Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 20441 - 20450 of 38765

Finance Committee - Agenda - 11/15/2018 - P53

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

To:

From:

Re:

EB. Metien:

Discussion:

City of Nashua, Public Works Divisicn

Board of Public Works Meeting Date: October 25, 2018

Stephen Dookran, P.E., City Engineer
Engineering Department

2018 Federal Paving Program — Amherst St. (Rt. 101A), Somerset Parkway, Broad St. (Rt.
130) and Kinsley St (Rt. 111)

To approve the Change Order No. | to the paving contract for the 2018 Federal Paving
Program to Newport Construction Corp. of Nashua, NH in the amount of $611,545.18.
Funding will be through: Department: 160 Admin/Engineering; Funds: Grant and Bond;
Activity: NHDOT Nashua Roadway Improvements and Paving.

The 2018 Federal Paving contract in the amount of $3,987,518.90 was awarded to
Newport Construction of Nashua in September 2018 to pave Somerset parkway and
portions of Amherst St, Broad St and Kinsley St. Work is underway on Somerset
Parkway and Amherst St.

A recent projection of the amount of work remaining in the contract revealed that the total
quantities for the bid items were missing all the quantities for Somerset Parkway. This
computational error occurred during the time we were going back and forth with the
NHBOT on whether the project was to be bid as individual contracts for each street or as
one large contact.

In the end, Federal Highway (FHWA) would approve only the one large contract and in
re-compiling the quantities, the items for Somerset Parkway were inadvertently excluded.
The bid we received and contracted on was much lower than expected because of the
oversight. Without the error, the original contract would have included the quantities for
Somerset Parkway at the correct contract price.

Newport has agreed to hold their bid unit prices for the additional quantities which amount
to a total change order of $611,547.75. If this additional work is included for the other
bidders, Newport is still the lowest bidder and the new contract amount will be
$4,599,066.65. Since FHWA is funding $4.445 mil, the remaining $149,066.65 will come
from City paving funds.

This change order includes an extension of time in order to complete the entire project and
will be subject to approval by NHDOT and FHWA.

Page Image
Finance Committee - Agenda - 11/15/2018 - P53

Finance Committee - Agenda - 11/15/2018 - P54

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

CHANGE ORDER
No. 01

PROJECT: 2018 Federal Paving Program

OWNER’S CONTRACT NO: IFB0660-071718

EXECUTED CONTRACT DATE: _ September 4, 2018

DATE OF ISSUANCE: October 25, 2018 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.: 143743

CONTRACTOR: Newport Construction Corp.

ENGINEER: DPW Engineering

You are directed to make the following changes in the Contract Documents:

Description: Change Order #1 is for

e An increase in additional items shown in attached CO#3 estimate for Somerset Parkway in the
amount of $611,547.74

Change Order #1 1 of 2
2018 Federal Paving Program

Page Image
Finance Committee - Agenda - 11/15/2018 - P54

Finance Committee - Agenda - 11/15/2018 - P55

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
55
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Summary

CHANGE IN CONTRACT PRICE:

CHANGE IN CONTRACT TIMES:

Original Contract Times

Original Contract Price

$3,987,518.90

Substantial completion: October 5, 2018 (Kinsley St)
Substantial completion: Nov 12, 2018 (Amherst & Somerset)
Substantial completion: June 28, 2019 (Broad St )

Ready for final payment: July 30, 2019

Net changes from previous Change Orders

$0

Net change from previous Change Orders

Substantial completion: Same as above
Ready for final payment: Same as above

Contract Price prior to this Change Order

$3,987,518.90

Contract Times prior to this Change Order

Substantial completion: Same as above
Ready for final payment: Same as above

Net Increase (deerease} of this Change Order

$611,547.75

Net Increase (deerease} of this Change Order

206 calendar days (Kinsley St)

225 calendar days (Amherst & Somerset)
0 calendar days (Broad St )
Ready for final payment: 0 calendar days

Contract Price with all approved Change Orders

Contract Times with all approved Change Orders

$4,599,066.65 Substantial completion: May 1, 2019 (Kinsley St)
Substantial completion: April 24, 2019 (Amherst & Somerset)
Substantial completion: June 28, 2019 (Broad St )
Ready for final payment: July 30, 2019
RECOMMENDED: ACCEPTED: APPROVED:
By: By:
By:
DPW Contractor Mayor Jim Donchess
Engineer Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)
Date: Date: Date:
Change Order #1 2 of 2

2018 Federal Paving Program

Page Image
Finance Committee - Agenda - 11/15/2018 - P55

Finance Committee - Agenda - 8/17/2022 - P52

By dnadmin on Sun, 11/06/2022 - 21:45
Document Date
Fri, 08/12/2022 - 13:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2022 - 00:00
Page Number
52
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

CITY OF NASHUA, NEW HAMPSHIRE

FIDUCIARY FUNDS

STATEMENT OF CHANGES IN FIDUCIARY NET POSITION

FOR FISCAL YEAR ENDED JUNE 30, 2021

Additions

Employer contributions

Plan member contributions

Property taxes collected for County

Fees collected for State of New Hampshire

Other

Investment Income:
Dividend, interest and investment income
Less: management fees

Total Additions

Deductions
Benefit payments to plan members and beneficiaries
Administrative expenses
Pay ment of taxes to County
Payment of fees to State of New Hampshire

Total Deductions
Net Change
Net Position restricted for pensions and other purposes
Beginning of year

End of year

The accompany ing notes are an integral part of these financial statements.

44

Private
Pension Purpose
Trust Trust
Fund Funds
$ 907,292 $ -
907,292 -
- 44,671
11,333,176 1,390,512
(231,838) -
12,917,922 1,435,183
3,179,286 157,746
61,626 43,396
3,240,912 201.142
9,677,010 1,234,041
43,638,120 6,827,234
$ 53,315,130 $ 8.061.275

Custodial
Funds

11,993,150
5,226,836

17,219,986

11,993,150

3,226,836
17.219,986

Page Image
Finance Committee - Agenda - 8/17/2022 - P52

Finance Committee - Agenda - 11/15/2018 - P56

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

soeao'eas’ys §— , OPNd RENOD |wIOL PesiAcy oseistses'e$ — | eau }eUOD (m0)
ee eoud f ;
OL ebr'etss tiv pla seaye'tes | on sepig ebueug oLerielss vay pia
; Olde 4 edlid
S6L16'S80'v$ jonujuog pig eseg pesiacy 02 OLe'bav'es yRNU09 pig esvg
oongo'eZs + oo sets 00 0se"s 00°002'82$ oo 002'92$ 1 aOURMOlYy yeudsy Joy (yO/OD) eaueinssy AyjenDyjonuog Ayjeno S'OLOt
00 coo'aas 998 00$ ooo 00 000'99$ 00'000'1$ 99 va (vo/OD) soueunssy AyjentDyaquog Aen GZ OLOF
on'zsr'sa)$ $ 00 28z'8is o0'ce2'6t BN0LL'SPLS 00021 9r1$ aOUBMOl|'y quawysnipy yeydsy pinbrq ZOLOL
g0°0S9'E$ oso'e oo'oss$ 00 oss 00°00L'ES oobs ooL'e va slomleyy Juawaney Arelodwe | og'zeg
09:005'E5$- 002’ 00 c00'%$ 0o'00r 00 D05‘t1$ 00's$ ooe'z 4s JoquiAg snseidowuey | sanoayaionay Ze'ZeS
SLOLL DS 29" §z'650$ ao eee oo Lsy‘e$ Sees pes‘) ay SUI] pllog aiBulg = BLUE'ZES
4 aG} ‘SBupLeW JUsWaAe, INSEIdOWIEU) BAISYSONOY
oo LeZ'Z$ gers oo'vor'ts 00-¥z9 ooLz8's$ $223 ze eal auly pllog aBulg = ZL e'Zea
. 12} ‘SBUDLBY] USWeAR, INSE|doueY| eAljosyesoNey
00 o9e'Zz$ oos'ec) 00 09f'P$ oo c08'oz ooond’ ez oz'o$ oos'eLt a) aul] = POLO'ZES
A f pllos, alBug ‘sBuney) JUBWSAR, WIE, SAlAJAONOY
0°000'66}$ $ 00000’ pas ao} oo o00'sZts oo 000s 15 L wing dun] Ouyel] Jo SOUBUSTUIEYY él
o0'a00'8z+$ aoep 00'a00'a$ 00 00¢ oo n0'azES o0°0e$, 000'r 3H siabBe\4 zero
00 c00'Z0+$ 1 00:o00'2e$ 00:000'2 oo 000.023 o0'000'02$ ‘ SOUEMO||Y SIZIIO PAWJOJIUA 98L9
o0"000'o2$ 001 00°000°F LS o0-0z 00 000'eg$ 80°002$ og va (win) Z-b-z) ,0Sx.9 Sdoo7 oWyed] [e907 §9°919]
ocoos$ oO) 00'0$, 000 oao0s$ 00's$ 00} a Bulging snouwnig LLg'609)
oo o8e'z1$ yee aa'ase'2s 90 FOL 00 000'C1$ a00z$ 00g al Bulging aur jesay 3609
00'0L0F1$ cor . oo 0ze 1S 00% oo OSz'2Ls o0'se$ ose Ea] Bulging ayweig wybiIens 10609]
00"sa8'09s gz 90'S¥E'9s 004e ooroes'yss on sees zez va Bunseg s1eiq pue dog 2v'S09
00 000 LHS s0z 00°000'1S. oes 90000'or$ 00'00z$ 00z dA seunoniyg Bunys)xq Jo sede S'p09
00 deP‘shS 291 o00s2"23 no'gz 00 0511S o0'oe2$ ran va (HIN 49 gO) Bunseg aoejday 9b r09
oo'szs‘oe$ bE 00S29'y$ OO 4+ 00 0se’szs an'szzg v6 va (HIN JO go) Bugseo Suysixg apes 0} snipy rrog
Oe ez9'Lrs$ ‘900'Sh} 0s e0'Z98$ oo eps'ee DL E15 ‘oars ares e9r'pzl 4S saoeyng snoulwunyg BUUel plod Ly
00°6Sr'oz$ §627'°Z01 op aze'z$ 00: Zea'LE 09 Z80'St$ az'0$ €br'06 Pa] SAISOYpy JUIOP JuaWaAeY g'e0r
00 089'ss$ por ooone'z¢ 00's oo nes Lrs o0Ozts 66 NOL POYJS|| PUBH ‘JWAWaAeg SNOUIWUNIG 10H Z £00
oo zee'o08$ early OO S70'EPES Go'98z'b oo'sEeR'Zg2¢ 00' FBS 9ge'6 NOL (esinog dol) — 6041 E07
: YyBuans YBIY ‘pou euIyeY ‘JUeWeAeg snoulWNMyg 10H
00 zz ErP LS 44002 009}8'822$ oo'BZL's on'eoy'ZLZ'LS 00'22Z$ 6ee‘ot NOL Gepuig) Zor e0r
(Z 4911 YO/OD) ‘poyeW) sUIySeW "UEWeney sNOUIWINIE IOH
00'086'z$ 086'z 00'0$ ooo 00 086'2$ 00'1$ 086'z AS siep|noyg 10 ayeBalbBy peysni9 ef POS
00°Z64'0e$ ves'z 00 oae'zs 00 C8E OO ZIELLS oo'ss val'z AS apesBoy pur uoleaeoxg Aemaalig Ebb €0z
oo'sos'eLs $02 oO'SeB'2¢ 90 68S og'09s’st$ on's$ Ze AS epesBey pue uoneAgoxg peoy ZbL'E0z
old AyuenD oud Ayuend ood Souq uA Aygueny wun uondusseg Wey “ON Wd}|
(seoug Wu pig aseg asn) (se0Ug WU pig sseg esn)} . pig eseg prquog
Pilg eseg pesiaey } Of Jepig sBueyD 09 UdHoNAsUuCD LOdMeN, pig eseg

8-2120-09904J] ‘enysen

6POLP# ENUSEN VON J98/O1d YAAHA/LOGHN

8102 ‘ZL 49q0}90

sannuend pig eseg - | “ON 48pio eBueyD

Page Image
Finance Committee - Agenda - 11/15/2018 - P56

Finance Committee - Agenda - 11/15/2018 - P57

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
57
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

©) THE CITY OF NASHUA “The Cate City”

Financial Services

Purchasing Department

November 1, 2018
Memo #19-088

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2018 SEWER REPLACEMENT — KINSLEY ST CHANGE ORDER #1 (VALUE: $27,000)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated October 25,
2018 for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works (October 25, 2018 meeting) and the Purchasing Department
recommend the award of this Change Order #1 in an amount of $27,000 to Newport Construction Corp.
of Nashua, NH.

Respectfully,
va 7
bis E—————.
oken

Purchasing Manager

Ce: S Dookran L Fauteux

‘229 Main Street ¢ Nashua, New Hampshire 03061 © Phone (603) 589-3330 « Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 11/15/2018 - P57

Finance Committee - Agenda - 11/15/2018 - P58

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

City of Nashua, Public Works Division
To: Board of Public Works Meeting Date: October 25, 2018

From: Stephen Dookran, P.E., City Engineer
Engineering Department

Re: 2018 Sewer Replacement — Kinsley St
Change Order i

&. Motion: To approve Change Order No. | to the construction contract for the 2018 Sewer
Replacement — Kinsley St project to Newport Construction of Nashua, NH in an amount
not to exceed $27,000. Funding will be through: Department: 169 Wastewater; Fund:
Wastewater; Activity: Sewer Rehab.

Discussion: The base contract was for sewer improvements on Kinsley St in advance of street
paving later this year included of about 480 feet sewer replacemeni as well as associated
catch basins. This original contract value is $1,139,300.

This change order has two parts:

e 1) Construction of manholes. During the execution of the sewer CIPP lining
contract by Layne Inliners in a separate contract, it was discovered that
additional manholes are needed in order to perform some of the lining. This
Change Order includes the construction of four manholes for $22,000.

e 2) Removal of pipe. An unrecorded sewer main on Kinsley St from Elm St to
Walnut St has been located. Removing this pipe is essential since it may
deteriorate and cause sinkholes. The cost to remove the pipe is $5,000.

The total value of the change order is $27,000. This will bring the toial contract value
to $1,166,300.

Page Image
Finance Committee - Agenda - 11/15/2018 - P58

Finance Committee - Agenda - 11/15/2018 - P59

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

CHANGE ORDER
No. 01

PROJECT: 2018 Sewer Replacement — Kinsley Street

OWNER’S CONTRACT NO: IFB0779-052218

EXECUTED CONTRACT DATE: _ June 20, 2018

DATE OF ISSUANCE: October 25, 2018 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.: 141778

CONTRACTOR: Newport Construction Corp.

ENGINEER: DPW Engineering

You are directed to make the following changes in the Contract Documents:

Description: Change Order #1 is for

e An increase for the construction of four (4) manholes amount of $22,000

e Removal of sewer main on Kinsley Street from Elm Street to Walnut Street in the amount of $5,000

Change Order #1 1 of 2
2018 Sewer Rehab
Kinsley Street

Page Image
Finance Committee - Agenda - 11/15/2018 - P59

Finance Committee - Agenda - 11/15/2018 - P60

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Summary

CHANGE IN CONTRACT PRICE:
Original Contract Price

$1,139,300

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion: September 3, 2018
Ready for final payment: October 1, 2018

Net changes from previous Change Orders

30

Net change from previous Change Orders

Substantial completion: Same as above
Ready for final payment: Same as above

Contract Price prior to this Change Order

$1,139,300

Contract Times prior to this Change Order

Substantial completion: Same as above
Ready for final payment: Same as above

Net Increase (deerease} of this Change Order

$27,000

Net Increase (deerease} of this Change Order

Substantial completion: 102 calendar days
Ready for final payment: 225 calendar days

Contract Price with all approved Change Orders

Contract Times with all approved Change Orders

$1,166,300 Substantial completion: December 15, 2018
Ready for final payment: January 30, 2019
RECOMMENDED: ACCEPTED: APPROVED:
By By:
By:
DPW Contractor Mayor Jim Donchess
Engineer Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)
Date: Date: Date:
Change Order #1 2 of 2

2018 Sewer Rehab
Kinsley Street

Page Image
Finance Committee - Agenda - 11/15/2018 - P60

Finance Committee - Agenda - 11/15/2018 - P61

By dnadmin on Mon, 11/07/2022 - 11:25
Document Date
Fri, 11/02/2018 - 13:25
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Thu, 11/15/2018 - 00:00
Page Number
61
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

City of Nashua, New Hampshire
Division of Public Works
2018 Sewer Replacement - Kinsley Street
IFB0779-052218

CHANGE ORDER #1

Item
No. Quantity Units Item Description Unit Price Total Price
if 22 VF Replace Existing MH with 4' Diam. Sewer Manhole $1,000.00 $22,000.00
Remove Unknown Pipe from Kinsley Street between
2r(1)o Allowance Elm Street and Walnut Street $5,000.00 $5,000.00

TOTAL CHANGE ORDER 1

$27,000.00

Page Image
Finance Committee - Agenda - 11/15/2018 - P61

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2041
  • Page 2042
  • Page 2043
  • Page 2044
  • Current page 2045
  • Page 2046
  • Page 2047
  • Page 2048
  • Page 2049
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact