Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 20921 - 20930 of 38765

Finance Committee - Agenda - 6/1/2016 - P102

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
102
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

3. Wildlife Services will provide bird harassment training as required of landfill
personnel,

4, Wildlife Services will assist the City in obtaining a USFWS depredation permit for
2016-2017, Wildlife Services will assume responsibility for processing the USFWS
permit application for the City’s signature.

5. Wildlife Services will continue monitoring efforts of wildlife activity and presence at
the nearby Ledgewood Hills condominiums and other surrounding areas deemed to be of
concern to the City and impacted by gulls, starlings or other birds associated with Four
Hills Landfill activities to assess the effectiveness of the integrated gull harassment
program. Wildlife Services will also conduct harassment activities at the Ledgewood
Hills condominiums and other identified nearby properties as necessary and agreed upon,
to reduce gull activity and associated damage to property.

6. Wildlife Services will conduct woodchuck control activities on landfill property to
reduce burrowing activity and potential damage to landfill property as requested.

7. Wildlife Services will provide the City and other interested parties a summary report
including recommendations of integrated harassment activities.
Effective Dates

The cooperative agreement shall become effective on July 1, 2016, and shall expire on
June 30, 2017,

Page Image
Finance Committee - Agenda - 6/1/2016 - P102

Finance Committee - Agenda - 6/1/2016 - P103

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
103
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

ATTACHMENT B
FINANCIAL PLAN
July 1, 2016-June 30, 2017

Personnel Costs 00.00. .....ccceceeeveeevesuvevvevessaevecencausesseceusaneuseusenesiseureens $47,267.00
Vehicle Fuel oe cciccccsccccceacecccsecacecuceucensaesesserseareusvassresecscere $ 4,131.41
Supplies & Equipment. 0000... .... ccc ccccccccesceesseeececusveceucvevceseauesnansavevesseens $1.843.00
Subtotal (Direct Costs) 0.0.0... cccccccccacscccccasecuseecevcueereeceucesauensesenstunenss $53,241.41
Pooled Job Costs oo... ccccccecccecccsaeceecceecccuueeeueeeseeuceutuneesereseuesececeea yess $5,856.56
Indirect Costs... sws.. ss. jee cgieveg ected ces Eeeeeteccaceascascatacecocgervensuereasses $8,598.49

TOTAL 00... cceceee sees renee cece $67,696.46

The distribution of the budget from this Financial Plan may vary as necessary to
accomplish the purpose of this agreement, but may not exceed $67,696.46

Financial Point of Contact

Cooperator: City of Nashua Financial Services (603) 589-3171
Phone
APHIS, WS: Jane Tuttle (603) 223-6832

Phone

Page Image
Finance Committee - Agenda - 6/1/2016 - P103

Finance Committee - Agenda - 6/1/2016 - P104

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
104
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

THE CITY OF NASHUA “The Cate City”

Financial Servtces

Purchasins Department

May 26, 2016
Memo #16-142

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: TO APPROVE A PROFESSIONAL SERVICES CONTRACT WITH SANBORN, HEAD &
ASSOCIATES, INC FOR GAS COLLECTION AND CONTROL SERVICES (VALUE:
$45,000)

DEPARTMENT: 168 SOLID WASTE; FUND: SOLID WASTE
ACCOUNT CLASSIFICATION: 81 CAPITAL IMPROVEMENTS

Please see attached communication from Jeff Lafleur, Solid Waste Department Superintendent dated
May 26, 2016 for the information related to this purchase.

Pursuant to § 5-83 Professional services. A. (2) Specific experience with similar projects; or earlier
phases of the same project.

The Solid Waste Department Superintendent, Board of Public Works (May 26, 2016) and the Purchasing
Department recommend the award of this contract in an amount of $45,000 to Sanborn, Head &
Associates, Inc. of Concord, NH.

Respectfully, _.

~ (Dan Kooken
Purchasing Manager

Cc: J Lafleur L Fauteux

229 Main Street « Nashua, New Hampshire 03061 e Phone (603) 589-3330 e Fax (603) 589-3344

Page Image
Finance Committee - Agenda - 6/1/2016 - P104

Finance Committee - Agenda - 6/1/2016 - P105

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
105
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

To:

From:

Re:

A. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: May 26, 2016
Jeff Lafleur, Superintendent of Solid Waste

Additional Gas Collection and Control Services (GCCS) by Sanborn, Head & Associates,
Inc. (SHA).

To approve a professional services contract with Sanborn, Head & Associates, Inc.
(SHA) of Concord, NH to provide the Solid Waste Department with assessment, design
and bid and construction services for the landfill’s Gas Collection and Control System in

the amount of $45,000.00. Funding for this contract is through Department 168 Solid
Waste; Fund: Solid Waste; Account Classification: 81 Capital Improvements.

L. Scope of Services
2, Summary of Fee
Sanborn, Head & Associates, Inc. (SHA) has been asked to provide the Solid Waste

Department with the following services for the landfill’s Gas Collection and Control
System (GCCS) through the end of FY16 and continuing into FY17:

e Landfill Phases I and If GCCS Assessment

e Dewatering System Conceptual Design

* GCCS Expansion in Phase II, Stage II Design

« Bid and Construction Phase Services

Each of these items is outlined in the attached Scope of Services provided by SHA.

SHA is the Solid Waste Department’s general engineering services provider and also

provides the department with landfill gas monitoring services making them uniquely
qualified to provide the requested services.

Page Image
Finance Committee - Agenda - 6/1/2016 - P105

Finance Committee - Agenda - 6/1/2016 - P106

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
106
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

SANBORN |

3

| HEAD

Building Trust. Engineering Success.

;

Mr. Jeff Lafleur April 21, 2016
Superintendent File No. 3066.06
Nashua Division of Public Works, Solid Waste Department

840 West Hollis Street Sent via emaili

Nashua, NH 03062

Re: Additional GCCS Related Services
City of Nashua Four Hills Landfill
Nashua, New Hampshire

Dear Jeff:

Sanborn, Head & Associates, Inc. (Sanborn Head) appreciates the opportunity to revise our
proposed scope of engineering services to the City of Nashua (City) relative to the Four
Hills Landfill. The scope of services presented herein is based on communication with the
City regarding additional gas collection and control system (GCCS) related services to be
completed by Sanborn Head for the City during FY 2016 and FY 2017,

Task 1 Phases | and 11 GCCS Assessment

For this task, Sanborn Head will perform an assessment of the condition and operation of
the GCCS in the closed, unlined landfill as well as Phases | and I] of the active, lined landfill.
The assessment will include the following:

e Using LFGMS, Sanborn Head will review recent wellfield data collected by the City;

= Schedule a two-day site visit to meet with City personnel to better understand current

on-site GCCS monitoring practices and procedures. As part of the site visit, we would

perform:

o A visual inspection of GCCS components (eg. wellheads/ports, boot seals,
lateral/vacuum lines, etc.);

o A landfill cover integrity assessment;

ao Gas well monitoring/data collection as necessary after initial wellfield data review;
and

o GCCS and landfill cover surface emissions monitoring at locations identified during
wellfield data review and site visit;

« Review data collected during the site visit; and

= Prepare a GCCS assessment report. The report will summarize our findings and present
our recommendations for corrective actions to improve wellfield performance.

SANBORN, HEAD @ ASSOCIATES, INC. www.sanbornhead.com

Page Image
Finance Committee - Agenda - 6/1/2016 - P106

Finance Committee - Agenda - 6/1/2016 - P107

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
107
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

April 21 2016 Page z
20160421 Ph Nl Stage lf LFG Prapasal (revised).dacx 3066,06

Task 2 Dewatering System Conceptual Design

For Task 2, Sanborn Head will prepare a conceptual design and an opinion of cost for
removing liquid from LFG extraction wells in the closed, unlined landfill as well as Phases I
and II of the active, lined Jandfill. We understand that the City will be providing liquid level
measurements from the existing LFG wells for our review. We envision that the liquid
removal system will be composed of a series of submersible, air-powered pumps installed
in the wells and connected to force main pipes that discharge to leachate collection system
(LCS) risers along the perimeter of the lined landfill. Considering the number of wells
(some of which may be replaced or extended as the active Jandfill is Filled) and the potential
volume of liquid to be removed, a manifold system with quick disconnects will be designed
to provide compressed air to the pumps and connections to a drain for the pump discharge.
The design will include a dedicated pump for each well.

As part of this task, Sanborn Head will evaluate the existing air compressor located at the
Landfill Gas-to-Energy (LFGTE) facility to assess its potential in supporting the dewatering
system. The evaluation will include the air compressor and air drier (needed to limit
potential for freezing of the distribution lines), and power requirements for the electrical
equipment.

The conceptual design of the dewatering system will be presented on engineering drawings
provided electronically to the City. The engineering drawings will illustrate the air
compressor and drier layout, the manifold systems for the compressed air and liquid
discharge lines, and details that depict the pipe installation and connection details. In
addition, the design will include modifications to the LCS risers and to the well risers to
accommodate the following components: (i) LFG control wellhead; (ii) liquid removal
pump; and (iii) pneumatic liquid head monitor. The pneumatic liquid head monitor
provides a means to measure the head of liquid in the extraction well without disabling the
extraction oy pumping system. Technical specifications for materials and equipment will
be presented on the engineering drawings, and an opinion of cost based on the conceptual
design will be provided to the City.

We propose a conference call with the City as part of this task to discuss the design of the
dewatering system, opinion of cost, and steps for moving forward should the City elect to
proceed.

Task 3 GCCS Expansion in Phase li, Stage 0

Under this task, Sanborn Head will work with the City to design the next expansion to the
GCCS in Phase II, Stage II of the active landfill, We understand, based on discussions with
you, that the design is likely to include six new LFG collection trenches, one surface LFG
collection trench, and associated lateral conveyance piping and connections to the existing
GCCS. We anticipate our services to include the preparation of construction-level
drawings, technical specifications, bid item definitions, an opinion of cost for the project,
and a New Hampshire Department of Environmental Services (NHDES) Type II Permit
Modification application form with a narrative describing the proposed construction. The
drawings will be signed and sealed by a professional engineer licensed in the State of New

SANBORN |) HEAD

Page Image
Finance Committee - Agenda - 6/1/2016 - P107

Finance Committee - Agenda - 6/1/2016 - P108

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
108
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

April 21 2016 Page 3
20160421 Ph H Stage ll LFG Proposal (revised).docx 3066.06

Hampshire. The documents will be provided to the City in Adobe Acrobat (ie, *.pdf)
format.

Task 4 Bid and Construction Phase Services

Sanborn Head understands that the City will prepare and issue bid documents for the
project. However, during the bidding process, a Sanborn Head representative will prepare
for and attend the pre-bid meeting. We understand that the City will prepare the meeting
minutes. Sanborn Head will also assist the City in addressing written questions from the
bidders.

Prior to initiating construction, a Sanborn Head representative will prepare for and attend
the pre-construction meeting. We understand that the City will prepare the meeting
minutes. During construction, Sanborn Head will provide limited observation services (i.e.,
observations limited to installation of critical components) and engineering support
services during construction of the GCCS Expansion in Phase II, Stage Il We anticipate our
services to inciude the following:

= Reviewing Contractor’s submittals and answer questions regarding design intent,
materials, and material testing;

« Observing the Contractor’s work to evaluate it for conformance with the construction
documents;

s Addressing Contractor's questions; and

=» Documenting the progress of the Contractor's work through Daily Field Reports.

Sanborn Head will provide a representative to observe and document the installation of
critical GCCS components for conformance with the drawings and technical specifications
and prepare the required field logs. In addition, Sanborn Head’s representative will
observe pipe pressure testing, HDPE pipe welds, pipe connections into the existing system,
and final well connections, performed by the Contractor.

It is our understanding that the City will observe and document the installation of the
surface collectors, and the header and lateral pipe trenching. The as-built survey of
completed features will be performed by others and will be provided to Sanborn Head in an
electronic format (i.e., dwg).

For budgeting purposes, we assunie that the construction observation will be completed
over seven (14) days, and that our representative will be on-site part time (80 hours total}

during this period, Our observations will be limited to installation of critical components.

Following the completion of the construction, and as required by the NHDES, we will
prepare a report that documents the construction work performed. The report will
address the construction activities observed, test results, and variations in construction
relative to the drawings and specifications, if any. The report also will include record
drawings, photographs, and field test data. The statements presented in the report will be
limited to the extent of our observations and our review of submittals and test results. The

SANBORN |) HEAD

Page Image
Finance Committee - Agenda - 6/1/2016 - P108

Finance Committee - Agenda - 6/1/2016 - P109

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

April 21 2016 Page 4
20160421 Ph i Stage (1 LFG Proposal (revised).dacx 3066.06

report will be signed and sealed by a professional engineer licensed in the State of New
Hampshire. Paper copies and an Adobe Acrobat (i.e., *.pdf) electronic copy of the report
will be issued to the City.

BUDGET ESTIMATE AND BASIS OF BILLINGS
The total estimated budget for this proposal is $45,000 as itemized below:

Task | Task Description Succ _
1 Phases | and II GCCS Assessment $6,000
2 Dewatering System Conceptual Design $10,000
3 GCCS Expansion in Phase I, Stage II $12,000
4, Construction Observation Services $17,000

We will invoice for our services based on actual accrued time and expenses in accordance
with the attached Schedule of Fees. We will not perform services beyond those defined
herein without first receiving written authorization from the City. Our City-specific
Schedule of Fees is enclosed for your information.

SCHEDULE

Sanborn Head is available to begin working on this project following written authorization
to proceed from the City.

TERMS OF ENGAGEMENT / ACCEPTANCE

The terms of engagement are described in our Agreement with the City of Nashua, New
Hampshire dated July 21, 2011. We understand that acceptance of this scope of services
will be provided in a City issued Purchase Order to Sanborn Head for these services.

CLOSING

Thank you for the opportunity to submit this scope of services. We look forward to
working with you on this project. Please contact us should you require additional
information.

Very truly yours,
SANBORN, HEAD & ASSOCIATES, INC.

o
Le Cee) S SKeaclesess

Eric S. Steinbauser, P.E,, CPESC, CPSWOQ
Senior Project Director

RLC/ESS/DEA/LLD:rlc/Ild
Enclosed: Schedule of Fees

P:\3000s\3066.06\ Project Control\Phase H Stage Hl LFG Proposal\20160421 Ph II Stage Il LFG Proposal (revised).dacx

SANBORN I HEAD

Page Image
Finance Committee - Agenda - 6/1/2016 - P109

Finance Committee - Agenda - 6/1/2016 - P110

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
110
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

SANBORN I HEAD

Building Trust. Engineering Success,

SANBORN, FLEAD & ASSOCIATES, INC.
2015 Sched ile of F Fees
LU

City of Nashua, NH
Senior Vice President $194
Vice President $184
Project Director $173
Senior Project Manager $148
Project Manager $138
Senior Engineer/Geologist $120
Project Engineer/Geologist $112
Engineer/Geologist $102
Supervising Technician $92
Senior Engineering Technician $83
Engineering Technician $77
Support Staff $66
Subcontractors and Outside Services Cost plus 10%
Other Direct Expenses Cost plus 10%

Hourly rates will be charged for time worked on the project and for the time required for
travel between the office and the meeting or project site. Local travel will be at IRS allowed
rates.

Overtime hours will be charged using the hourly rates listed above.

Hourly rates for expert witness testimony, including preparation time, and other special
services such as corporate acquisition due diligence studies that generally require a

dedicated commitment of senior staff, will be provided upon request.

Sanborn, Head & Associates, Inc, reserves the right to revise this Schedule of Fees annually.

PA\3000s\ 3066.05 \ Project Contral\SWCSA Srd-2015 (Nashua).docx

SANBORN, HEAD & ASSOCIATES, INC. ww wisanbornhead.com

Page Image
Finance Committee - Agenda - 6/1/2016 - P110

Finance Committee - Agenda - 6/1/2016 - P111

By dnadmin on Mon, 11/07/2022 - 09:53
Document Date
Wed, 06/01/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/01/2016 - 00:00
Page Number
111
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060120…

CONTRACT FOR PROFESSIONAL SERVICES

GAS COLLECTION AND CONTROL SYSTEM SERVICES
PHASE II
FOR
FOUR HILLS LANDFILL

A CONTRACT BETWEEN

THE CITY OF NASHUA, 229 MAIN STREET, NASHUA, NH 03061-2019

AND

SANBORN HEAD, HEAD & ASSOCIATES
and its successors, transferees and assignees (together “Professional Engineer”)
NAME AND TITLE OF PROFESSIONAL ENGINEER

20 FOUNDRY STREET
CONCORD, NH 03301
ADDRESS OF PROFESSIONAL ENGINEER

WHEREAS, the City of Nashua, a political subdivision of the State of New Hampshire,
from time to time requires the services of a Professional Engineer ; and

WHEREAS, it is deemed that the services of a Professional Engineer herein specified are
both necessary and desirable and in the best interests of the City of Nashua; and

WHEREAS, Professional Engineer represents they are duly qualified, equipped, staffed,
ready, willing and able to perform and render the services hereinafter described;

Now, THEREFORE, in consideration of the agreements herein made, the parties mutually
agree as follows:

1. DOCUMENTS INCORPORATED. The following exhibits are by this reference incorporated
herein and are made part of this contract:

Exhibit A--General Conditions for Contracts
Exhibit B--Scope of Services, Contract Time, Fee Schedule

The Contract represents the entire and integrated agreement between the parties and supersedes

prior negotiations, proposals, representations or agreements, either written or oral. Any other
documents which are not listed in this Article are not part of the Contract.

AG 1 of 3

Page Image
Finance Committee - Agenda - 6/1/2016 - P111

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2089
  • Page 2090
  • Page 2091
  • Page 2092
  • Current page 2093
  • Page 2094
  • Page 2095
  • Page 2096
  • Page 2097
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact