Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 11091 - 11100 of 38765

Finance Committee - Agenda - 10/4/2017 - P137

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
137
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

$38.) O49Z PUE S1E]/0q BAl}-ALIOZ PUB PSIPUNH SUIN "PUBSHOUT UsASS-ALIG] peapuny SUG (spsom)
~ OOSPEZETS (S4@qQUINU) € ON H3GHO JONVHD JO IWLOL
OO'STZ‘ZT$ oo'oEL‘SzT$ 00'St6'ZETS “LNNOWY t’ON Y30UO JONVHD TWLOL
OO'OSES OO OSE $ | OOT § JOSE JINVMOTIV juawisnipy yeydsy pinbr] 006
OO'OOTS 00°00T $ | OO'T $ [oot a1 paas sses5 beg
00°0S2'€$ 00°0SZ'E $ | 00'SZ $ los NOL weo> Te9
00°0S$ 000s § | OO'T $ fos va SJB EW JUaWare AresOdWa | B'ZE9
00°soss o0'sos $| sos § {OOT JS foqwiAs Insejdoway) sarajare|y Ze ZED
000s - $1 S07 Slo Jd eur] ZT ‘Sdulseyw Juawaned Inse|doway] aapaljalonay ZITE ZED
oo'os 2 $ | 020 $ |o iT aur] b ‘SBUDeIN JUaWaned luled aAIAJaI0NaY] POTO'ZES
pooszss 00'SZ8'TS oo'00s'z § | 00T $ |o0s'z JNVMOTIV Ayes] Jo asuevaiwyeyy T6T9
pooroso'Ts QO'OST’ES 00'002'r “§ | 00'T $ |00z‘r JONVMOTIV sidage|4 L819
fOO'OS o0'0s = $ | OO'T $10 JONVMOTIV SIBNEO PSuuoyuy 989
o00'00s"e$ 00°00S’E $ | 00'SE § jOOT ‘1 BuIqIND aYURID jasay $'609
o'00s'TS 00°00S'T S}oosze . $ | va BD pue aulesy ujseg y2}29 adeday 8¥°S09
O0"000'ES 00°000'E §.] O0°SZE $ |8 Wi 32215 pue awlesy BoyURW] adejday Sb ¥09
00°00S'e$ 00°00S"E $}oo0se = $ fot va s#unjseD dulysixy apes Oo} Funsnipy Sp'b09
poor 00'0%9 $ } 00°08 518 dA SBINjONAIS SUSIXA JO Jjeday P09
[oo'000'ns 00°000'r | $]oooco'r =$|z va uiseg Yje) 40} UONeJOIsay peoy @'E09
jco'0s = S | 00'78 S$ ]0 Fe adi 22327 Uiseg YoI2> aoeiday pue saoway TZ’€09
00 00%'TS OO'0Or'T $]00002 . $ |z dA Uiseg Yate) avejday pue saoway z'€09
o0°000°ES 00°'000‘E $ | OO'OT S |O0E AS Suonisued] dulue}d plop Cty
o0'OSz'CTS 00°0SZ‘OT $ } ose $ }OOT'r AS duel pjop Lt
00'006$ 00°006 $ | 00'Szz Siv va Suydwes yeydsy 6TT Or
00°'000'S$ 00'000'S $ | 00'02T $ |os NOL poYylay) pus} “WuawWaneg sNoUILINg JO} ZT €0r
o0'OSO'TES 00°0S0'TE $ | 00°69 § |OS¢ NOL Poy, aulyseW “WuaWaAeY SNOUILNG JOH TL EOP
O0'0S2'ES 00'0S2’E S| oo'sZ $ |os NOL Ssapjnoys 10) ajedaiddy paysn5 Ee POE
00°000'S$ 00'000'rS § | 007 § joos’y AS apeisay pue UOIZEAEIxy Peoy ZIT E0%
€# ¥3dHO JONVHI
SIYNLNULS YaMas ONIAWd 3DYd LIVYULNOD | FdYd UNA | ALD 153 LINN NOLdiuosaa WA
WVYDOUd ONIAVd 9T0Z
(Il 8SeUd) €'ON YACHO SONVHO
SSNTWA 40 FINGSHOS WVdDOdd ONIAVd LASYLS BLAS

Page Image
Finance Committee - Agenda - 10/4/2017 - P137

Finance Committee - Agenda - 10/4/2017 - P138

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
138
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

CHANGE ORDER

No. 3
PROJECT: 2016 Paving Program
OWNER’S CONTRACT NO. : IFB0660-020316
EXECUTED CONTRACT DATE: March 18, 2016
DATE OF ISSUANCE: September 27, 2017 EFFECTIVE DATE: Upon City Approval

OWNER: City of Nashua, NH
OWNER’s Purchase Order NO.: 126118
CONTRACTOR: Brox Industries Inc.

ENGINEER: DPW Engineering

You are directed to make the following changes in the Contract Documents:
Description: Change Order 3, for $137,945, is to add budget to line items according to the attached
schedule of values. This Change Order is primarily for 1) completing additional patching (4000 SY) to

remaining streets in Change Order 2, as directed by the Engineer, and 2) adding approximately 1000
LF of Beauview Avenue to be milled and paved.

Attachment(s):

> FY16 Street Paving Program, Change Order No. 3 — Schedule of Values

Change Order # 3 1 of 2
2016 Paving Program

Page Image
Finance Committee - Agenda - 10/4/2017 - P138

Finance Committee - Agenda - 10/4/2017 - P139

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
139
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Summary

CHANGE IN CONTRACT PRICE:
Original Contract Price

$2,627,902.45

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion: October 15, 2017
Ready for final payment: October 31, 2017

Net changes from previous Change Orders

$2,058,630.00

Net change from previous Change Orders

None

Contract Price prior to this Change Order

$4,686,532.45

Contract Times prior to this Change Order

Substantial completion: November 17, 2017
Ready for final payment: December 15, 2017

Net Increase (decrease) of this Change Order

$137,945.00

Net Increase (deerease) of this Change Order

Substantial completion: 0 days
Ready for final payment: 0 days

Contract Price with all approved Change Orders

Contract Times with all approved Change Orders

$4,824,477.45 Substantial completion: November 17, 2017
Ready for final payment: December 15, 2017
RECOMMENDED: ACCEPTED: APPROVED:
By: By: By:
DPW Name Mayor Jim Donchess
Engineering Contractor Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)
Date: Date: Date:
Change Order # 3 2 of 2

2016 Paving Program

Page Image
Finance Committee - Agenda - 10/4/2017 - P139

Finance Committee - Agenda - 10/4/2017 - P140

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
140
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

22) THE CITY OF NASHUA ‘The Gate City”

Financial Services

Purchasing Department

September 28, 2017
Memo #18-037

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2017 PAVEMENT PRESERVATION MAINTENANCE PROGRAM — CHANGE ORDER
NO.1 (VALUE: $150,000)
DEPARTMENT: 160 ADMIN/ENGINEERING; FUND: GENERAL
ACTIVITY: MULTI-YEAR PAVING

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated September
28, 2017 for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works (September 28, 2017 meeting) and the Purchasing Department
recommend the approval of this change order to Sealcoating, Inc. of Braintree, MA in an amount of

$150,000.

Respectfully,
i

Dan Kooken
Purchasing Manager

Ce: S Dookran L Fauteux

229 Main Street e Nashua, New Hampshire 03061 * Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 10/4/2017 - P140

Finance Committee - Agenda - 4/6/2022 - P267

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
267
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

labor, tools and equipment necessary to complete the work as specified in these
Specifications and as directed by the Engineer.

NOTE:

1. The restoration of the pavement and base course gravels around the frame
and cover shall be paid for separately under the appropriate ROADWAY
RESTORATION contract items.

K. CATCH BASIN CASTING (DOUBLE GRATE)
Measurement:
The quantity to be measured under ITEM 6G shall be by the actual number of
catch basin castings (Double Grate) by the EACH, complete-in-place, as
specified in these Specifications and as directed by the Engineer.

Payment:
The accepted quantity of catch basin castings (See Double Grate Detail on

Plans) shall be paid for at the contract unit price under ITEM 6G, and shall be
full compensation for furnishing and installing double grate catch basin
castings, and all labor, tools and equipment necessary to complete the work as
specified in these Specifications and as directed by the Engineer.

L. CONNECT NEW SEWER OR DRAIN TO EXISTING MANHOLE OR CATCH
BASIN WITH EXISTING HOLE

Measurement:

The quantity to be measured under ITEM 6H will be the actual number of
sewer line connections to existing manholes measured by the EACH,
complete-in-place, as specified in these Specifications and as directed by the
Engineer.

Payment:
The accepted quantity of sewer line connections to existing manholes shall be

paid for at the contract unit price under ITEM 6H, and shall be full
compensation for connecting new sewer line to existing manhole,
modifications to the pipe to manhole joint to form a watertight connection, by-
pass pumping, decanting and disposal of debris at the City landfill and all
labor, tools and any other equipment necessary to complete the work as
specified in these Specifications and as directed by the Engineer.

M. CONNECT EXISTING SEWER LINE OR DRAIN LATERAL TO NEW
MANHOLE OR CATCH BASIN
Measurement:
The quantity to be measured under ITEM OI will be the actual number of
connections of existing sewer lines or drain laterals of any size up to 18-inch
diameter to new manholes measured by the EACH, complete-in-place, as
specified in these Specifications and as directed by the Engineer.

2022 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -7

Page Image
Finance Committee - Agenda - 4/6/2022 - P267

Finance Committee - Agenda - 10/4/2017 - P141

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
141
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

To:

From:

Re:

D. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: September 28, 2017

Stephen Dookran, P.E., City Engineer
Engineering Department

2017 Pavement Preservation Maintenance Program
Change Order No. 1 to FY17 Sealcoating Contract

To approve Change Order No. | to the preservation contract for the FY17
Pavement Preservation Maintenance Program to Sealcoating, Inc. (Sealcoating) of
Braintree, MA in the amount of $150,000.00. Funding will be through
Department: 160 Admin/Engineering; Fund: General; Activity Description:
Multi-Years Paving.

Stantec has been surveying the conditions of street pavement in the city and
updating the database. They recommend that more crack sealing be done in order
to keep up with the original goals of the program. Cracksealing as much done
prior to winter setting will be more beneficial. Streets will be chosen from
Stantec’s updated list. We are requesting a change order to the existing 2017
Pavement Preservation Maintenance Program.

The 2017 Pavement Preservation Maintenance Program, in the amount of
$327.423.94, was awarded to Sealcoating, Inc. of Braintree, MA in June 2017.
These streets that will be chosen for crack sealing will be from PCI Band#2 (93 —
87 PCI, which require routine maintenance. This will extend life of these streets
and maintain PCls in this range.

The total value of Change Order No. 1 is $150,000.00. With Change Order No. 1,
the total contract value is $477,423.94.

Page Image
Finance Committee - Agenda - 10/4/2017 - P141

Finance Committee - Agenda - 10/4/2017 - P142

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
142
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

CHANGE ORDER
No.}t

PROJECT: 2017 Pavement Preservation Maintenance Program
OWNER’S CONTRACT NO. : IFB0660-040617

EXECUTED CONTRACT DATE: June 13, 2017

DATE OF ISSUANCE: September 27, 2017 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.: 134276

CONTRACTOR: Sealcoating, Inc

ENGINEER: DPW Engineering

You are directed to make the following changes in the Contract Documents:

Description: Change Order 1 is for an additional $150,000 to the contract for the purpose of applying
crack sealing to City streets. This budget will be used for items associated with crack sealing items:
405.11 (Crack Sealing); 618.6 (Uniformed Officers); 618.7 (Flaggers); and 619.1 (Maintenance of
Traffic). Streets selected for treatment and use of the bid items listed will be finalized and approved by
the Engineer prior to performing the work.

Change Order # 1
1 of 2

2017 Pavement Preservation
Maintenance Program

Page Image
Finance Committee - Agenda - 10/4/2017 - P142

Finance Committee - Agenda - 10/4/2017 - P143

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
143
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Summary

CHANGE IN CONTRACT PRICE:
Original Contract Price

$327,423.94

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion: October 15, 2017
Ready for final payment: October 31, 2017

Net changes from previous Change Orders

$0.00

Net change from previous Change Orders

None

Contract Price prior to this Change Order

$327,423.94

Contract Times prior to this Change Order

Substantial completion: October 15, 2017
Ready for final payment: October 31, 2017

Net Increase (deerease} of this Change Order

$150,000.00

Net Increase (deerease} of this Change Order

Substantial completion: 45 calendar days
Ready for final payment: 45 calendar days

Contract Price with all approved Change Orders

Contract Times with all approved Change Orders

$477,423.94 Substantial completion: November 30, 2017
Ready for final payment: December 15, 2017
RECOMMENDED: ACCEPTED: APPROVED:
By: By: By:
DPW Name Mayor Jim Donchess
Engineering Contractor Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)
Date: Date: Date:

Change Order # 1

2017 Pavement Preservation
Maintenance Program

2 of 2

Page Image
Finance Committee - Agenda - 10/4/2017 - P143

Finance Committee - Agenda - 10/4/2017 - P144

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
144
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

\ THE CITY OF NASHUA “The Cate City

Financtal Services

Purchasing Department

ETS POR

September 28, 2017
Memo #18-038

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: MAIN STREET VEHICLE DETECTION AT ALLDS STREET (VALUE: $17,880)
DEPARTMENT: 161 STREETS; FUND: GENERAL
ACTIVITY: STREET INFRASTRUCTURE IMPROVEMENTS $4,174
DEPARTMENT: 161 STREETS; FUND: PAVING TRUST
ACCOUNT CATEGORY: 81 — INFRASTRUCTURE IMPROVEMENTS $13,706

Please see the attached communication from Wayne R. Husband, P.E., Senior Traffic Engineer dated
September July 28, 2017 for the information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The Senior Traffic Engineer, Board of Public Works (8/28/2017 Meeting) and the Purchasing Department

recommend the award of this contract in an amount of $17,880 to Electric Light Company of Cape
Neddick, ME.

Respectfully,

Purchasing Manager

Ce: W Husband L Fauteux

a) Main Street e Nashua, New Hampshire 03061 e Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 10/4/2017 - P144

Finance Committee - Agenda - 10/4/2017 - P145

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
145
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

4
oO

From:

Re:

F. Motion:

Attachment:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: September 28, 2017

Wayne R. Husband, P.E. Senior Traffic Engineer
Engineering Department

Main Street Vehicle Detection at Allds Street

To approve the contract with Electric Light in the amount of $17,880 for the
installation video vehicle detection at the intersection of Allds Street and Main
Street. Funding will be through Department: 161 Streets; Fund: General;
Activity: Street Infrastructure Improvements ($4,174) and Department: 161
Streets; Fund: Paving Trust; Account Category 81 - Infrastructure Improvements
($13,706).

Electric Light Company Quote

In preparation for the paving of Main St south of Allds St, the traffic detection loops
were cut by the milling operation and work being done by Pennichuck Water Works.
Pennichuck Water Works is contributing their share of the replacement cost to the
paving account since the paving project will replace all the loops at the same time.

Rather than replace the underground loops at a cost of $13,706, the City views this as
an opportunity to install above ground vehicle detection in the form of video cameras
at a cost of $17,880. The underground loops are constantly damaged or cut through
sometimes by snow plows or just wear and tear. Above ground detection avoids many
of the impacts associated with construction activities in the roadway.

Electric Light Company submitted a quote to perform the work at a cost of $17,880
(attached). They have recently installed several cameras along Daniel Webster
Highway in Nashua under similar circumstances where putting back loops was less
feasible. This will be paid for by the paving account ($13,706) and the DPW
infrastructure account ($4,174). Electric Light has done reputable work over the last
several years for the City of Nashua on several similar traffic signal improvement
projects. They have also been very competitive with their pricing.

Page Image
Finance Committee - Agenda - 10/4/2017 - P145

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1106
  • Page 1107
  • Page 1108
  • Page 1109
  • Current page 1110
  • Page 1111
  • Page 1112
  • Page 1113
  • Page 1114
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact