Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10891 - 10900 of 38765

Finance Committee - Agenda - 8/2/2017 - P23

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
23
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

To:

From:

Re:

C. Motion:

Attachment:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: July 27, 2017

Stephen Dookran, P.E., City Engineer
Engineering Department

2017 Paving Program — Phase 2 — Construction
Change Order No. 2 to FY16 Brox Contract

To approve Change Order No. 2 to the paving contract for the FY16 Paving Program to
Brox Industries, Inc. (Brox) of Dracut, MA in the amount of $ 2,058,630.00. Funding will
be through Department: 160 Admin/Engineering; Fund: General; Activity: Multi-Years
Paving. Department: 169 Wastewater; Fund: Wastewater; Activities: Sewer Structures

Change Order No. 2

As the expanded program for street paving was approved and funded in July 2017, a list of
residential streets was selected. The change order 2 is expected to pave approximately 6.5
miles of residential streets in City of Nashua. The list of streets to be paved under this
change order is attached.

Due to limited time and resources, paving bid documents/contract could not be prepared,
advertised, and solicited. Therefore, Brox was asked if they have the capacity to pave
approximately 6.5 miles of streets and would hold the prices of FY16 contract (Contract #
IFB0660-020316), to which they agreed. Also, attached is a copy of the email confirming
the same from Brox staff. This approval is for the paving of additional residential streets.

The approach used for selecting the streets for repaving is to choose to maximize its
available roads funds by generating a Network Priority Ranking (NPR) that favors cost-
effective repairs that improve and/or maintain salvageable pavement segments. This would
delay repair actions on those segments that require reconstruction or major rehabilitation.
After the relatively good roads are “preserved”, future repairs will be directed towards the
poorer, heavily traveled roads.

The additional streets were selected based on a Pavement Condition Index (PCI) of 45 or
lower or streets with the highest benefit values. Preservative maintenance treatment will
be applied to roads that are showing signs of age to extend the life of the pavement by
protecting them using a variety of techniques. These selected residential streets fall in
structural improvement PCI Band #4 (68-42 PCI) and are in poor condition. The pavement
surface has deteriorated beyond the need for surface maintenance application, therefore 2-
inch mill & overlay will be performed before the road deteriorates further and is in need of
full depth reconstruction/reclamation. Other work required includes replacing obsolete and
broken drainage and sewer castings, repairing/replacing catch basins and manholes,
replacing sewer and drain pipes, addressing street drainage problems, restriping,
replacing/resetting curbing and reconstructing driveway transitions.

Page Image
Finance Committee - Agenda - 8/2/2017 - P23

Finance Committee - Agenda - 8/2/2017 - P24

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
24
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

The total value of Change Order No. 2 is $2,058,630.00. With Change Order No. 2, the
total contract value is $ 4,686,532.45.

Page Image
Finance Committee - Agenda - 8/2/2017 - P24

Finance Committee - Agenda - 8/2/2017 - P25

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
25
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

CHANGE ORDER

No. 2
PROJECT: 2016 Paving Program
OWNER’S CONTRACT NO. : IFB0660-020316
EXECUTED CONTRACT DATE: March 18, 2016
DATE OF ISSUANCE: July 26, 2017 EFFECTIVE DATE: Upon City Approval

OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.: 126118

CONTRACTOR: Brox Industries Inc.
ENGINEER: DPW Engineering

You are directed to make the following changes in the Contract Documents:

Description: Change Order 2 is to add approximately 6.5 miles of residential streets to the 2016
Paving Program Contract. These selected residential streets will require 2-inch mill & overlay or shim
& overlay as directed by the Engineer.

Attachment(s):

> 2017 Pavement Management ~ Phase II : List of Streets
> FY16 Street Paving Program, Change Order No. 2 (Phase II) — Schedule of Values

Change Order # 2 1 of 2
2016 Paving Program

Page Image
Finance Committee - Agenda - 8/2/2017 - P25

Finance Committee - Agenda - 8/2/2017 - P26

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
26
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

Summary

CHANGE IN CONTRACT PRICE:
Original Contract Price

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion: October 15, 2017
Ready for final payment: October 31, 2017

$2,627,902.45

Net changes from previous Change Orders Net change from previous Change Orders

$0.00 None

Contract Price prior to this Change Order Contract Times prior to this Change Order

$2,627,902.45 Substantial completion: October 15, 2017

Ready for final payment: October 31, 2017

Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order

$2,058,630.00 Substantial completion: November 17, 2017

Ready for final payment: December 15, 2017

Contract Price with all approved Change Orders Contract Times with all approved Change Orders

34,686,532.45 Substantial completion: November 17, 2017
Ready for final payment: December 15, 2017

RECOMMENDED: ACCEPTED: APPROVED:

By: vo By Bye
DPW Name Mayor Jim Donchess

Engineering Contractor Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)
Date: Date: Date: _
Change Order # 2 2 of 2

2016 Paving Program

Page Image
Finance Committee - Agenda - 8/2/2017 - P26

Finance Committee - Agenda - 4/6/2022 - P285

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
285
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

C.

3.02

3.03

A

shall see that all sleeves or forms are at the work and properly set in ample time to
prevent delays. He shall see that all such chases, openings, and sleeves are located
accurately and are of proper size and shape and shall consult with the Engineer and the
contractors and subcontractors concerned in reference to this work.

In case of his failure to leave or cut all such openings or have all such sleeves provided
and set in proper time, Contractor shall cut them or set them afterwards at his own
expense, but in so doing he shall confine the cutting to the smallest extent possible
consistent with the work to be done. In no case shall piers or structural members be cut
without the written consent of the Engineer.

The Contractor shall not cut or alter the work of any subcontractor or any other contractor,
nor permit any of his subcontractors to cut or alter the work of any other contractor or
subcontractor, except with the written consent of the contractor or subcontractor whose
work is to be cut or altered or with the written consent of the Engineer. All cutting and
patching or repairing made necessary by the negligence, carelessness, or incompetence of
the Contractor or any of his subcontractors shall be done by or at the expense of the
Contractor and shall be the responsibility of the Contractor.

All cutting and coring shall be performed in such a manner as to limit the extent of
patching.

All holes cut through concrete and masonry walls, slabs or arches shall be core drilled
unless otherwise approved. No structural members shall be cut without the approval of
the Engineer and all such cutting shall be done in a manner directed by him. No holes
may be drilled in beams or other structural members without obtaining prior approval.
All work shall be performed by mechanics skilled in this type of work.

CORING:

Coring shall be performed with an approved non-impact rotary tool with diamond core
drills. Size of holes shall be suitable for pipe, conduit, sleeves, equipment or mechanical
seals to be installed.

If holes are cored through floor slabs they shall be drilled from below.

All equipment shall conform to OSHA standards and specifications pertaining to plugs,
noise and fume pollution, wiring and maintenance.

Provide protection for existing equipment, utilities and critical areas against water or
other damage caused by drilling operation.

Slurry or tailings resulting from coring operations shall be vacuumed or otherwise
removed from the area following drilling.

CUTTING:

Cutting shall be performed with a concrete wall saw and diamond saw blades of proper

2022 Sewer Replacement Project Cutting, Coring and Patching
Nashua, NH 01735-2

Page Image
Finance Committee - Agenda - 4/6/2022 - P285

Finance Committee - Agenda - 8/2/2017 - P27

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
27
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

2017 Pavement Management - Phase II

List of Streets
Route From To
ANTRIM ST BRADFORD ST CUL-DE-SAC
ASPEN CT ERION DR CUL-DE-SAC
BATES DR HILLS FERRY RD HILLS FERRY RD
BEAUSITE DR S MAIN ST APPLESIDE DR
BRINTON DRIVE W END CARON AVE
BEYOND

BUCKMEADOWRO oo CHERRYWOOD DRIVE

54 BUCK MEADOW lone poap

ROAD
CHATHAM ST BERWICK ST SUNAPEE ST
CHUNG ST CHUNG ST CUL-DE-SAC
COLBY RD CONCORD ST PRINCETON RD
DUNLAP DR FERRY RD DUNLAP DR
DUNLAP DR CUL-DE-SAC CUL-DE-SAC
ELDORADO GIR ELDORADO CIR CUL-DE-SAC
EVERETT ST LEDGE ST S END
FERRYALLS CT CANAL ST N END
FOREST ST CHARLOTTE AVE CUL-DE-SAC
GIROUARD AVE TOLLES ST PERHAM ST
HASSEL BROOK RD [FAIRVIEW AVENUE [WILSON ST
JAYRON DR WEST HOLLIS ST CUL-DE-SAC
LIBERTY ST KINSLEY ST NEW DUNSTABLE RD
MARCIA DR MCKENNA DR CUL-DE-SAC
MASSACHUSETTS DRITAYLOR ST END
MAY ST BELL ST DODGE ST
MICHELLE DR MAIN DUNSTABLE RD ISARNAC DR
MUSKET DR GILSON RD PIONEER DR
NEWFIELDS ST SUNAPEE ST BERWICK ST
OHIO AVE MASSACHUSETTS DR |MELROSE ST
OLD MILL LN HILLS FERRY RD CUL-DE-SAC
ORLANDO ST TAMPA ST NORTH INTERVALE ST
PORTCHESTER DR |BRIARCLIFF DR WHITE PLAINS DR
PRESERVE DR MANCHESTER ST DEAD END
PROSPECT STREET [DEARBORN STREET AG CHANGE( MAIN ST)
QUINTON DR RIDGE RD CUL-DE-SAC
RANCOURT ST CONCORD ST CARON AVE
RONNIE DR CINDY DR MCKENNA DR
SACRAMENTO ST IKIRK ST PASADENA AV
SANTERRE ST CARON AVE E END
SHADWELL RD AMBLE RD WHARTON RD
SPENCER DR WHITMAN RD CHAUCER RD
STANFORD RD HILLS FERRY RD LAFRANCE AVE
UNICORN WAY BROAD ST CUL-DE-SAC
VAGGE DR MAJOR DR BURKE ST
WRIGHT RD PINE HILL AVE N END

Page Image
Finance Committee - Agenda - 8/2/2017 - P27

Finance Committee - Agenda - 8/2/2017 - P28

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
28
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

S]UdD OJaZ pue SIE]]Oq ALY] pue paspuny xis ‘puUeSNOUL IysIy-Adjlg ‘UOT OM (SPsom)
OOOEN8S0'S (ssequuinu) Z ‘ON Y3CYO JONVHD JO WLOL
oo'0e9’ss0'z$ *LNNOWV Z’ON Y30NO JONVHD WLOL
00°00T ‘ET $ | 0O'T § OOT‘ET JONYMOTIV Juawysnipy yeydsy pinbry 006
00'00T S$ | OO'T S JOOT | paas sseup tt9
00°000'ST $ | oo'SsZ $ ]00z NOL WeO} Teo
00°00S $ | 0O'T $ }00S va SJE) JUaWaAed AleJodway 8'ZE9
00°S7S'Z $ | So's $ ]00S Js joquids aysejdowuay] aniqajjasad}9y 7ece9
00°0S0'Z $ |] soz $ lo00'T a BUI] ZT ‘SBUPe) JUaWaned IWIse\douay! BAIaYBJONaYy| = ZTTE'ZED
00°000°2 $ | 020 $ |000‘0T J BUI] tb ‘SAUDE JUBWIAAR JULEd BANIAYBIONOY! yOTO'ZED
00°000'SS $ | 0O'T $ ]000‘SS JONYVMOTIV Des) JO B2ueuaqUIeY| T'6T9
00°000'TS $ | 0O'T § |000‘T6 JINVMOTIV siaBge|4 L819
00°000'S $ | OO'T $ j000'S JINVMOTIV SJBIIYO pawoyuy 9819
00°00S‘ZT $ | 0O'SE $ }c0s J] Bulan) ayUeID yasay S'609
o0'00S‘zS $ | 00'SZE § JOvT va ajes9 pue awiesy Ulseg Yyr}eD adejday 8y'S09
00°00S‘7S S$ | 00'SzE $ |OvT v4 ayesg pue awesy Boyuewy asejday 9¢'709
00°000‘0rT $ | O0'0SE § ]Oov va sduSe) SUNSIXg epes O} SUNSNIpy Sv'v09
00°000‘0r $ | 00°08 $ |00s JA SaINJINIYS SulysIxg JO Weday v'v09
00°000'0Z $|oo000'% = [OT va UIseg Y}€) JO} UoHJes0}say PeoY ZZ E09
00°009‘vz § | 00°78 $ |00€ N adig jesa}e7 Uiseg yI}eD are|day pue aroway TZ’€09
00°000'Z $ | 00°002 $ ]o9 4A ulseg Yo}eD ade|day pue acqway z'€09
00°000'STT $ | O0'OT § |00S'TT AS SUOIPSUEIL BUJUC|d PjOD a LTp
00°000'00E $ | 0s'°z $ |000‘0zT AS Sulueld plod Lt
00°000'8T $ | oo'szz $ {08 va Buydwes yeydsy 6TTE0v
00°000'87 S | 00°0ZT S |00v NOL poy puey ‘uawaneg snoulwNyg 30H ZL E0P
00°08E'296 $ | 00°69 § ]OzO‘rT NOL pours) aulyreW ‘uaWaAeY SNOUIWN JOH TT €0r
00°S28'0T $ | 00°SZ S |SPT NOL slap(noys 10} ayesal3s8y paysns5 EE POE
00°000'vz $ | OO°ZT $ ]000'Z AS apelday pue uoneredxq peoy 2ET'E0%
39d LOVULNOD | 3dYd LINN | ALD LS3 JINN NOILdtudsaa Wall

SAN TVA SO AINGAHDS

(il 8S@Ud) Z;ON YACHO ADNVHO
WVeSOud ONIAVd LAAYLS 91Ad

Page Image
Finance Committee - Agenda - 8/2/2017 - P28

Finance Committee - Agenda - 8/2/2017 - P29

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
29
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

Gill, Mandeep

From: Greg Mackenzie <gmackenzie@broxindustries.com >

Sent: Saturday, July 15, 2017 8:43 PM

To: Gill, Mandeep

Ce: Nate Hoitt; Norman Saucier; jvancor@hayner-swanson.com; Dookran, Stephen
Subject: Re: 2017 Paving Program - Phase II

Attachments: image001.png

We will honor our price. Thanks for the update.
Sent from my iPhone

> On Jul 14, 2017, at 3:28 PM, Gill, Mandeep <Gill M@nashuanh.gov> wrote:

>

> Greg,

>

> Based on our meeting on Tuesday (July 11, 2017), | am forwarding you the layout and list of streets that we want to be
paved this year (maybe in September, 2017). In the list, | have highlighted Spencer street in yellow color because the
condition of the street has deteriorated and it might have to be reclaimed. We have not made a final decision on that
street. All the streets on the list will have 2-inch mill & Overlay. We estimate that approximately 119,000 square yards of
road will be milled and approximately 13,041 tons of asphalt will be laid on roads. As these streets are in old residential
neighborhood, we are not sure of the thickness of the pavement. Early next week we will be installing a core on each
street to verify the thickness of the pavement. For estimation purpose, | have assumed 2-inches pavement thickness in
our calculations. Once we will have the pavement thickness information next week, we will have better tonnage
information for you.

>

> During the meeting, you told us that you will honor the prices of original contract. Therefore, |am preparing a change
order based on the unit prices of original contract (FY16). This change order will be submitted to Board of Public Works
(BPW) this months for further review and approval. Please reply via email confirming the same that you will honor the
prices of original contract.

>

> Please feel free to call me or email me if you have any questions.

> Thanks

>

> Mandeep Gill, M.S., P.E.

> Senior Staff Engineer

> [cid:image001.png@01D2FCA9.B093E240]

> City of Nashua

> Division of Public Works

> Engineering Department

> 9 Riverside Street

> Nashua, NH 03062

> Ph#: (603)589-3123

>

>

> <image001.png>

> <Streets Area Color.pdf>

> <20170714- 2017 Paving Program-Phase 2-Paving List.pdf>

Page Image
Finance Committee - Agenda - 8/2/2017 - P29

Finance Committee - Agenda - 8/2/2017 - P30

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
30
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

§) THE CITY OF NASHUA “The Cate City’

Financial Services

Purchasing Department

July 27, 2017
Memo #18-018

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2017 STREET PAVING PROGRAM — CHANGE ORDER NO. 1 (VALUE: $474,205)
DEPARTMENT: 161 STREET; FUND: GENERAL
ACTIVITY: PAVING
DEPARTMENT: 160 ADMIN/ENGINEERING; FUND: GENERAL
ACTIVITY: MULTI-YEARS PAVING
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER
ACTIVITIES: SEWER STRUCTURES

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated July 27, 2017
for information related to this contract change order.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be

purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.
The City Engineer, Board of Public Works (July 27, 2017) and the Purchasing Department recommend

the award of this contract change order to E.J. Paving Company Inc. of Methuen, MA in an amount of
$474,205.

Respectfully,

(Fh fie.
_ Dan Kéoken -

Purchasing Manager

Ce: S Dookran L Fauteux

229 Main Street e Nashua, New Hampshire 03061 e Phone (603) 589-3330 e Fax (603) 589-3344 |

Page Image
Finance Committee - Agenda - 8/2/2017 - P30

Finance Committee - Agenda - 8/2/2017 - P31

By dnadmin on Mon, 11/07/2022 - 10:21
Document Date
Wed, 08/02/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/02/2017 - 00:00
Page Number
31
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080220…

To:

From:

Re:

B. Motion:

Attachment:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: July 27, 2017

Stephen Dookran, P.E., City Engineer
Engineering Department

2017 Street Paving Program — Construction
Change Order No. 1

To approve Change Order No. | to the construction contract for the FY17 Paving
Program to E.J. Paving Company, Inc. of Methuen, MA in the amount of
$474,205.00. Funding will be through: Department: 161 Street; Fund: General;
Activity: Paving; Department: 160 Admin/Engineering; Fund: General; Activity:
Multi-Years Paving; Department: 169 Wastewater; Fund: Wastewater; Activities:
Sewer Structures

2017 Street Paving Program Change Order No. 1

The 2017 Street Paving Program, in the amount of $1,729,148.30, was awarded to EJ
Paving Company, Inc. of Methuen, MA in March 2017. The contract included
paving of approximately 5.6 miles of City streets including 2,500 feet of Main Street
and 3,100 feet of West Hollis Street and uses repair methods such as shim, overlay,
milling and reclamation. It also includes replacing obsolete and broken drainage and
sewer castings.

Contract language allows for streets to be substituted based upon their status (i.e.;
some streets may be delayed due to utility conflicts or emergency repairs, other
streets may require postponement due to larger issues, streets may also be added that
need immediate repairs) and several streets in the program fall into these categories.
At the same time, Tinker Road has deteriorated from last winter’s effects faster than
expected and it has been determined that it should be added to this year’s paving
program immediately. The approximately 1.7 miles of Tinker Road requires paving,
milling, casting adjustments/replacements, and striping. As other streets previously
in the contract were delayed, the work on Tinker Road was substituted into the
contract. In order to complete the streets that Tinker Road was substituted for, this
change order adds back those streets bumped by Tinker Road.

Change Order 1 adds $474,205 to the contract. Also included in the change order is
the installation of roughly 500 feet of granite curbing for sidewalk (to be constructed
by the Street Department) on Fairway Street.

Proposed changes have been reviewed the E.J. Paving, Inc and have been accepted.
See attached agreement and change order schedule of values. Change Order No. 1
results in a revised contract value of $2,203,353.30.

Page Image
Finance Committee - Agenda - 8/2/2017 - P31

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1086
  • Page 1087
  • Page 1088
  • Page 1089
  • Current page 1090
  • Page 1091
  • Page 1092
  • Page 1093
  • Page 1094
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact