Finance Committee - Agenda - 10/4/2017 - P128
T. Buck Consiruction, inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 30
[Proposal Submitted to: Phone: (802) 431-1422 Date 8/4/2017
Wright-Pierce Fax: (866) 783-7101
baer Job Name
230 Commerce Way, Suite 302 Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code: Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone:
Andy Morrill
e hereby submit specifications and estimate for:
Provide labor, material and equipment to modify C Channel for Short Channel Bar Rack floor penetration support.
Misc. Metal quote $ 1,235.00
$ 1,235.00
15% O&P $ 185.25
$ 1,420.25
GC O8&P 10% $ 123.50
TOTAL $ 1,543.75 $ 1,543.75
GC Labor $ 90.00
16% O&P $ 43.50
$ 103.50 $ 103.50
TOTAL $ 1,647.25
1) T Buck will request a 5 day extension to the contract completion time if this proposal is excepted
‘We Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
gONE THOUSAND SIX HUNDRED AND FORTY SEVEN DOLLARS
}Ail material is guaranteed to be as specified, All work to be completed in a Authorized
workmantike manner according to standard practices. Any alteration or Signature
Meviation from above specifications involving extra costs will be executed only Mark McPheters
Ripon written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidenis or delays beyond Note: This proposal may be withdrawn
eur control, Owner to carry fire, tornado and other necessary Insurance. Our by us if not accepted within 5 days.
pvorkers are fully covered by Workman's Compensation Insurance.
fos of acceptance
Acceptance of Proposal The above prices, specifications and
ine work as specified. Payrnent will be made as outlined above.
Signature