Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 17931 - 17940 of 38765

Finance Committee - Minutes - 11/15/2017 - P1

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

REPORT OF THE FINANCE COMMITTEE

NOVEMBER 15, 2017

A meeting of the Finance Committee was held on Wednesday, November 15, 2017, at 7:00 p.m. in
the Aldermanic Chamber.

Mayor Jim Donchess, Chairman, presided.

Members of the Committee present: Alderman-at-Large Mark S. Cookson, Arrived at 7:20 p.m.
Alderman-at-Large Lori Wilshire
Alderman-at-Large Michael B. O’Brien
Alderman Benjamin M. Clemons
Alderman June M. Caron

Members not in Attendance: Alderman Ken Siegel

PUBLIC COMMENT
Barney Barbera — 5 Birch Ridge Trail

The current personnel assigned to the Senior Activity Center have been an asset to our organization.
Their insight and diligence cannot be easily replaced. By deleting this, we can continue with our
efforts to bring our services to the many seniors of the city. This will still give the city officials the
flexibility to make appointments as needed.

COMMUNICATIONS

From: Dan Kooken, Purchasing Manager
Re: NPD Extra Duty Solutions (Value: $0.00)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AWARD THE
CONTRACT TO HART HALSEY, LLC, DBA EXTRA DUTY SOLUTIONS AT NO COST TO THE
CITY

MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Purchase of Nashua Police Department Bulletproof Vests (Value: $37,995)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AUTHORIZE THE
PURCHASE FROM ATLANTIC TACTICAL IN THE AMOUNT OF $37,995. FUNDS ARE AVAILABLE
IN DEPARTMENT 150, POLICE; 50% FROM 2016 AND 2017 BULLETPROOF VEST PARTNERSHIP
GRANT

AND 50% FROM NPB PROTECTIVE CLOTHING

Alderman O’Brien
Coming from the fire background, we have to wear the personal protective clothing. | think this is

highly safe. | want to protect our officers in their duty. Are they mandatory? Do they have to be worn
whenever the officer is on patrol?

Page Image
Finance Committee - Minutes - 11/15/2017 - P1

Finance Committee - Minutes - 11/15/2017 - P2

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

Finance Committee - 11/15/2017 Page 2

Deputy Chief Kerrigan

Yes, they do.

Alderman O’Brien

That’s outstanding. | think that answers to the person’s safety.
MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Purchase of Rope Equipment Replacement (Value: $46,222)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AUTHORIZE THE PURCHASE
FROM COASTAL FIRE SYSTEMS IN THE AMOUNT OF $46,222. SOURCE OF FUNDING IS DEPARTMENT
152, FIRE; DEPARTMENT OF HOMELAND SECURITY ASSISTANCE TO FIREFIGHTERS GRANT

MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Purchase of Rope Replacement Hands on Training (Value: $39,600)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AUTHORIZE THE PURCHASE
FROM C & C FIRE TRAINING CONSULTANTS IN THE AMOUNT OF $39,600. SOURCE

OF FUNDING IS DEPARTMENT 152, FIRE; DEPARTMENT OF HOMELAND SECURITY ASSISTANCE TO
FIREFIGHTERS GRANT

MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Quadrant Funds Contribution for Construction of Sidewalk on Northeastern Blvd
(Value: Not-To Exceed $40,000)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AWARD THE CONTRACT TO
WHITE FAMILY VENTURES, LLC, FOR AN AMOUNT NOT-TO-EXCEED $40,000. FUNDS ARE
AVAILABLE IN DEPARTMENT 160, ADMINISTRATION/ENGINEERING; TRUST FUND

MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Purchase Winter Road Sand (Value: $16,000)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AUTHORIZE THE PURCHASE
FROM GRANITE STATE CONCRETE IN THE AMOUNT OF $16,000. SOURCE OF FUNDING IS
DEPARTMENT 161, STREETS; GENERAL FUND

MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Headworks Upgrade Project — Change Order #7 (Value: $62,673)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND APPROVE CHANGE ORDER #7
TO THE CONTRACT WITH T-BUCK CONSTRUCTION IN THE AMOUNT OF $62,673. FUNDS ARE
AVAILABLE IN DEPARTMENT 169, WASTEWATER; STATE REVOLVING LOAN FUND

MOTION CARRIED

Page Image
Finance Committee - Minutes - 11/15/2017 - P2

Finance Committee - Minutes - 11/15/2017 - P3

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

Finance Committee - 11/15/2017 Page 3

From: Dan Kooken, Purchasing Manager
Re: SCADA Upgrades Project - Construction (Value: $591,280)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AWARD THE CONTRACT TO
ELECTRICAL INSTALLATIONS, INC., IN THE AMOUNT OF $591,280. SOURCE
OF FUNDING IS DEPARTMENT 169, WASTEWATER; WERF

Alderman Caron

Is this going to take place right away? The bid went out in August and here we are in November. Is there
going to be a delay in having that worked out?

Alderman Clemons

| believe the plan is as soon as the contracts get signed the work will get underway.

Mayor Donchess

And this was approved by Public Works.
MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Digester Cleaning Project — Co-1 (Value: $48,400)

MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND APPROVE CHANGE ORDER #1
TO THE CONTRACT WITH DENALI WATER SOLUTIONS IN THE AMOUNT OF $48,400. FUNDS ARE
AVAILABLE IN DEPARTMENT 169, WASTEWATER

MOTION CARRIED

From: Mayor Jim Donchess
Re: Park and Ride, 25 Crown Street

MOTION BY ALDERMAN CLEMONS TO ACCEPT AND PLACE ON FILE
MOTION CARRIED

MOTION BY ALDERMAN CLEMONS THAT THE RULES BE SO FAR SUSPENDED AS

TO ALLOW FOR THE INTRODUCTION OF TWO COMMUNICATIONS RECEIVED AFTER THE AGENDA
WAS PREPARED

MOTION CARRIED

From: Jill Stansfield, Parking Operations Foreman
Re: Parking Department’s Snow Event Responsibilities & Parking Garage Roof Deck Management

MOTION BY ALDERMAN CLEMONS TO ACCEPT AND PLACE ON FILE
Alderman Clemons

The motion is to accept and place on file. But my question on this is, did we get a price of what that would be to
add that? | didn’t see that in the email that we received.

Mayor Donchess

Just that we know that we can add to it. But no, they haven't specifically had it quoted.

Page Image
Finance Committee - Minutes - 11/15/2017 - P3

Finance Committee - Minutes - 11/15/2017 - P4

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

Finance Committee - 11/15/2017 Page 4
Alderman Clemons

Did we pass that? Or did we table it?

Mayor Donchess

We passed the contract but you wanted a report. They’re going to include it in the contract is the bottom line.
The Motion was to accept and place on file.

Alderman Clemons

| guess my follow-up question is — because the communication was sort of ambiguous about whether or not we
would be adding that to the contract. Can we expect to see a change order, | guess? | guess that’s what it
would be, right?

Mayor Donchess

l’ll have to follow-up on that. It sound to me like they were going to try to deal with it, and if they couldn’t do it
appropriately then they'd add it on to the contract. But! don’t think there was any intent to add on to it right
now.

Alderman Clemons

Only because — | understand what was said in the memo, which was that during a snow event they allow the
businesses that pay for the uncovered portion to go down below. But | can tell you for a fact that it’s a problem.
And the fact that it’s not kept up with right after the storm, or plowed the next day early in the morning, is really
a problem for people who work downtown. It fills up with residents, and that’s fine, and we should do that. But
if we had the top plowed, as a priority, | think it would just add more room for the people that come to work
every day. | would hope that we would see a change in that contract.

Mayor Donchess

We're going to see a change. Whether we need to do a change order, I’m not sure. But we will make sure that
there’s an improvement in that area.

MOTION CARRIED

From: Tim Cummings, Director of Economic Development
Re: R-17-139 — Request Amendment

MOTION BY ALDERMAN CLEMONS TO ACCEPT AND PLACE ON FILE
MOTION CARRIED

UNFINISHED BUSINESS — None
NEW BUSINESS — RESOLUTIONS

R-17-143
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
Alderman Tom Lopez
Alderman Richard A. Dowd
APPROVING AN AMENDMENT TO THE LEASE AGREEMENT WITH THE NASHUA ASSOCIATION
FOR THE ELDERLY

Page Image
Finance Committee - Minutes - 11/15/2017 - P4

Finance Committee - Agenda - 4/6/2022 - P193

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
193
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

protection or disposition of such property. CONTRACTOR shall furnish the ENGINEER with copies of such notifications
and with copies of any agreements between the CONTRACTOR and the property OWNER’s concerning such protection
or disposition.

E. CONTRACTOR shall take all necessary precautions for the protection of corporate or private property, such as walls
and foundations of buildings, vaults, underground structures of public utilities, underground drainage facilities,
overhead structures of public utilities, trees, shrubbery, crops, and fences contiguous to the Work, of which the
Contract does not provide for removal. CONTRACTOR shall protect and carefully preserve all official survey
monuments, property marks, section markers, and Geological Survey Monuments, or other similar monuments, until
OWNER, or authorized Surveyor or agent has witnessed or otherwise referenced their location or relocation.
CONTRACTOR shall notify the ENGINEER of the presence of any such survey or property monuments as soon as they
are discovered.

F. CONTRACTOR shall be responsible for the damage or destruction of property of any character resulting from
neglect, misconduct, or omission in its manner or method of execution or the non-execution of the work, or caused by
defective work or the use of unsatisfactory materials, and such responsibility shall not be released until the work shall
have been completed and accepted and the requirements of the Construction Specifications complied with.

G. Whenever public or private property is so damaged or destroyed, the CONTRACTOR shall at its own expense,
restore such property to a condition equal to that existing before such damage or injury was done by repairing,
rebuilding, or replacing it as may be directed, or the CONTRACTOR shall otherwise make good such damage or
destruction in an acceptable manner. If the CONTRACTOR fails to do so, the ENGINEER may, after giving the
CONTRACTOR notice in writing, proceed to repair, rebuild, or otherwise restore such property as may be deemed
necessary, and the cost thereof shall be deducted from any compensation due, or which may become due, the
CONTRACTOR under its Contract.

4.02 Subsurface and Physical Conditions
A.Reports and Drawings:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has
used in preparing the Contract Documents; and

2. Those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous
to the Site (except Underground Facilities) that ENGINEER has used in preparing the Contract Documents.

B. Limited Reliance by CONTRACTOR on Technical Data Authorized:

CONTRACTOR may rely upon the general accuracy of the “technical data” contained in such reports and drawings, but
such reports and drawings are not Contract Documents. Such “technical data” is identified in the Supplementary
Conditions. Except for such reliance on such “technical data,” CONTRACTOR may not rely upon or make any Claim
against OWNER, ENGINEER, or any of ENGINEER’s Consultants with respect to:

1. The completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any
aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by
CONTRACTOR, and safety precautions and programs incident thereto; or

2. Other data, interpretations, opinions, and information contained in such reports or shown or indicated in such
drawings; or

3. Any CONTRACTOR interpretation of or conclusion drawn from any “technical data” or any such other data,
interpretations, opinions, or information.

GC-120f55

Page Image
Finance Committee - Agenda - 4/6/2022 - P193

Finance Committee - Minutes - 11/15/2017 - P5

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

Finance Committee - 11/15/2017 Page 5

MOTION BY ALDERMAN CLEMONS TO RECOMMEND FINAL PASSAGE OF R-17-143

ON THE QUESTION

Mayor Donchess

This is the resolution Mr. Barbera was addressing. We currently have David Fredette, City Treasurer, as our
representative on the Board, as well as Alderman Caron. Alderman Caron can probably explain it better than I.
But the lease agreement provides that someone cannot serve more than two consecutive terms. We would like
to leave Mr. Fredette at two terms. We would like to leave him on the Board. And therefore, we’d like amend
the lease to enable someone who has experience to stay with that organization.

Alderman Caron

| think when the lease agreement was put together, | don’t think the Mayor had a four-year term. If you have
someone that the Mayor’s office puts in place, they should be able to at least be there throughout that term.
And if the Mayor wants them — it doesn’t affect anything. And if you look at it, not everybody being on the

Senior Center Board, for some people it isn’t important, but for others it is. | think that’s what Mr. Barbera was
trying to implement — that if you get good people on the board, you want to keep them there.

Mayor Donchess

| don’t really see the reason why a limitation would really be there. It’s three consecutive two-year terms. But
we’d like to delete that so Mr. Fredette can continue to serve.

Alderman Clemons

| agree. | don’t think the term limits on boards like this make any sense at all. If you get good people in a
position, you need to keep them there. | agree with this 100 percent.

MOTION CARRIED
NEW BUSINESS — ORDINANCES — None
TABLED IN COMMITTEE
Communications
MOTION BY ALDERMAN CLEMONS TO TAKE FROM THE TABLE THE COMMUNICATION REGARDING
THE PURCHASE OF 2 REPLACEMENT TRADE VEHICLES AND PORTABLE COMPRESSOR
MOTION CARRIED
From: Dan Kooken, Purchasing Manager
Re: Purchase of Two Replacement Trades Vehicles and Portable Compressor (Value: $114,394)
e Tabled — 10/18/2017
MOTION BY ALDERMAN CLEMONS TO ACCEPT, PLACE ON FILE AND AUTHORIZE
THE PURCHASE FROM GRAPPONE AUTOMOTIVE GROUP IN THE AMOUNT OF $114,394. FUNDS
ARE AVAILABLE IN DEPARTMENT 191, SCHOOL; CERF

Alderman Caron

| think this was tabled. | was trying to look at my notes. Just to verify the year of the trade-in vehicles.

Page Image
Finance Committee - Minutes - 11/15/2017 - P5

Finance Committee - Minutes - 11/15/2017 - P6

By dnadmin on Mon, 11/07/2022 - 10:18
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
6
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__111520…

Finance Committee - 11/15/2017 Page 6
Alderman Clemons

We didn’t have a trade-in value assigned on the original paperwork. It was submitted, and now we do.
MOTION CARRIED

Resolutions

MOTION BY ALDERMAN CLEMONS TO TAKE FROM THE TABLE R-17-139
MOTION CARRIED

Mayor Donchess
For the record, we should note that Alderman Cookson has joined the meeting.
R-17-139
Endorser: Mayor Jim Donchess
AUTHORIZING THE CITY OF NASHUA TO ENTER INTO A LEASE AGREEMENT WITH ABSOLUTE

BROADCASTING, LLC FOR A PORTION OF 1 PINE STREET EXTENSION
e = Tabled — 10/18/2017

MOTION BY ALDERMAN CLEMONS TO AMEND R-17-139 BY REPLACING IT WITH THE PROPOSED
AMENDMENT PLACED ON OUR DESKS THIS EVENING

Mayor Donchess

And attached to the Cummings memorandum.
Alderman Cookson

Difference in language?

Mayor Donchess

The difference is that the lease, as drafted, asked for a rent of $250.00 a month, and this is for the antenna for
WSMN, which is now housed in the Nimco building. Mr. Cummings has recommended that this is a downtown
business that is in transition; there is a change in ownership. They’re switching locations from their current
location on Main Street to a very visible corner location at E. Pearl and Main in the Masonic building. He’s
recommending that we grant them the lease for $1.00 as opposed to $250.00 a month. That’s the substance
of the agreement.

Alderman Cookson

Is the lease agreement with the new ownership?

Mayor Donchess

Yes.

Alderman Cookson

So they’re still being called Absolute Broadcasting, LLC?

Page Image
Finance Committee - Minutes - 11/15/2017 - P6

Finance Committee - Agenda - 1/6/2016 - P40

By dnadmin on Mon, 11/07/2022 - 09:56
Document Date
Wed, 01/06/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/06/2016 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010620…

INTERNATIGNAL’ September 25, 2615

Prepared For: Presented By:
CITY OF NASHUA LIBERTY INT'L TRKS OF NH
John Stewart James C Ramsay
PO Box 2019 1400 S. WILLOW STREET
Nashua, NH 03061- 19 MANCHESTER NH 03103 -
(603)584 - 3565 (603)623-8873

Model Profitie
2016 7606 SBA 6X4 2010 (SFG67)

MISSION: Requested GVWR: 66000. Calc. GVWR: 66000

DIMENSION: Wheelbase: 256.00, CA: 188.90, Axle to Frame: 79.00

ENGINE, DIESEL: {Navistar N13} EPA 2010, SCR, 430 HP @ 1700 RPM, 4550 Ib-ft Torque @
1000 RPM, 2100 RPM Governed Speed, 430 Peak HP (Max)

TRANSMISSION, {Allison 4500_RDS_P} 5th Generation Controls; Wide Ratio, 6-Speed, With

AUTOMATIC: Double Overdrive; On/Off Hwy; Includes Oil Level Sensor, With PTO Provision,
Less Retarder

CLUTCH: Omit ltem (Clutch & Control)

AXLE, FRONT NO? JRIVING: {Meritor MFS-20-133A} Wide Track, |-Beam Type, 20,000-Ib Capacity
AXLE, REAR, TAN iB: {Meritor RT-46-160} Single Reduction 46,000-1b Capacity, 200 Wheel Ends
Gear Ratio: 4.89

CAB: Conventional

TIRE, FRONT: (2) 315/80R22.5 HSU2 WT (CONTINENTAL) 481 rev/mile, load range L, 20 ply

TIRE, REAR: (9) 11R22.5 HDR2 (CONTINENTAL) 491 rev/mile, load range H, 16 ply

SUSPENSION, RE: 3, {Hendrickson HMX-460-54} Walking Beam Type 54" Axle Spacing; 46,000-Ib

TANDEM: Capacity, With Rubber End Bushings, Transverse Torque Rods, Less Shock
Absorbers

FRAME REINFORC MENT: Outer "C" Channel, Heai Treated Alloy Steel (120,000 PS! Yield); 10.813" x
3.892" x 0.312"; (274.6mm x 98,9mm x 8.0mm); 480.0" (12182mm) Maximunt
OAL
PAINT: Cab schematic 100GS
Location 1: 5047, Green (Prem)
Chassis schematic N/A

2 Proposal: 17583-04

Page Image
Finance Committee - Agenda - 1/6/2016 - P40

Finance Committee - Agenda - 1/6/2016 - P41

By dnadmin on Mon, 11/07/2022 - 09:56
Document Date
Wed, 01/06/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/06/2016 - 00:00
Page Number
41
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010620…

INTERNATIONAL

TLLA

WWHR
2ARY

3708
3ACS

4091

Vehicle Specifications Sepiember 25, 2075
2016 7600 SBA 6X4 2010 (SFG67}

Description
Base Chassis, Model 7600 SBA 6X4 2010 with 256.00 Wheelbase, 188.90 CA, and 79.00

Axle to Frame.
TOW LOOP, FRONT

FRAME RAILS Heat Treated Alloy Steel (120,000 PSI Yield); 10.125" x 3.580" x
0.312" (257.2mm x 90.9mm x 8.0mm); 480.0" (12192} Maximum OAL

FRAME REINFORCEMENT Outer "C" Channel, Heat Treated Alloy Stee! (120,000 PS!
Yield); 10.813" x 3.892" x 0.312"; (274.6mm x 98.9mm x 8.0mm); 480.0" (12192mm)
Maximum OAL

BUMPER, FRONT Steel, Swept Back

Includes
‘ BUMPER, FRONT Powder Coated Gray (Argent) Color

WHEELBASE RANGE 250" (635cm) Through and including 311" (790cm)

AXLE, FRONT NON-DRIVING {Meritor MFS-20-133A} Wide Track, |-Beam Type, 20,000-
lb Capacity

Notes

.-.Fhe-following features should-be considered-when-caleulating Frent-GAWR:-FrontAxles;..

Front Suspension; Brake System; Brakes, Front Air Cam; Wheels; Tires.
SHOCK ABSORBERS, FRONT

SUSPENSION, FRONT, SPRING Multileaf, Shackle Type, Single Stage Spring; 20,000-
lb Capacity; Less Shock Absorbers

Includes
: SPRING PINS Rubber Bushings, Maintenance-Free

Nofes
: The following features should ba considered when calculating Front GAWR: Front Axles;
Front Suspension; Brake System; Brakes, Front Air Cam; Wheels; Tires.

BRAKE SYSTEM, AIR Dual System for Straight Truck Applications

includes

: BRAKE LINES Color and Size Coded Nylon

: DRAIN VALVE Twist-Type

: DUST SHIELDS, FRONT BRAKE

: DUST SHIELDS, REAR BRAKE

: GAUGE, AIR PRESSURE (2) Air 1 and Air 2 Gauges; Located in Instrument Cluster
: PARKING BRAKE CONTROL Yellow Knob, Located on Instrument Panel

: PARKING BRAKE VALVE For Truck

: QUICK RELEASE VALVE Bendix On Rear Axle for Spring Brake Release: 1 for 4x2, 2
for 6x4

: SLACK ADJUSTERS, FRONT Automatic

: SLACK ADJUSTERS, REAR Automaiic

: SPRING BRAKE MODULATOR VALVE R-7 for 4x2, SR-7 with relay valve for 6x4

Proposal: 17583-0%

oe

Page Image
Finance Committee - Agenda - 1/6/2016 - P41

Finance Committee - Agenda - 1/6/2016 - P42

By dnadmin on Mon, 11/07/2022 - 09:56
Document Date
Wed, 01/06/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/06/2016 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010620…

INTERNATIONAL

Gode

4493

A732
AAZA

4EBT

4EXU
4EXV
4NDB |

4SPM
4VGN
5710

5CAL
SPTB
7BEP

7SDK

WBS
8000

Vehicle Specifications September 25, 2015
5016 7600 SBA 6X4 2010 (SFE67)

Description
Notes
- Rear Axle is Limited to 46,000-Ib GAWR with Code 04091 BRAKE SYSTEM, AIR and

Standard Rear Air Cam Brakes Regardless of Axle /Suspension Ordered.

BRAKES, FRONT, AIR CAM 16.5" x 6, includes 24 Sqin Long Stroke Brake Chambers

Notes
: The following features should be considered when calculating Front GAWR: Front Axies;
Front Suspension; Brake System; Brakes, Front Air Cam; Wheels; Tires.

DRAIN VALVE {Berg} Manual; With Pull Chain, for Air Tank

AIR BRAKE ABS {Bendix AntiLock Brake System} Full Vehicle Wheel Control System (4-
Channel)

AIR DRYER {Bendix AD-IP} With Heater

includes
- AIR DRYER LOCATION Inside Left Rail, Back of Cab

BRAKE CHAMBERS, REAR AXLE {Bendix EverSure} 30/30 Spring Brake

BRAKE CHAMBERS, FRONT AXLE {Bendix} 24 Sqin

BRAKES REAR AIR CAI S- Camm 16.8" 7.0" ihellides 30/30 Sq:in: Long Stroke Brake
Chamber and Spring Actuated Parking Brake

Notes

‘ The following features should be considered when calculating Rear GAWR: Rear Axles;
Rear Suspension; Brake System; Brakes, Rear Air Cam: Brake Shoes, Rear; Special
Rating, GAWR; Wheels; Tires.

AIR COMPRESSOR {Bendix BA-921 Head Unload} 15.9 CFM.Capacity, Single Cylinder
AIR TANK Painted Aluminum, With Straight Thread O-Ring Poris
TEERING COLUMN Tilting and Telescoping
STEERING WHEEL 2-Spoke, 18" Diam., Black
STEERING GEAR (2) {Sheppard M-100/M-80} Dual Power

EXHAUST SYSTEM Switchback Horizontal Afterireaiment Device, Frame Mounted Right
Side Under Cab; Includes Single Vertical Tail Pipe, Frame Mounted Right Side Back of
Cab

includes
- EXHAUST HEIGHT 10' Exhaust Height - Based on Empty Chassis with Standard
Components (+ or - 1" Height?)

ENGINE COMPRESSION BRAKE by Jacobs; for N13 Engines, With Selector Switch and
On/Off Switch

MUFFLER/TAIL PIPE GUARD (1) Bright Stainless Steel
ELECTRICAL SYSTEM 12-Volt, Standard Equipment

4 Proposal: 17633-01

Page Image
Finance Committee - Agenda - 1/6/2016 - P42

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1790
  • Page 1791
  • Page 1792
  • Page 1793
  • Current page 1794
  • Page 1795
  • Page 1796
  • Page 1797
  • Page 1798
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact