Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10261 - 10270 of 38765

Finance Committee - Agenda - 6/7/2017 - P121

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
121
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

PROVIDED, FURTHER, that the said surety, for value received hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the contract or to WORK
to be performed thereunder or the specifications accompanying same shall in any way affect its
obligation on this BOND, and it does hereby waive notice of any such change, extension of time
alteration or addition to the terms of the contract or to the WORK or to the specifications.

PROVIDED, FURTHER, that it is expressly agreed that this BOND shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, upon
amendment to the Contract not increasing the contract price more than 20 percent, so as to bind
the PRINCIPAL and the SURETY to the full and faithful performance of the Contract as so
amended. The term "Amendment", wherever used in this BOND and whether referring to this
BOND, the contract or the loan Documents shall include any alteration, addition, extension or
modification of any character whatsoever.

PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be

unsatisfied.
IN WITNESS WHEREOF, this instrument is executed counterparts, each one of
~~ (umber)
which shall be deemed an original,
this day of , 20
ATTEST:
Principal

By:

(Principal) Secretary
(SEAL) BY

(Address)
By:
Witness as to Principal
(Address)
(Surety)
ATTEST: BY
Attomey - in - Fact
By
Witness as to Surety (Address)
(Address)

NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND

IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State of
New Hampshire

PF - 2 of 2

Page Image
Finance Committee - Agenda - 6/7/2017 - P121

Finance Committee - Agenda - 6/7/2017 - P122

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
122
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

CONSTRUCTION PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS: that

(Name of Contractor)

(Address of Contractor)

a , hereinafter called Principal,
(Corporation, Partnership or Individual)
and
(Name of Surety)
(Address of Surety)

hereinafter called Surety, are held and firmly bound unto

(Name of Owner)

(Address of Owner)

hereinafter called OWNER and unto all persons, firms, and corporations who or which may furnish
labor, or who furnish materials to perform as described under the contract and to their successors

and assigns, in the total aggregate penal sum of Dollars,

($ ) in lawful money of the United States, for the payment of which sum well and

truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns,
jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a
certain contract with the OWNER, dated the day of

20 , a copy of which is hereto attached and made a part hereof for the construction of:

NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, and
corporations furnishing materials for or performing labor in the prosecution of the WORK provided
for in such contract, and any authorized extension or modification thereof, including all amounts
due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and
tools, consumed or used in connection with the construction of such WORK, and for all labor cost
incurred in such WORK including that be a subcontractor, and to any mechanic or material man
lienholder whether it acquires its lien by operation of State or Federal Law; then this obligation
shall be void; otherwise to remain in full force and effect.

PY - 1 of 3

Page Image
Finance Committee - Agenda - 6/7/2017 - P122

Finance Committee - Agenda - 6/7/2017 - P123

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
123
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

PROVIDED, that beneficiaries or claimants hereunder shall be limited to the subcontractors, and
persons, firms, and corporations having a direct contract with the PRINCIPAL or its
SUBCONTRACTORS.

PROVIDED FURTHER, that the said Surety for value received hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the contract or to the
WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in
any way affect its obligation on this BOND, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the contract or to the WORK or to the
SPECIFICATIONS.

PROVIDED, FURTHER that no suit or action shall be commenced hereunder by any claimant:
(a) Unless claimant, other than one having a direct contract with the PRINCIPAL shall have
given written notice to any two of the following: The PRINCIPAL, the OWNER, or the
SURETY above named within ninety (90) days after such claimant did or performed the last of
the work or labor, or furnished the last of the materials for which said claim is made, stating with
substantial accuracy the amount claimed and the name of the party to whom the materials were
furnished, or for whom the work or labor was done or performed. Such notice shall be served by
mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed
to the PRINCIPAL, OWNER, or SURETY, at any place where an office is regularly maintained
for the transaction business, or served in any manner in which legal process may be served in the
state in which the aforesaid project is located, save that such service need not be made by a
public officer. (b) After the expiration of one (1) year following the date on which PRINCIPAL
ceased work on said CONTRACT, it being understood, however, that if any limitation embodied
in the BOND is prohibited by any law controlling the construction hereof, such limitation shall
be deemed to be amended so as to be equal to the minimum period of limitation permitted by
such law.

PROVIDED, FURTHER, that it is expressly agreed that this BOND shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, upon
amendment to the Contract not increasing the contract price more than 20 percent, so as to bind
the PRINCIPAL and the SURETY to the full and faithful performance of the Contract as so
amended. The term "Amendment", wherever used in this BOND and whether referring to this
BOND, the contract or the loan Documents shall include any alteration, addition, extension or
modification of any character whatsoever.

PROVIDED FURTHER, that no final settlement between the OWNER and the

CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be
unsatisfied.

PY -2 of 3

Page Image
Finance Committee - Agenda - 6/7/2017 - P123

Finance Committee - Agenda - 6/7/2017 - P124

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
124
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

IN WITNESS WHEREOF, this instrument is executed

in

which shall be deemed an original,
this

ATTEST:

By:

(Principal) Secretary

(SEAL)

By:

Witness as to Principal

(Address)

ATTEST:

By

Witness as to Surety

(Address)

counterparts, each one of
(number)

day of , 20

Principal
BY
(Address)
(Surety)
BY

Attorney - in - Fact

(Address)

NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is partnership, all partners should execute BOND.

IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State of

New Hampshire.

PY -3 of 3

Page Image
Finance Committee - Agenda - 6/7/2017 - P124

Finance Committee - Agenda - 6/7/2017 - P125

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
125
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

DIVISION 5

AGREEMENT

Page Image
Finance Committee - Agenda - 6/7/2017 - P125

Board Of Aldermen - Agenda - 9/27/2016 - P4

By dnadmin on Sun, 11/06/2022 - 21:33
Document Date
Tue, 09/27/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 09/27/2016 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__092720…

UNFINISHED BUSINESS — ORDINANCES

O-16-011
Endorsers: Alderman Don LeBrun
Alderman Ken Siegel
Alderman David Schoneman
Alderman Tom Lopez
ADOPTING PROVISIONS FOR REDUCED TAXATION FOR CERTAIN CHARTERED
PUBLIC SCHOOL FACILITIES
e Tabled at Full Board Level — 5/10/16

O-16-016
Endorsers: Alderman David Schoneman
Alderwoman Mary Ann Melizzi-Golja
Alderman Don LeBrun
AUTHORIZING STOP SIGNS AT THE INTERSECTION OF LOCK STREET AND CROSS STREET
e Committee on Infrastructure Recommends: Final Passage

NEW BUSINESS — RESOLUTIONS

R-16-069
Endorsers: Mayor Jim Donchess
Alderman-at-Large David W. Deane
AUTHORIZING THE CITY OF NASHUA TO ENTER INTO A TEMPORARY SKATEPARK EASEMENT
AGREEMENT FOR THE DAVID W. DEANE SKATEBOARD PARK

R-16-070
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $32,366.55 FROM THE STATE OF
NEW HAMPSHIRE INTO POLICE GRANT ACTIVITY “FY2017 SUSTAINED TRAFFIC ENFORCEMENT
PATROLS (STEP)”

R-16-071
Endorser: Mayor Jim Donchess
AUTHORIZING THE CITY OF NASHUA TO EXTEND THE LEASE AGREEMENT WITH THE NASHUA
DOG OWNERS GROUP, INC. FOR THE DOG PARK AT YUDICKY FARM

R-16-072
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $249,266.77 FROM THE STATE
OF NEW HAMPSHIRE DEPARTMENT OF SAFETY INTO POLICE GRANT ACTIVITY “FY2017
OPIOID ABUSE REDUCTION INITIATIVE (OARI)”
NEW BUSINESS — ORDINANCES
PERIOD FOR GENERAL PUBLIC COMMENT
REMARKS BY THE MEMBERS OF THE BOARD OF ALDERMEN

Committee announcements:

ADJOURNMENT

Page Image
Board Of Aldermen - Agenda - 9/27/2016 - P4

Finance Committee - Agenda - 4/6/2022 - P332

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
332
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

Engineer, the Contractor shall remove the temporary pavement and install or regrade
the sub-base for installation of permanent pavement.

3.04 PERMANENT BITUMINOUS PAVEMENT:

A. The bituminous paving mixture, equipment, methods of mixing and placing, and the
precautions to be observed as to weather, condition of base, etc., shall be in
accordance with NHDOT Standard Specifications Section 401. The permanent
pavement patch shall be constructed as detailed on the plans.

B. BASE COURSE AND BINDER COURSE PAVEMENT:

1. Immediately prior to installing the base and/or binder course, the trimmed
edges shall be made stable and unyielding, free of loose or broken pieces and
all edges shall be thoroughly broomed clean. Contact surfaces of trench sides,
curbing, manholes, catch basins, or other appurtenant structures in the
pavement shall be painted thoroughly with a uniform coating of asphalt
emulsion (tack coat), just before any mixture is placed against them.

2. The binder course shall be repaired as necessary to maintain the surface of the
pavement until placement of the permanent overlay. If required, the Contractor
shall place a leveling course before placing the permanent overlay.

C. TOP COURSE OR SURFACE TREATMENT PAVEMENT:

1. Top course or surface treatment shall be placed over the full width as shown
on the drawings or as specified.

2. Prior to placement of the top course or surface treatment, the entire surface
over which the top course or surface treatment is to be placed shall be broom
cleaned and tack coated.

3. Top course or surface treatment pavement placed over trenches may be
feathered to meet existing paved surfaces, if approved by the Engineer.

3.05 PAVEMENT PLACEMENT:

A. Unless otherwise permitted by the Engineer for particular conditions, only machine
methods of placing the pavement shall be used. The equipment for spreading and
finishing shall be mechanical, self-powered pavers, capable of spreading and
finishing the mixture true to line, grade, width and crown. The mixtures shall be
placed and compacted only at such times as to permit proper inspection and
checking by the Engineer.

B. After the paving mixtures have been properly spread, initial and intermediate
compaction shall be obtained by the use of steel wheel rollers having a weight of not
less than 240 pounds per inch width of tread.

2022 Sewer Replacement Project Road Restoration
Nashua, NH 02745-5

Page Image
Finance Committee - Agenda - 4/6/2022 - P332

Finance Committee - Agenda - 6/7/2017 - P126

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
126
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the day of in the year 2017 by and between the City of
Nashua, New Hampshire (hereinafter called OWNER) and Sealcoating, Inc., 825 Granite Street, Braintree, MA
02184 and its successors, transferees and assignees together hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally
described as follows:

The scheduled work is located in various locations throughout the City of Nashua, and consists primarily
of micro-surfacing and _ crack sealing.

ARTICLE 3 - ENGINEER

3.01 The Project has been designed by: Division of Public Works
Engineering Department
9 Riverside St
Nashua, NH 03062

who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and
responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection
with completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES

4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final
payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Contract Duaration; Substanial Completion

A. The anticipated start date of the contract is on or about June 1, 2017. Project will begin once a written
“Notice to Proceed” is issued. Substantial Completion shall be by October 15, 2017. Final completion shall be by
October 31, 2017. Substantial Completion occurs when all work is complete except punch list items. The Contract
Times commence on the day indicated in the “Notice to Proceed”. Final completion occurs when all work is
completed and ready for final payment, in accordance with paragraph 14.07 of the General Conditions.

AG -1 of 7

Page Image
Finance Committee - Agenda - 6/7/2017 - P126

Finance Committee - Agenda - 6/7/2017 - P127

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
127
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that
OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus
any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the
delays, expense and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by
OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER
ONE HUNDRED dollars ($100) for each calendar day that expires after the time specified in paragraph 4.02 for
Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR
shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 4.02 for completion
and readiness for final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay
OWNER TWO HUNDRED dollars ($200) for calendar cach day that expires after the time specified in paragraph
4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

B. In the event that the CONTRACTOR fails to pay OWNER the specified liquidated damages amount
within thirty (30) days of CONTRACTOR's being notified of said damages, OWNER may deduct the amount of the
assessed liquidated damages from the final payment or retention withheld pursuant to Article 14 of the General
Conditions.

ARTICLE 5 - CONTRACT PRICE

5.01 Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR, in accordance
with the Contract Documents, the Contract Sum of:

Three Hundred Twenty-Seven Thousand Four Hundred Twenty-Three and 94/100 Dollars
($ 327,423.94 )

The Contract Sum shall include all items and services necessary for the proper execution and completion of the Work
determined below:

A. for all Unit Price Work, an amount equal to the sum of the established Unit Price for each separately
identified item of Unit Price Work times the estimated quantity of that
1tem, as indicated in the attached Bid Schedule;

B. as provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and
determinations of actual quantities and classification are to be made by ENGINEER as provided in paragraph 9.08 of
the General Conditions. Unit prices have been computed as provided in paragraph 11.03 of the General Conditions.

ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

B. CONTRACTOR shall submit Applications for Payment under this agreement directly to:

City of Nashua

Attn: Accounts Payable
PO Box 2019

Nashua, NH 03061-2019
Atten: Todd Welch

AG -2o0f7

Page Image
Finance Committee - Agenda - 6/7/2017 - P127

Finance Committee - Agenda - 6/7/2017 - P128

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
128
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

To facilitate the proper and timely payment of applications, the City of Nashua requires that all invoices contain
a valid PURCHASE ORDER NUMBER.

6.02 Progress Payments; Retainage

A. Progress Payments. The OWNER will once each month make a progress payment to the
CONTRACTOR on the basis of an estimate of the total amount of work done to the time of the estimate and its value as
prepared by the CONTRACTOR and approved by the ENGINEER. All such payments will be measured by the
schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as provided in the General
Requirements.

B. Retainage. The OWNER will retain a portion of the progress payment, each month, in accordance
with the following procedures:

1. The OWNER will establish an escrow account in the bank of the OWNER’S choosing.
The account will be established such that interest on the principal will be paid to the
CONTRACTOR. The principal will be the accumulated retainage paid into the account by
the OWNER. The principal will be held by the bank, available only to the OWNER, until
termination of the contract.

2. Until the work is 50% complete, as determined by the ENGINEER, retainage shall be 10% of
the monthly payments claimed. The computed amount of retainage will be deposited in the
escrow account established above.

3. After the work is 50% complete, and provided the CONTRACTOR has satisfied the
ENGINEER in quality and timeliness of the work, and provided further that there is no
specific cause for withholding additional retainage no further amount will be withheld. The
escrow account will remain at the same balance throughout the remainder of the project.

6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General
Conditions, OWNER shall hold 2% retainage during the 1 (one) year warranty period and release it only after the
project has been accepted.

ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS
7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data
identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local,
and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations
that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has carefully studied all Gf any): (1) reports of explorations and tests of subsurface

conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the

AG -3of7

Page Image
Finance Committee - Agenda - 6/7/2017 - P128

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1023
  • Page 1024
  • Page 1025
  • Page 1026
  • Current page 1027
  • Page 1028
  • Page 1029
  • Page 1030
  • Page 1031
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact