to be awarded to the lowest total cost vendor who met the IFB specified
requirements.

The Board of Public Works (3/24/2022 BPW meeting), Division of Public Works: Engineering, and the
Purchasing Department respectfully request your approval of this contract.

Regards,
Kelly Parkinson

Purchasing Manager

Ce: D Hudson
C O'Connor

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P56

Board Of Aldermen - Agenda - 4/12/2022 - P57

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
57
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

Jim Donchess
Mayor e City of Nashua

To: Board of Aldermen

From: Mayor Jim Donchess

Date: March 30, 2022

Re: Award of Contract in Excess of S1M — Sewer Replacement

Pursuant to NRO: § 5-74/B: E. Approval by the Finance Committee of a contract award in excess of
$1,000,000 shall be submitted to the full Board of Aldermen at its next regularly scheduled meeting
for final approval prior to award of the contract.

The Finance Committee has approved and placed on file the notification of the award of the
referenced contract at the April 6, 2022 meeting and as such | am requesting the full Board of
Alderman approve the following contract:

Item: 2022 Sewer Replacement Program to replace approximately
4,000 linear feet of failing/aged sewer mains, drainage
structures & pipes

Value: $2,135,950
Vendor: SUR Construction West, Inc.
Purchasing Memo#: 22-253 dated March 29, 2022
Contract Term: 2022

Thank you.

229 Main Street * PO Box 2019 * Nashua, New Hampshire 03061-2019
603.589.3260 * fax 603.594.3450 * NashuaMayor@NashuaNH. gov
www.NashuaNH. gov

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P57

Board Of Aldermen - Agenda - 4/12/2022 - P58

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

To:

From:

Re:

I. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: March 24, 2022

Daniel Hudson, P.E., City Engineer
Engineering Department

2022 Sewer Replacement Project

To approve the award the construction contract for the 2022 Sewer Replacement Project
to SUR Construction West, Inc. of Winchester, NH in the amount of $2,135,950,
contingent upon bond approval. Funding will be through: Department: 169 Wastewater;
Fund: Bond; Activity: Sewer Rehab.

The annual sewer program addresses failing, aged sewers and associated structures and
piping. The 2022 Sewer Replacement Project will replace approximately 4,000 linear feet
of sewer mains along with associated drainage structures and pipes. The contract includes
work on Blanchard St, Clement St, Donna St, Fairview Ave, Kendrick St, Kern Dr, Pike
St, Sunshine Ct and 12" St, along with miscellaneous other locations throughout the City,
Construction is expected to start in May.

Four bids were received on February 10" as follows:

Jennings Excavation, Inc. of Hollis, NH $2,076,630.25
SUR Construction West of Winchester, NH $2,135,950.00
Defelice Corporation of Dracut, MA $2,687,820.50
N Granese & Sons, Inc. of Salem, MA $3,262,920.00

Jennings Excavation, the low bidder, is a well-established local contractor; however,
upon review of their bid concerns were noted with pricing on certain items. A meeting
was held with Jennings on February 22" to discuss the City’s concerns, and upon further
consideration Jennings requested to withdraw their bid on February 23". The City
approved withdrawal of their bid and release of their bid bond without prejudice.

The second lowest bid received was from SUR Construction West, who performed well
on recent sewer replacement projects for the City and we recommend proceeding with
award to them, contingent on approval of associated sewer bonding authority.

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P58

Finance Committee - Agenda - 5/4/2022 - P33

By dnadmin on Sun, 11/06/2022 - 21:42
Document Date
Fri, 04/29/2022 - 14:39
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/04/2022 - 00:00
Page Number
33
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050420…

Jim Donchess
Mayor e City of Nashua

To: Board of Aldermen

From: Mayor Jim Donchess

Date: April 27, 2022

Re: Award of Multi-Year Contract in Excess of $1M — Biosolids Management

Pursuant to NRO: § 5-74/B: A contract that extends from the current fiscal year into succeeding
fiscal year(s) in which no funds have been appropriated nor otherwise designated for this purpose
shall be approved by the full Board of Aldermen before the contract shall become binding on the
City and NRO: § 5-74/B: E. Approval by the Finance Committee of a contract award in excess of
$1,000,000 shall be submitted to the full Board of Aldermen at its next regularly scheduled meeting
for final approval prior to award of the contract.

The Finance Committee has approved and placed on file the notification of the award of the
referenced contract at the May 4, 2022 meeting and as such | am requesting the full Board of
Alderman approve the following contract:

Item: Management of Biosolids at the Nashua Wastewater Treatment
Facility
Value: $2,944,960
Vendor: Resource Management of Holderness NH
Purchasing Memo#: 22-260 dated April 27, 2022
Contract Term: 3 Years
Thank you.

229 Main Street * PO Box 2019 * Nashua, New Hampshire 03061-2019
603.589.3260 * fax 603.594.3450 * NashuaMayor@NashuaNH. gov
www.NashuaNH. gov

Page Image
Finance Committee - Agenda - 5/4/2022 - P33

Board Of Aldermen - Agenda - 4/12/2022 - P59

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

2022 Sewer Replacement Project
IFB0779-021022

Construction Specifications
and
Contract Documents

Prepared By:

Hayner/Swanson, Inc.
3 Congress Street
Nashua, NH 03062
Tel: (603) 883-2057

Ww
Vow wa %,

PAUL
F.
HAYNER, JR.
No.3817

Prepared For:

City of Nashua, New Hampshire
Division of Public Works
Engineering Department

January 2022

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P59

Board Of Aldermen - Agenda - 4/12/2022 - P60

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

TABLE OF CONTENTS

DIVISIONS
1 BID FORM wince cece reece eect renee ene Een EEE OnE e Een E Eee enone dade nent eee te eeeteeeeaeeeete
BID SCHEDULE occ een eee enn renee en Eee enn nE eee cone tadeteneeee te nneeteseneaeeeeee
BID BOND wince eect ee ree enn EEE eA Ee en Eee Ec nE Eee ecnnt dade fone eeeteeeeteeeaeeeeee
CONTRACTOR’S QUALIFICATIONS 0... eeccecccceeeeeeeceeeeeeeeeeecceseeeseeeeccesneeseeeseceentesieeeees
2 PAYMENT BOND oui. eccccccee ec ente eect tte e een ne ee ented erent ee een nt eee tent teeeneneeeeneeneetenenneeeeee
PERFORMANCE BOND u0... ce cececeeette cee tene ee eet nnee erent ie eee entne eee ceneteeeseneeeenennetesennneeeeee
CERTIFICATE OF LIABILTY INSURANCE ooo. cceeeceteeeeeeeneeeeeeeneeesenieeessneitereentaeegs
3 CONTRACT AGREEMENT, .....eeccccccceeeecteeeeeeneteeeeentieeeecnneeeeencneeeeseeneesesenieeeesennitereennaeags
4 GENERAL CONDITIONS 0c entre nent ents ee ieee renieeeteniiterennieteeennies
5 SUPPLEMENTARY CONDITIONS... eccentric r enti eee tiiieeesiniieeseniiereeniteeeenies
6 EXHIBITS ooo ececcee eect eee eee een e eee E eee Eee EEE OnE ee Een E Eee eee t ede eneete te nneeteeeaeeeeee
A. NOTICE OF AWARD
B. NOTICE TO PROCEED
C. CHANGE ORDER
D. CERTIFICATE OF SUBSTANTIAL COMPLETION
E. CERTIFICATE OF FINAL COMPLETION
F. CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN
7. TECHNICAL SPECIFICATIONS 0. ccc eeerre en ti errr enee erent eeeeneneeeetetieeetentitenesnieeeeennnes

Table of Contents Page 1 of 1

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P60

Board Of Aldermen - Agenda - 4/12/2022 - P61

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
61
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

THE CITY OF NASHUA

Adcrenattesine Parvice i:
Purchanng De pacha ct

“The Gate City”

Addendum 1

IFB.0779-021022
Sewer Replacement Project

February 1, 2022
Information included in this document becomes a part of the original |FB

if you are submitting a paper bid, please sign below to indicate receipt of this additional information and
include this page with your bid submittal. If you are submitting a proposal via Bid Express please be sure
to acknowledge the addendum on the website before submitting your proposal

Addendum 1 is being issued to modify the work as depicted on plan sheet #4 and to extend the deadline
for questions for this IFB. The deadline for questions is now Thursday, February 3, 2022,

All other aspects of the original document remain the'same.

Please sign and return this page with your submitted proposal, Failure to acknowledge the addendum
will result in the bid submittal being disqualified

| acknowledge that Addendum 1 has been received and incorporated into bid submittal for FB
0779-071022.

{7A
Authorized Signature go
Ap 02a
Date

he

Name of Firm

229 Main Street « Nashua, New Hampshire 03061 + Phene (603) 589-3330 « Fax (603)
589-3233

“The Gate City”

Adrrarustutivy Eaevice +
Prxchaning Deparorent

Addendum 2
IFB.0779-021022
Sewer Replacement Project

February 4, 2022

tnformation included in this document becomes a part of the original IFB

if you are submitting a paper bid, please sign below to indicate receipt of this additional information and
include this page with your bid submittal, If you are submitting a proposal via Bid Express please be sure to
acknowledge the addendum on the website before submitting your proposal.

Addendum ? ts being issued to modify the plan sheet with the initial IFB.
All other aspects of the original document remain the same.

Please sign and return this page with your submitted proposal. Failure te acknowledge the addendum will
result in the bid submittal being disqualified,

lack ledge that Addendum 2 has been received and incorporated into bid submittal for IFB
0779,034022

Z, MXLod Ne

Authorized Signature

Qf 7an2a

Date
SUA Conshuchon WEA, Tne

Name of Firm

229 Main Street * Nashua, New Hampshire 03061 « Phone (603) 589-3330 » Fax (603)
589-3233

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P61

Board Of Aldermen - Agenda - 4/12/2022 - P62

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
62
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

THE CITY OF NASHUA “The Gate Chy’

Adeninistrative Service 5
Purchasing Deparkerent

Addendum 1

FB 07 79-021022
Sewer Replacement Project

February 1, 2022
information included in this document becomes a part of the original IFB

If you are submitting a paper bid, please sign below to indicate receipt of this additional information and
include this page with your bid submittal. if you are submitting a proposal via Bid Express please be sure
to acknowledge the addendum on the website before submitting your proposal.

Addendum 1 is being issued to modify the work as depicted on plan sheet #4 and to extend the deadline
for questions for this IFB. The deadline for questions is now Thursday, February 3, 2022.

All other aspects of the original document remain the same.

Please sign and return this page with your submitted proposal. Faiture to acknowledge the addendum
will result in the bid submittal being disqualified.

| acknowledge that Addendum i has been received and incorporated into bid submittal for IFB
0779-021022.

Authorized Signature

Date

Name of Firm

229 Main Street * Nashua, New Hampshire 03061 +« Phone (603) 589-3330 « Fax (603)
589-3233 |

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P62

Board Of Aldermen - Agenda - 4/12/2022 - P63

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
63
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

February 1, 2022

IFB0779-02 1022
ADDENDUM No, 1

2022 Sewer Replacement Project

Addendum No. 1 is being issued to modify the work as depicted on Plan Sheet #4 (Clement
Street), and to respond to a question raised during the pre-bid meeting:

I. REVISED PLAN SHEET 4 of 17

Please be advised that Plan Sheet #4 - Clement Street has been revised to address
concerns related to the 16-inch water line installation, and the addition of a 12-inch
gate valve and air release assembly. A revised SHEET 4 of 17 is attached for use by
Bidders (See attached PDF).

2. MEASUREMENT AND PAYMENT ~ ITEM IJ

Please be advised that the description for Pay Item IJ has been revised. The revision
applies only to PAY ITEM IJ as follows:

2.01 SANITARY SEWER AND DRAIN ITEMS ©

MEASUREMENT AND PAYMENT FOR ITEM 1:

Measurement:

The quantity to be measured under ITEM 1J for partial removal and replacement of
existing sewer line will be measured, complete-in-place, by the LINEAR FOOT along
the completed actual length of installed pipeline.

Payment:
The accepted quantity of sewer pipe installed shall be paid for at the contract unit price

under ITEM IJ and shail constitute full compensation for removal and disposal of
portions of the existing sewer pipe and surplus material from the pipe bedding and sand
blanket, and furnishing and installing a new 18-inch diameter PVC pipe (ASTM F679
- PS115), including but not limited to handling of existing wastewater flows, by- pass
pumping, excavation, pipe bedding and sand blanket, backfill, removal and disposal of
surplus and unsuitable materials at the City landfill, testing and video inspections,
furnishing all materials, labor, tools, and equipment necessary to complete the work
complete in place, all as specified in these Specifications and as directed by the
Engineer.

2022 Sewer Replacement Project Addendum No. !
Nashua, NH

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P63

Board Of Aldermen - Agenda - 4/12/2022 - P64

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
64
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

In addition, Pay Item IJ shall include the following work related to the Pennichuck
Water Works (PWW) requirements for the shut down and proposed sewer crossing of
the existing 16-inch diameter water main as follows:

a,

The Contractor shall submit a detailed Work Plan, Traffic Control Plan (TCP),
and a Schedule for review and approval by the City and PWW at least three (3)
weeks in advance of the work.

The Contractor shall furnish and install a 12-inch gate valve including necessary
pipe, fittings and couplings in the existing water main at a location approximately
100 feet south on the 16-inch water main crossing. The new valve is located in a
grass shoulder alongside Daniel Webster Highway, and shall be “cut-in” to the
existing 12-inch cast iron main. A 2-inch air release assembly is also required at
this location (See Detail).

Prior to crossing the existing 16-inch water main and after shut down, the
Contractor shall cut and remove a portion of the 16-inch water main. The length
of existing 16-inch main to be removed is approximately 30 linear feet, and shall
span the sewer trench excavation to a point 3-feet minimum beyond the limits of
the trench excavation on each side. The existing 16°x16” Tee shall be removed
and salvaged to PWW.

The sewer main shall then be installed and backfilled in accordance with the
project specifications. In addition, backfill under the 16-inch water main shall
conform to the details on the plan, and shall consist of crushed gravel (NHDOT
Item 304.3), compacted in 12-inch lifts to 95% ASTM D1537, Method C.

The water main shall then be reconnected with approximately 30 linear feet of 16-
inch Class 52 Ductile Iron (Zinc Coated) water main, bell clamps at all water
main joints, and two (2) solid sleeves.

Water main bedding, backfill and all materials and workmanship shall conform to
the requirements of “Pennichuck Water Works, Technical Specifications for
Water Main, Hydrant and Service Installation, latest edition”.

All work associated with the water main including the “cut-in” 12-inch gate valve
installation shall be considered incidental to and included in the 18-inch sewer
line unit price (Item 1]).

Any PWW fees shall be paid directly by the City.

Note:
« The restoration of landscape areas, and pavement and base course gravels
shall be paid for separately under the appropriate ROADWAY
RESTORATION contract items.

« Flowable fill of the remaining 18-inch sewer left in place shall be paid for
under Pay Item 8 - Flowable Fill for Pipe Abandoned in Place.

2022 Sewer Replacement Project Addendum No, |

Nashua, Nit

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P64

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 248
  • Page 249
  • Page 250
  • Page 251
  • Current page 252
  • Page 253
  • Page 254
  • Page 255
  • Page 256
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact