Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10581 - 10590 of 38765

Finance Committee - Agenda - 11/15/2017 - P265

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
265
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WOODARD & CURRAN

2)

3)

4)

WWTE SCADA Upgrades
Nashua, NH

determined and verified all field measurements, quantities,
dimensions, specified performance and design criteria,
installation requirements, materials, catalog numbers, and
similar information with respect thereto;

determined and verified the suitability of all materials
offered with respect to the indicated application, fabrication,
shipping, handling, storage, assembly, and installation
pertaining to the performance of the Work; and

determined and verified all information relative to
Contractor’s responsibilities for means, methods,
techniques, sequences, and procedures of construction, and
safety precautions and programs incident thereto.

Each submittal shall bear a stamp or specific written certification
that Contractor has satisfied Contractor’s obligations under the
Contract Documents with respect to Contractor’s review and
approval of that submittal.

Engineer’s Review

1)

2)

3)

Engineer will provide timely review of Shop Drawings and
Samples in accordance with the Schedule of Submittals
acceptable to Engineer. Engineer’s review and approval will
be only to determine if the items covered by the submittals
will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be
compatible with the design concept of the completed Project
as a functioning whole as indicated by the Contract
Documents.

Engineer’s review and approval will not extend to means,
methods, techniques, sequences, or procedures of
construction (except where a particular means, method,
technique, sequence, or procedure of construction is
specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident
thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item
functions.

Engineer’s review and approval shall not relieve Contractor
from responsibility for any variation from the requirements
of the Contract Documents unless Contractor has complied
with the requirements of subparagraph C.6. below.
Engineer’s review and approval shall not relieve Contractor
from errors or omissions in a Shop Drawing or Sample.

OVERALL GENERAL REQUIREMENTS
01 11 05-10

Page Image
Finance Committee - Agenda - 11/15/2017 - P265

Finance Committee - Agenda - 11/15/2017 - P266

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
266
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WWTE SCADA Upgrades
Nashua, NH

g. Resubmittal Procedures

1) Contractor shall make corrections required by Engineer and
shall return the required number of corrected copies of Shop
Drawings and submit, as required, new Samples for review
and approval. Contractor shall direct specific attention in
writing to revisions other than the corrections called for by
Engineer on previous submittals.

2) Contractor shall furnish required submittals with sufficient
information and accuracy in order to obtain required
approval of an item with no more than 3 submittals. Engineer
will record Engineer’s time for reviewing subsequent
submittals of Shop Drawings, samples, or other items
requiring approval and Contractor shall reimburse Owner for
Engineer’s charges for such time.

3) In the event that Contractor requests a change of a previously
approved item, Contractor shall reimburse Owner for
Engineer’s charges for its review time unless the need for
such change is beyond the control of Contractor.

Variations: Clearly identify requests for “Or-Equal” and substitute items
and submit per subparagraph 1.02.C.1.b above. Substitute items will not be
considered when indicated or implied on Shop Drawing or material and
equipment data submittals without separate written request, or when
acceptance will require revision to the Contract Documents. Identify
variations from Contract Documents and material and equipment or system
limitations which may be detrimental to successful performance of the
completed Work and identify reasons therefor at no additional cost to
Owner.. Engineer will be allowed a reasonable time within which to
evaluate each proposal or submittal made and may require Contractor to
furnish additional data about the proposed substitute item. Engineer will be
the sole judge of acceptability. No “or equal” or substitute will be ordered,
installed or utilized until Engineer’s review is complete, which will be
evidenced by a Change Order in the case of a substitute and an approved
Shop Drawing for an “or equal.”

a. “Or Equal” Items: If in Engineer’s sole discretion an item of material
or equipment proposed by Contractor is functionally equal to that
named and sufficiently similar so that no change in related Work
will be required, it may be considered by Engineer as an “or equal”
item, in which case review and approval of the proposed item may,
in Engineer’s sole discretion, be accomplished without compliance
with some or all of the requirements for approval of proposed
substitute items. A proposed item of material or equipment will be
considered functionally equal to an item so named:

OVERALL GENERAL REQUIREMENTS

WOODARD & CURRAN 01 11 05-11

Page Image
Finance Committee - Agenda - 11/15/2017 - P266

Finance Committee - Agenda - 11/15/2017 - P267

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
267
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WOODARD & CURRAN

1)

2)

WWTE SCADA Upgrades
Nashua, NH

if in the exercise of reasonable judgment Engineer
determines that it is at least equal in materials of
construction, quality, durability, appearance, strength, and
design characteristics; it will reliably perform at least equally
well the function and achieve the results imposed by the
design concept of the completed Project as a functioning
whole; and it has a proven record of performance and
availability of responsive service; and

Contractor certifies that, if approved and incorporated into
the Work there will be no increase in cost to the Owner or
increase in Contract Times and it will conform substantially
to the detailed requirements of the item named in the
Contract Documents.

Substitute Items: If in Engineer’s sole discretion an item of material
or equipment proposed by Contractor does not qualify as an “or-
equal” item subparagraph 6.a above, it will be considered a proposed
substitute item. Contractor shall submit sufficient information as
provided below to allow Engineer to determine if the item of
material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of
proposed substitute items of material or equipment will not be
accepted by Engineer from anyone other than Contractor.

1)

2)

3)

Contractor shall certify that the proposed substitute item will
perform adequately the functions and achieve the results
called for by the general design, be similar in substance to
that specified, and be suited to the same use as that specified.

Contractor shall state the extent, if any, to which the use of
the proposed substitute item will prejudice Contractor’s
achievement of Substantial Completion on time, whether use
of the proposed substitute item in the Work will require a
change in any of the Contract Documents (or in the
provisions of any other direct contract with Owner for other
work on the Project) to adapt the design to the proposed
substitute item, and whether incorporation or use of the
proposed substitute item in connection with the Work is
subject to payment of any license fee or royalty.

Contractor shall identify all variations of the proposed
substitute item from that specified, available Engineering,
sales, maintenance, repair, and replacement services; and
shall contain an itemized estimate of all costs or credits that
will result directly or indirectly from use of such substitute
item, including costs of redesign and claims of other
contractors affected by any resulting change.

OVERALL GENERAL REQUIREMENTS
01 11 05-12

Page Image
Finance Committee - Agenda - 11/15/2017 - P267

Finance Committee - Agenda - 4/6/2022 - P221

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
221
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

d. No compensation will be allowed for shop tools having a daily rental rate of less than $10 as set forth in
Section 18 of the Rental Rate Blue Book.

i. If ordered to use equipment not listed in the aforementioned publications, the ENGINEER will
establish a rental rate for such equipment. CONTRACTOR shall furnish cost data that might assist in
the establishment of such rental rate.

ii. Payment will be made for the actual time that such equipment is in operation on the work.

iii. Authorized standby time for idle equipment shall be paid at 50% of the specified rate, less the
estimated operating cost per hour. No markup will be added for overhead and profit.

iv. Rental rate paid as above provided shall include the cost of fuel, oil, lubrication, small tools,
necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance and all
incidentals. CONTRACTOR shall provide the ENGINEER with a complete Force Account Equipment
Listing for each piece of equipment utilized.

e. Sales, consumer, use, and other similar taxes related to the Work, and for which CONTRACTOR is liable,
imposed by Laws and Regulations.

f. Deposits lost for causes other than negligence of CONTRACTOR, any Subcontractor, or anyone directly or
indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and
fees for permits and licenses.

g. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance
or otherwise, sustained by CONTRACTOR in connection with the performance of the Work, provided such
losses and damages have resulted from causes other than negligence of CONTRACTOR, any Subcontractor, or
anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such
losses shall include settlements made with the written consent and approval of OWNER. No such losses,
damages and expenses shall be included in the Cost of the Work for the purpose of determining
CONTRACTOR's fee.

h. The cost of utilities, fuel, and sanitary facilities at the Site.

i. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, expressage,
and similar petty cash items in connection with the Work.

j. When the Cost of the Work is used to determine the value of a Change Order or of a Claim, the cost of
premiums for additional Bonds and insurance required because of the changes in the Work or caused by the
event giving rise to the Claim

k. When all the Work is performed on the basis of cost-plus, the costs of premiums for all Bonds and insurance
CONTRACTOR is required by the Contract Documents to purchase and maintain.

B. Costs Excluded: The term Cost of the Work shall not include any of the following items:

1. Payroll costs and other compensation of | CONTRACTOR's officers, executives, principals (of partnerships and
sole proprietorships), general managers, ENGINEERs, architects, estimators, attorneys, auditors, accountants,
purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by
CONTRACTOR, whether at the Site or in CONTRACTOR's principal or branch office for general administration of the
Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph

GC - 40 of 55

Page Image
Finance Committee - Agenda - 4/6/2022 - P221

Finance Committee - Agenda - 11/15/2017 - P268

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
268
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

WWTE SCADA Upgrades
Nashua, NH

Engineer will advise Contractor in writing of any negative
determination. Engineer will record Engineer’s costs in evaluating
a substitute proposed or submitted by Contractor. Whether or not
Engineer approves a substitute so proposed or submitted by
Contractor, Contractor shall reimburse Owner for the reasonable
charges of Engineer for evaluating each such proposed substitute.
Contractor shall also reimburse Owner for the reasonable charges of
Engineer for making changes in the Contract Documents (or in the
provisions of any other direct contract with Owner) resulting from
the acceptance of each proposed substitute.

7. Manufacturers' Installation Instructions and Certificates: Submit 2 prints

and electronic files PDF format by email of printed instructions for delivery,
storage, assembly, installation, start-up, adjusting, and finishing. Indicate
special procedures, perimeter conditions requiring special attention and
special environmental criteria required for application or installation.

a.

Submit manufacturers’ certificates for recent or previous test results
on material or equipment, but they must be acceptable to Engineer
and Owner. Indicate material or equipment conforms to or exceeds
specified requirements and provide supporting reference date,
affidavits, and certifications as appropriate.

Submit test results, data, and reports and certifications to Engineer
based on tests performed. Submit test reports and certifications for
independent testing services specified.

8. Record Documents and Closeout Submittals: Submit record documents

described in Paragraph 3.05.D. below and per Paragraph 1.03.D below.

a.

WOODARD & CURRAN

As-Builts for Material and Equipment: Submit submit 2 prints and
electronic files PDF format by email.. Indicate "As-Supplied" in
revision block and sign. Show all changes and revisions to Final
Completion per Paragraph 3.05.D.

Conformed to Construction Record Drawings: Submit 2 prints and
electronic files in .DWG format and PDF format on CD or USB
flash drive for Engineer’s use in preparing final Record Drawings.
Indicate "Conformed by Contractor to Construction Records" in
revision block and sign. Show all changes and revisions to Final
Completion per Paragraph 3.05.D.

Warranties and Guarantees: Submit duplicate notarized copies of
warranty documents which are executed and transferable from
Subcontractors, Suppliers, and manufacturers. For items of Work
delayed beyond date of Substantial Completion, provide updated
submittal within 10 days after acceptance, listing date of acceptance
as start of Warranty Period. Assemble in three ring binders with
durable plastic cover with a table of contents.

OVERALL GENERAL REQUIREMENTS
01 11 05-13

Page Image
Finance Committee - Agenda - 11/15/2017 - P268

Finance Committee - Agenda - 11/15/2017 - P269

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
269
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

d.

WOODARD & CURRAN

WWTE SCADA Upgrades
Nashua, NH

Operation and Maintenance Data

1)

2)

3)

Submit one draft copy of completed volumes 15 days prior
to final inspection. Include 2 copies of completed manuals
with major equipment when equipment is shipped. Draft
copies will be reviewed and returned after final inspection,
with Engineer's comments. Revise content of all sets as
required. For final submission. submit 2 copies of final
volumes, with electronic files in .PDF format on CD or USB
flash drive, within 10 days after final inspection.

Submit data in ring binders with durable plastic covers with
8 1/2 by 11 inch text pages. Cover: title "OPERATION
AND MAINTENANCE INSTRUCTIONS", title of Project,
and subject matter of binder when multiple binders are
required.

Subdivide binder contents with permanent page dividers,
logically organized as described below with laminated
plastic tabs and clearly print the contents. Prepare a Table
of Contents for each volume, with material, equipment, or
system description identified, in three parts as follows:

Part 1: Directory, listing names, addresses, and telephone
numbers of Contractor, Subcontractors, and major
equipment Suppliers, and service representative.

Part 2: Operation and maintenance instructions arranged by
system and subdivided by Specification section.

For each system, identify names, addresses, and telephone
numbers of Subcontractors and Suppliers. Identify the
following:

Significant design criteria

List of equipment with As-Builts certified “As-Supplied”

Parts list for each component

Operating instructions

Inspection, maintenance and adjustment instructions for

equipment and systems

° Lubrication and maintenance schedules

. Maintenance instructions for speical finishes, including
recommended cleaning methods and materials, and special
precautions identifying detrimental agents

° Troubleshooting guides

° Schematic diagrams

Part 3: Material Safety Data Sheets

OVERALL GENERAL REQUIREMENTS
01 11 05-14

Page Image
Finance Committee - Agenda - 11/15/2017 - P269

Finance Committee - Agenda - 11/15/2017 - P270

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
270
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730
Issue Date: August 2017

D.

WWTE SCADA Upgrades
Nashua, NH

Part 4: Other Project documents and certificates, including
the following:

° Certificates
° Photocopies of warranties
Closeout Procedures
1. Substantial Completion shall have been achieved when Work is complete,

systems are successfully operating, and final testing has been successfully
completed and Contractor considers the entire Work ready for its intended
use; a full inventory of the spare parts and special tools purchased by the
Owner are replenished and in the custody of the Owner; the Site has been
restored to the satisfaction of the Owner; an inspection of the Work has been
completed by the Engineer and the Owner; and an updated Punch List is
provided. The Contractor shall have sole care, custody, and control of the
Work until achievement of Substantial Completion.

Contractor shall notify Owner and Engineer in writing that the entire Work
is substantially complete (except for items specifically listed by Contractor
as incomplete) using the Notice of Substantial Completion form attached to
this section and request that Engineer issue a certificate of Substantial
Completion. Promptly after Contractor’s notification, Owner, Contractor,
and Engineer shall make an inspection of the Work to determine the status
of completion. If Engineer does not consider the Work substantially
complete, Engineer will notify Contractor in writing giving the reasons
therefor.

If Engineer considers the Work substantially complete, Engineer will
deliver to Owner a tentative certificate of Substantial Completion which
shall fix the date of Substantial Completion using the Certificate of
Substantial Completion included in the Contract Documents with Punch
List attached. Owner shall have 7 days after receipt of the tentative
certificate during which to make written objection to Engineer as to any
provisions of the certificate or attached list. If, after considering such
objections, Engineer concludes that the Work is not substantially complete,
Engineer will, within 14 days after submission of the tentative certificate to
Owner, notify Contractor in writing, stating the reasons therefor. If, after
consideration of Owner’s objections, Engineer considers the Work
substantially complete, Engineer will, within said 14 days, execute and
deliver to Owner and Contractor a definitive certificate of Substantial
Completion (with a revised Punch List) reflecting such changes from the
tentative certificate as Engineer believes justified after consideration of any
objections from Owner.

OVERALL GENERAL REQUIREMENTS

WOODARD & CURRAN 01 11 05-15

Page Image
Finance Committee - Agenda - 11/15/2017 - P270

Finance Committee - Agenda - 11/15/2017 - P271

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
271
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades

Issue Date: August 2017 Nashua, NH
4. The date of achieving Substantial Completion is the date set forth in the
Certificate of Substantial Completion that is accepted and signed by the
Owner.
5. During the period between Substantial Completion and the date for Final

Completion, Contractor shall be given access to correct items on the Punch
List and achieve Final Completion.

6. Upon written notice from Contractor that the entire Work or an agreed
portion thereof is complete using the Notice of Completion form attached
to this section, Engineer will promptly make a final inspection with Owner
and Contractor and will notify Contractor in writing of all particulars in
which this inspection reveals that the Work is incomplete or defective.
Contractor shall immediately take such measures as are necessary to
complete such Work or remedy such deficiencies.

7. Final Completion shall have been achieved when Contractor has, in the
opinion of Engineer, satisfactorily completed all corrections identified
during the final inspection and has delivered, in accordance with the
Contract Documents, documents including maintenance and operating
instructions, schedules, guarantees, warranties, bonds, certificates or other
evidence of insurance, certificates of inspection, marked up record
documents, and other required documents, and Engineer has indicated that
the Work is complete in accordance with the Contract Documents including
the following.

a. Final cleaning has been conducted and Contractor equipment and
supplies including waste materials have been removed from the Site
and legally disposed of.

b. Inspections required by Laws and Regulations are complete.
Certificates and permits to occupy and operate have been issued if
required.

C. Spare parts, maintenance and extra materials have been delivered in
quantities specified to Project Site and stored as directed.

d. A Final Application for Payment has been submitted to the Engineer
identifying total adjusted Contract Price, previous payments, and
balance due along with required documentation including:

1) all documentation called for in the Contract Documents
2) consent of the surety, if any, to final payment
3) a list of all Claims against Owner that Contractor believes

are unsettled

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-16

Page Image
Finance Committee - Agenda - 11/15/2017 - P271

Finance Committee - Agenda - 11/15/2017 - P272

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
272
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

4) complete and legally effective releases or waivers
(satisfactory to Owner) of all Lien rights arising out of or
Liens filed in connection with the Work.

8. If the final application for payment is acceptable, Engineer will give written
notice to Owner and Contractor that the Work is acceptable using the
Certificate of Final Completion form included in the Contract Documents.
Owner will thereafter make final payment and acceptance per the Contract
Documents.

1.04 QUALITY REQUIREMENTS
A. Reference Standards and Regulatory Requirements

1. Reference to standards, specifications, manuals or codes of any technical
society, organization or association, or Laws or Regulations of any
governmental authority are used whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Laws
or Regulations in effect at the time of opening of Bids (or on the Effective
Date of the Agreement if there were no Bids), except as may be otherwise
specifically stated in the Contract Documents.

2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or
responsibilities of Owner, Contractor, or Engineer, or any of their
subcontractors, consultants, agents, or employees, from those set forth in
the Contract Documents. No such provision or instruction shall be effective
to assign to Owner, Engineer, or any of their officers, directors, members,
partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the
Contract Documents.

3. Acronyms and abbreviations used are defined in the applicable versions of
the Encyclopedia of Associations published by Gale (part of Cengage
Learning) generally available in large libraries and on the internet.

B. Qualifications

1. Meet or provide capability to meet the criteria specified in connection with
the Work of the Contract Documents.

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-17

Page Image
Finance Committee - Agenda - 11/15/2017 - P272

Finance Committee - Agenda - 11/15/2017 - P273

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
273
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2. As a minimum, Contractor shall:

a. have been regularly and actively engaged in similar Work as
described in the Contract Documents, operating under the same
business name and business organization structure, for the last 5
years on at least 5 projects;

b. have successfully completed at least 3 projects involving
construction of similar facilities in the same state as the Project
covered by the Contract Documents;

C. have a full-time project manager in responsible charge of the Work
with at least 10 years’ experience as project manager on comparable
projects; and

d. carry at least the insurance coverage and amounts required in the
Contract.

PART 2— PRODUCTS
2.01 SOURCE QUALITY CONTROL
A. General

1. Subject material and equipment furnished under these Contract Documents
to a complete factory testing program as specified.

2. Shop Drawings and submittals: reviewed by Engineer before initiating
testing program.

3. Perform checks and tests in accordance with manufacturer's
recommendations and referenced standards.

4. Evaluate test results and advise Owner immediately of any discrepancy
between test results and test limits or the failure of any device or system
under test. Include test limits for acceptability applicable to each test on the
certified test records.

5. Record test information, including the evaluation of testing results, on forms
approved by Owner and Engineer.

B. Independent Testing Agency Certification
1. If specified, furnish certificates from an independent testing agency.

2. Independent testing agency to certify that material and equipment
components have been examined and tested and are in conformance with
the requirements specified in the Contract Documents.

OVERALL GENERAL REQUIREMENTS
WOODARD & CURRAN 01 11 05-18

Page Image
Finance Committee - Agenda - 11/15/2017 - P273

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1055
  • Page 1056
  • Page 1057
  • Page 1058
  • Current page 1059
  • Page 1060
  • Page 1061
  • Page 1062
  • Page 1063
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact