Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 18661 - 18670 of 38765

Finance Committee - Agenda - 10/2/2019 - P93

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
93
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

MAIN OFFICE
397 Whittier Highway

Electrical
Installations, Inc.

603-253-4525
FAX 603-253-6284

Engingering :Canstructlan«Contral Systems
cctmmmisaa evlenbers, NO

Moultonboro, NH 03254

VT License EM-2667 ME License 7905 NH Li

BRANCH OFFICE

930B American Legion Hwy
Westport, MA 02790
508-636-8600

FAX 568-636-8650

cense 46C MALicense 221MR

Potential 004

1929 — Nashua, NH - WWTF Engergy Recovery

Subject: 10 LED 4° Vapor tight lights in generator

Upgrade room. Option 1
To Eric Delisle Contract No: 181012-5-001
Methuen Construction Number: 1929-CO-004
144 Main St Revision Number: 0
PO Box 980 Date: 7/22/2019
i Price / Do Not
Plaistow, NH 03865 Work Type: rice / Do No
603-328-2222 Proceed
Days Valid: 5
Return To Chuck Fritz

Electrical Installations, Inc.
245 Charlotte Street
Manchester, NH 03103
603-520-0513

935-7862 (FAX)

chuck. fritz@eii-hq.com

Comments / Time Extension Request
This is for the replacement of light to go in the same location. No new conduit or wire.

Details
00—Electrical Field a 8.00

001 . Electrician Labor $95.00 2.00 | $1,520.00
Labor Onsite Ars
2—Instrumentation | Engineer 0.00

002 Lab 110.00 . .
Field Labor Onsite | Programmer apor ° Hrs 0.00 90.00

0.00

003 5—Panel Shop Panel Shop Labor $65.00 Urs 0.00 50.00
4—Submittals/O&M's 1.00

004 Clerical Lab 55.00 : :
/Clerical/Office erica aper ° Hrs 1.00) $55.00

P/N: 4VT2-LD5-4-
005 *EP*-Entire Project N Material $150.00 10.60 - | $1,500.00

Page Image
Finance Committee - Agenda - 10/2/2019 - P93

Finance Committee - Agenda - 10/2/2019 - P94

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
94
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

DR-UNV-

L835-CD1-WL-U

Light Fixtures

006 *EP*-Entire Project | Conduit Parts Material $175.00 1.00 -— $175.00
Breakout
Labor : $1,575.06
Gross Margin Percent @ 15%: $236.25
Material : $1,675.00
Gross Margin Percent @ 15%: $251.25

Total: $3,737.50

Reservation of Rights

This price does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the
sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for
any of these items.

Signed By: Dated: 7/22/2019

Page Image
Finance Committee - Agenda - 10/2/2019 - P94

Finance Committee - Agenda - 10/2/2019 - P95

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
95
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Doc #: 6
Ref. Document:

PROJECT NAME: Date: 4-Sep-19
Nashua Energy Recovery Upgrade

PROJECT NO: 181012
PHASE
COST SUMMARY SHEET
Mechanical Room Painting

A McC Labor (Recap Sheet): $4,282.10
B Mc Materials, & Equipment (Recap Sheet): $453.00
Cc MCG Fee (A x 15%) + (B x 10%): $687.62
D Subtotal MC Work (A+B+C): | $ 5,422.72
E Total Subcontractors (Below): $10,875.00
F McC Mark-up on Subcontractor Work (5%): | $ 543.75
G Bond (1%) and General Liability (1%): $336.83

Total Proposal (D+E+F+G): $ 17,178.30

SUBCONTRACTOR SUMMARY
Subcontractor Description
Arthur Cole painting Pressure Wash and paint the mechanical room

Amount
10,875.00

10,875.00

$
$
$
$
3
3
3
$

Total Subcontractors:

Page Image
Finance Committee - Agenda - 10/2/2019 - P95

Finance Committee - Agenda - 10/2/2019 - P96

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
96
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Mechanical Room Painting

Scope: The below orice is the cost incurred to paint Mechanical room, including power washing ceilings, walls, floor anc filling unused holes with mortar.

1-LABOR

CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL

NT

FOREMAN

UCK
SUBTOTAL $3,195,606
2-MATERIALS
DESCRIPTION QTy UNIT UNIT COST SUBTOTAL
Estimated
Consumables 5 500.00 $ 500.00 $ -
Dumpster / Disposal 5 750.00 $ 750.00 $ -
Mortar 4 5 41.25 § 45.00
i i i i
SUBTOTAL 3 45.00
3-EQUIPMENT
CATEGORY HRS RATE UNIT SUBTOTAL
VATOR PG300 $180.35 HR $0.00

VATOR CAT 330 $100.37
320 $58.71 $0.00
$61.23 $0.00
$17.00 3408.00
40
50.

SAW
RAULIC BREAKER 41

T 420 :
KLIFT LULL $30.01
185CFM $15.08
LIFT 79° $4.18
DRILL $120.06

SUBTOTAL $468.00

Page 2 of 3 9/10/2019 - 8:09 AM

Page Image
Finance Committee - Agenda - 10/2/2019 - P96

Finance Committee - Agenda - 10/2/2019 - P97

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
97
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

Mechanical Room Painting

Scope; The below price is the cost incurred to paint Mechanical room, including power washing ceilings, walls, flaor and filing unused holes with mortar.

4-SUPPLEMENTAL COSTS
DESCRIPTION ary RATE UNIT SUBTOTAL
IASBUILT DRAWINGS
AR
SUBTOTAL $0.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $1,086.50
6-GG WORK TOTAL
SUBTOTAL (Item 4#2+3+4) $4,735.10
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST ary cost TOTAL
Cole
SUBTOTAL $10,875.00
3-FEE
GC (15% X lems 185 + 10% X items 28384 + 5% X item 7) $1,231.37
3-SUBTOTAL $16,841.47
BOND (1% X Hema} $168.41
GENERAL LIABILITY (1% X item 8) $168.41
9-TOTAL (Item 8 + Bond + General Liability) $17,178.30

Page 30f 3

9/10/2015 + 8:09 AM

Page Image
Finance Committee - Agenda - 10/2/2019 - P97

Finance Committee - Agenda - 10/2/2019 - P98

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
98
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

ARTHUR COLE PAINTING CORPORATION

Contract Painting

www.colepainting.com se vallcoverines
Millwork Finishing
Maintenance Programs
September 10, 2019
To: . Methuen Construction Coo 0
Attn: “> Don Hutchinson eae
oe - Superintendent |. .¢2 8. oo
Job: 0S _- Water Treatment facility areneten
oe ~ Mechanical Room 9:
- 2Sawmill Rd.
© Nashua, NH oo
Documents: On site estimate .
Scope
interior: ® Power wash Concrete Ceilings & CMU walls
Walls ° Paint Ceilings with 1 Coat primer and 2 Coats finish paint.
Ceilings © Paint Walls with 2 Coats Pro Industrial Acrylic Coating.
Floor e Concrete Floor and Pads to be thoroughly cleaned using Spiral
tip High pressure wash and detergent.
e Concrete Floor and pads to receive 2 Coats of Armorseal 1000
HS industrial Catalized Epoxy. Top Coat to be applied after
machinery has been installed.
® All Riser area @ pads shall be striped with Safety yellow paint
Note Please see the attached Product data Sheets recommended.
Total Labor | $7,865.00
Total Material | $3,010.00
Bob Cote
Estimator

Arthur Cole Painting Corporation

P.O. Box 16583 « Worcester, MA 01601 ° Phone: 508.799.9019 © Fax: 508.797.4049

Page Image
Finance Committee - Agenda - 10/2/2019 - P98

Finance Committee - Agenda - 10/2/2019 - P99

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
99
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

, THE CITY OF NASHUA “the Gate City

Administrative Services

Purchasing Department

September 26, 2019
Memo #20-038

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: CONTRACT FOR GAS TANK DIAPHRAGM UPGRADE (VALUE $311,507)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communications from David Boucher, Superintendent Wastewater Department

dated September 26, 2019 for the information related to this change order.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,

except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The Superintendent Wastewater Depariment, Board of Public Works (September 26,2019 BPW meeting)
and Purchasing recommend the award of this contract in the amount of $311,507 to Methuen
Construction Company of Plaistow, NH.

Respectfully

th: Ce

an Kdoken
Purchasing Manager

Cc: D Boucher i Fautuex

229 Main Street « Nashua, New Hampshire 03061 * Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 10/2/2019 - P99

Finance Committee - Agenda - 10/2/2019 - P100

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
100
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

To:

From:

Re:

B. Motion:

Discussion:

City of Nashua, Public Works Division
Board of Public Works Meeting Date: September 26, 2019

David L. Boucher, Superintendent
Wastewater Department

Gas Tank Diaphragm Upgrade

To approve the contract for the digester gas holding tank upgrade project with Methuen
Construction Company of Plaistow, NH in an amount not to exceed $311,507. Funding
will be through: Department: 169- Wastewater; Fund: Wastewater; Activity: Digester
Gas Holding Tank Upgrade Project.

Digester gas from anaerobic digester is stored in 35-foot high, 25-foot diameter gas tank.
The anaerobic digester, gas tank and related facilities were constructed in 2000. The gas
tank has had no upgrades since being installed. The gas tank is an entire steel structure
with an inner flexible diaphragm where the gas is stored. The internal diaphragm had
failed with a visible split in a seam. Due to age of diaphragm and other upgrades needed,
anew project for replacing the diaphragm is needed.

In addition to replacing the diaphragm, the upper attachment ring will be reworked such
that the diaphragm can be detached from the air side of the tank. Currently the piston has
to be raised to detach the diaphragm from the gas side of the tank making that task
difficult. The wire cables that attach the piston to external counter weight plates are
rusted and will be replaced.

The project was out to bid on August 15, 2019 with a bid opening on September 6, 2019,
Two bids were received:

NEESCO - $399,750
Methuen Construction - $311,507

Methuen Construction has done several major projects at the NWTF including the Wet
Weather Facility, Primary Tanks Upgrade and the Energy Recovery Upgrade projects.

Their projects were done satisfactorily and have the manpower and experience for this

project.

Page Image
Finance Committee - Agenda - 10/2/2019 - P100

Finance Committee - Agenda - 10/2/2019 - P101

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
101
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

BID FORM

Attach additional supporting documents as appropriate

Bidder: Methuen Construction Company, Inc.

Address: 144 Main Street, PO Box 980, Plaistow, NH 03865

Phone: 803-328-2222 E-mail. 2stimating@methuenconstruction.com

Provide written and numeric values for each item. The bidder agrees to perform the specified
work for the following prices:

1. The bidder agrees to perform all the of the work to install a new tank diaphragm
according to the project scope/specifications/measurement and payment section
as described above for the sum of:

($_ 225,757 )

Two Hundred Twenty-Five Thousand, Seven Hundred Fifty-Seven Dollars

2. The bidder agrees to purchase a new tank diaphragm according to the project
scope/specifications/measurement and payment sections as described above for
the sum of:

S 55,750 )

Fifty-Five Thousand, Seven Hundred Fifty Dollars

3. Coating Allowance - the bidder agrees to provide metal coatings according to
the project scope/specifications/measurement and payment sections a described
above for an allowance of:

Thirty Thousand ($_ 30,000 )

¢ Supplemental Information: Provide a list of recently completed projects related to
digester or biogas related projects for gas tank upgrades or new installation. Include

Page Image
Finance Committee - Agenda - 10/2/2019 - P101

Finance Committee - Agenda - 10/2/2019 - P102

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
102
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

project name, costs, dates, and contact information of owner. Contractor must have
prior experience similar to this project or provide experience that clearly
demonstrated qualifications for such work.

See attached.

Signature: Ny od Ae )
Wayné Sypfongis, crete oe Fe President

Page Image
Finance Committee - Agenda - 10/2/2019 - P102

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1863
  • Page 1864
  • Page 1865
  • Page 1866
  • Current page 1867
  • Page 1868
  • Page 1869
  • Page 1870
  • Page 1871
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact