Board Of Aldermen - Agenda - 6/14/2022 - P49
Elm Street Planning Study
Community Meeting 1 Follow-Up
April 14th, 2022
MARVEL ©Nashua
Elm Street Planning Study
Community Meeting 1 Follow-Up
April 14th, 2022
MARVEL ©Nashua
Audience Poll Responses
Should the new development be iconic, M nriet:
contextual,.or subtle? .........
Cont al Subtle
iy
2 MARVEL 145 Hudson St. New York, NY 10013 - 161 Calle San Jorge, San .van, PR 00911 - marveldesigns.com Elm Street Planning Study | April 11, 2022
Audience Poll Responses
What would you prioritize as most critical forthe “““""
redevelopment of this site?
3
DeseceUtew. ese sinters a tro] Kita nts
Preservation Renovation of Maximizing Greating new
of the historic- the existing new public open
school 3 Keefe development space
building Auditorium potential
3 MARVEL 145 Hudson St. New York, NY 10013 - 161 Cale San Jorge, San Juan, PR 00911 - marveldesigns.com Elm Street Planning Study | April 11, 2022
4
Community Meeting Input Compiled
Wonderful lecation! Gottecting tne history ol the site as on open space
EXISTI NG SITE Keefe Is an Important resource for the community Mixed4incoms housing # great {tt for the eite thal can be Gelanced
Need effordatte housing aL)
feonie potential thet dossn't aust In Mashue right new
. . 4 Koete offers huge poten lal (or geteway for arts in Neshus - largest
Why is this site important to you? In state Big enough to support Keefe, se well as park epece and some
Rae affordable houning
Alot families looking for more egtions lor supportive housing afd
Love the historic buliding few housing typategies to support diversity within families
SS FE or EET prosienty to adult earning center = making K accessible to feria * Wine: Visions NH (reference!
. s tts brow ~~} vs Inthe aree :
me : a
ie
i
: ite ET ie tS el AE on at an
tain livin as tig AIS? hc oe = SS Stan
| Stacy: Largest school Ih NM, Walking commynit; ;
_ New development to cany that and make
4 — youth contered, improving Keefe. Fackty where
© youth can garner,
W OTTERSON STREET
CHESTNUT STREET 5.
eter ong BS
MEE ins assy na) my we Seay.
: . . —_-..
Dan O'Donnel Keop keete Is important. ree, . Fa,’
et oe Soni
gne. a
ne er dete oer
S Betay: Housing. Boutique, graan saeace. Parking
_ Barage nesded. Gig open space should be
37) preserved end could be pragrammed from tima
wv
oe,
eS
nat
Jeon Moran:
through
a
At, © dasdttochumn bs resource thet cant be replaced
a ~
—» _ Rousing Low income Moed Ages SS “ 2 ee g
as Sally Newhal: ratieed pastor trem Nashue — Ketsty Baaade. pastor Mathodiet 2" Pamela end flon Schwartz: pesstenate stout
ciate Le ldeziinstion Presbyteria s ehyrch, Incvedibie need tor =. church an Main Si, would ke ‘WE keeping Keate tor Symphony NH and =
"11m." FE Don Hain; new to Nashua. ying te keepin
t
— ewe - r
D | Ny <7 # indeperrient apace. A bot mora parking la x ‘y
Hous working famites + chikiran to slay. concemed pout porking eoded. one
Community Performence Center Fsed'siscnd ae artiaapes “ nthe Relea Sie th be Se z L
spece z eer werd TEED Sou te a i .
; Gye ore an important resource ree eee housing In eree. woukd Nhe 10 06 Deenna Hoying: Symphony NH. Keete SUPE ‘ ®. Ks rs 3 ~ + 4 7
> in, ‘Criia eng Kubert Buchanan: from ‘WF, housing. Keefe, mixed use. med _ possibiices for romalnder of state. other aera: 3 RS
_ > Housing at a renge ef income dands- ow to amberat. own property on Beine + tincome) =H pets of state use verve. Lon ; : = WUT ren ~
‘worktorce Nousing and ranges of oges emanky eccess, on sxe parking
MARVEL 145 Hudson St. New York, NY 10013 - 161 Cale San Jorge, San Juan PR 00911 = marveldesigns.com Elm Street Planning Study | A¢-l 11, 2022
MARVEL
Breakout Responses
Density Themes
Low density might be contextual, but will not alleviate lack of
housing, solve the housing affordability problem, or maximize
development of the site.
Mid-rise density most widely supported. Should be balanced with
open space for the community.
People want open space, but understand the financial burden and
lack of affordable housing in Nashua.
Program Themes
Residential is most needed.
Preservation and renovation of the Keefe is very important and
would maintain an arts and cultural component on the site.
Mixed use can add vibrancy and was most widely supported.
Active recreation for youth and seniors, Skating rinks and pools
are elsewhere in city and not needed. Gyms are needed.
Do not need commercial or retail, unless a smaller retail
component within a mixed use development. Want more
restaurants and cafes, less stores.
More for the community/neighbors than a destination attractor
Open space is good. Want mix of quiet and program that
addresses needs of the neighborhood.
145 Hudson St. New York, N¥ 10013 - 161 Calle San Jorge. San Juan, PR 00911 + marveldesigns.com
General Themes
Many supported adaptive reuse of the historic school building,
historic character is worth preserving
Extensive feedback noting the need for affordable, supportive, and
mixed income housing
Consensus for balanced development of the site
Parking needs to be improved
Make sure there is enough shade and trees
Proximity to Adult Learning Center is worth noting
People want space for the community
Elm Street Planning Study | April 11, 2022
Community Meeting Input Compiled
sonaleee market (ot remaining
~~ portlen of site
/
f SM does nett wert marion to decode
(pom Seem OITENL. WHOS city to took a OH: typically $.32/ pp outside of richer
orice, out-ol-town incresans 19 $46/D0.
PROGRAM ff Taam
poe Meonle devalapment would draw people In
/ from furihes wermy, Just went to Sumi
What types of program would draw you and other residents ottné city of Nashua to the site?
owe Pace /®
Jy .
My sau © Perr ©
fen importance of peta/cuttucal,
/
resco
prema pale Leen
RET Cre :
Community Facility
ved det for eaciusive reskdantiol
of sie, site has
“to peovide something of euftoral value 10
peetemitals mls at semidendal be anne
Elm Street Planning Study | April 11, 2022
6 MARVEL 145 Hudson St. New York, NY 10013 - 161 Cale $an Jorge, San Juan, PR 00911 - marveldesigns.com
Community Meeting Input Compiled
_~ tel ghboriig chliicata center, United Way
triton) Chunedll and advécacy commities
DEVELOPMENT DENSITY fo-abo pele peri
On chdcare center Bross ihe Street
What type of development density do you feel is appropriate for this site? , a
could be convinced of high
denalty, # ¢ eemspece G2
LOW DENSITY DEVELOPMENT @@ OOO @OOCOS men OObbese bande
t
HIGH DENSITY DEVELO
-
ota} =
| 54]
Could ba a couple mtories
larger then Keate
MARVEL 145 Hudson St, New York, NY 10013 - 161 Cale San Jorge San Juan PROOS11 marveldesigns.cam fim Street Planning Study | April 11. 2022
Community Meeting Input Compiled
PROGRAM <a
arta (DH). combination is god
What types of program would draw you and ial residents of the City of Nashua to the site?
already a basketball court in
appari young people In esiati nat bide. oooM and skating
eed within the city {Fos} tha commanity fs J rates eeewhere in town
a a / all sounds good to H+C Buchanan
INDOOR RECREATION (OD MDE x
we. ror) ties 3 ork c -o c
y . ;
i
PAGANYOET REEL 0 AGAR AY ATHLETICS COMPLEX STUCNO PROP TE SAAD CLUB OF BOSTON
OUTDOOR RECREATION@Q@O@®
POO PRLS mle Ft
OPEN SPACE
at dna *
Food trucks. Festival senor Ughting/Security ls af concarn
How much coudd the existing gyre continue Introduction of new thie canopy (not & bet of
te be utilized for Indoor recreation? auhting trees today)
8 MARVEL 145 Hudson St, New York, NY 10013 - 161 Cale San. orge San :uan PROO911_ marveldesigns.com Elm Street Planning Study | April 11 2022
Community Meeting Input Compiled
ELM STREET SITE
What are the most critical priorities for the site?
1, Preserve the Keele - historic value Bnd uthquenese, with cow
pave conten. —— s a
Reaiice wil need
= Fevelopment to make the Mnancing work, Hi
Thespian: esd oe dln cake, Are ne Da tod
-e ek B tuber, the +
) MARVEL 145 Hudson $1. ew York, MY 10013 - 161 Cale San Jorge. San Juan, PR OO911 + marve designs.com Elen Street Planreng Study | Agra 11, 2022
© 20) THE CITY OF NASHUA ‘The Cate (i
Economic Development
To: __L. Wilshire, President
From: T. Cummings, Director
Ce: Members of the Board of Aldermen
Date: June 9, 2022
Re: Communication — Approval & Place on File A Contract for Professional Engineering
Services related to the Nashua Downtown Riverfront Implementation Project with H.L. Turner
Group
The Tax Increment Financing Development Program and Financing Plan adopted by the Board
through the passage of O-18 -006, states that the City Economic Development Director shall be
the Administrator of the District and shall have the power to, inter alia, “negotiate and sign,
upon the approval of the Board of Aldermen, any contracts relative to the design, engineering,
construction, or operations of any phase or component of the activities proposed under this
Plan.”
A copy of the Professional Engineering Services Contract related to the Nashua Downtown
Riverfront Implementation Project with H.L. Turner Group, Inc., along with Exhibits outlining
the scope and basis for fees as previously approved is attached. As shown the contract is the
City’s standard Professional Engineer services contract.
It was decided to break the work up into a phased approach where prior authorization for specific
tasks will be required. The first phase will be putting specific detail on the cantilevered
boardwalks and a Purchase Order will be issued for $350,000.00 to H.L. Turner for their design
services. It is anticipated that as work is completed additional authorization would occur. The
total contract is for $404,340.00 and the source of funds is the TIF account created to implement
the downtown riverfront project.