Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 10271 - 10280 of 38765

Finance Committee - Agenda - 6/7/2017 - P129

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
129
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of
Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions.

CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as provided in paragraph 4.2 of the
General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and
may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER
do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Contract Documents with respect to Underground Facilities at or contiguous to the site.

E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of
construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety
precautions and programs incident thereto.

F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests,
studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in

accordance with the other terms and conditions of the Contract Documents.

G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the
Site that relates to the Work as indicated in the Contract Documents.

H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the Site, reports and drawings identified in the Contract Documents and all
additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by
ENGINEER is acceptable to CONTRACTOR.

J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.

ARTICLE 8 - CONTRACT DOCUMENTS
8.01 Contents
A. The Contract Documents consist of the following:

1. This Agreement;
2. General Conditions;
3. Supplementary Conditions;
4. Bid Bond;
5. Bid Form;

6. Performance Bond:

AG -4o0f7

Page Image
Finance Committee - Agenda - 6/7/2017 - P129

Finance Committee - Agenda - 6/7/2017 - P130

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
130
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

7. Payment Bond;

8. Certificate of Insurance

9. Technical Specifications as listed in Table of Contents

10. Addenda (numbers 1 to __ 1 _, inclusive);
11. Exhibits, as listed in the Table of Contents, to this Agreement

12. The following which may be delivered or issued on or after the Effective Date of the Agreement
and are not attached hereto:

a. Written Amendments
b. Change Order(s)

14. New Hampshire Department of Transportation “Standard Specifications for Road and Bridge
Construction”, latest edition, incorporated by reference or unless otherwise indicated.

15 “Manual of Uniform Traffic Control Devices”, latest edition, incorporated by reference.

16 City of Nashua, Standard Specifications for Sewers and Drains, Revised, Approved and Adopted
June 15, 1992, incorporated by reference.

17 City of Nashua, Standard Specifications for Road Construction, Approved and Adopted June 11,
1986, incorporated by reference.

18 City of Nashua, Standard Specifications for Sidewalk Construction, Approved and Adopted
August 28, 1995, incorporated by reference.

19 City of Nashua Ordinance 0-03-219 (Amended), Approved November 14, 2003.
20 Fully Executed City of Nashua Purchase Order

B. The documents listed in paragraph 8.01.A are attached to this Agreement (except as expressly noted
otherwise above).

C. There are no Contract Documents other than those listed above in this Article 8.

D. The Contract Documents may only be amended, modified or supplemented as provided in paragraph
3.04 of the General Conditions.

ARTICLE 9 - MISCELLANEOUS
9.01 Terms
A. Terms used in this will have the meanings indicated in the General Conditions.
9.02. Assignment of Contract
A. No assignment by a party hereto of any nghts under or interests in the Contract will be binding on

another party hereto without the written consent of the party sought to be bound; and, specifically but without
limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to

AG -5of7

Page Image
Finance Committee - Agenda - 6/7/2017 - P130

Finance Committee - Agenda - 6/7/2017 - P131

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
131
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any
written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents.

9.03. Successors and Assigns

A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all
covenants, agreements, and obligations contained in the Contract Documents.

9.04 Severability

A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or
Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER
and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or
part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the
stricken provision.

9.05 Choice of Law and Venue

A. This agreement shall be governed exclusively by the laws of the State of New Hampshire and any
claim or action brought relating to this contract, the work performed or contracted to be performed thereunder, or
referable in anyway thereto shall be brought in Hillsborough County (New Hampshire) Superior Court Southern
Judicial District or in the New Hampshire 9th Circuit Court—Nashua and not elsewhere

Address for giving notices to Owner: Address for giving notices to Contractor:
Division of Public Works Sealcoating, Inc

9 Riverside Street 825 Granite Street

Nashua, NH 03062 Braintree, MA 02184

Agent for service of process:

Elizabeth Wuori, President

AG -6 of 7

Page Image
Finance Committee - Agenda - 6/7/2017 - P131

Finance Committee - Agenda - 6/7/2017 - P132

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
132
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart
each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have
been signed, initialed or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf.

CITY OF NASHUA —- OWNER

James Donchess, Mayor City of Nashua

Date:

CONTRACTOR:
By:

(Authorized Representative)

Print Name:

Date:

AG -7of7

Page Image
Finance Committee - Agenda - 6/7/2017 - P132

Finance Committee - Agenda - 6/7/2017 - P133

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
133
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

DIVISION 6

GENERAL CONDITIONS

Page Image
Finance Committee - Agenda - 6/7/2017 - P133

Finance Committee - Agenda - 6/7/2017 - P134

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
134
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

TABLE OF CONTENTS

Page
ARTICLE 1 - DEFINITIONS AND TERMINOLOGY ..........essccsssscscccesssncscccscccseessescescsacsesseassncsceceacsncssnseenss 4
1.01 Defined Terms oo... ccc ccc cece c ne enn n enn E OnE OnE EEE Ee EEE ec dE CEE CHE CHE SHES dE SEE ECE EDGE btetetatenateeisesieesies 4
1.02 Terminology oo. .occcccccccccccc ccc cec ene cc eect cnt ene cn ne enn E DLE EDEL ESET EEE E CEE EE CHEE CEE CEE CHES HE SE SEE EEE EDd EDGED tatetadetiaeenaeenes 7
ARTICLE 2 - PRELIMINARY MATTER. ............cccssssscssscessssssesceassacsesceassncssessaccnsssessescnacsnceeaseassncsceseacenssseseeses 8
2.01 Delivery of Bonds .......0.cc ccc ccc cece ee eee ene nen EEE En EE EC EE PELE EDL E CELE Dba decade cide cide cide cide tiesieeiiteniieniitens 8
2.02 Copies of Document ......000o ccc ccc eee en eee cn ne ene enn EO EE EO LE FELT EELS EC EE EC bade badder decide cide esdetdeeiieeniteniseniieens 8
2.03 Commencement of Contract Times; Notice to Proceed 20.0.0... eccccccccececsscescecccecessestsesecceessesttntseceeeseeseenaas 8
2.04 Starting the Work 20... ccc ccc ce ec ee ee eee cece ELE EDEL EE LEEEEEEDLE EDEL EC bade bade cide cide cide cide tietiieenitenireniitens 8
2.05 Before Starting Construction 00.0000 ccc cece cee cnc cee e ne ener cnet ee ne eed tenet ene t ened eta de cide cide cde tiesiessieeiireniseniitens 8
2.06 Preconstruction Conference .......00 ccc ccc cece ence tec ne ene cn ne enn e end eens Eene tenet ecad sci de cide cide cide tiesiieteiteniieniitens 9
2.07 Initial Acceptance of Schedules... cece c cee nee ne center eens tenet bbe se ee de cide cassie snesiesiieenirenireniieees 9
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 00.0... cscssccssccesssesseceeecessencees 10
B01 Vinternt occ ccc cece etecscesecseeseesessessesecsecsesseceesessessesesseesecseesecsesseesessessseesecsesseesenseesesseeseseteceeseeseees 10
3.02 Reference Standards 0.0.0... cee eee ee ee ence een e cE CECE EO EE ELLE EEE EDGE OtEE Cte deta deenat eae tiieeieesiees 10
3.03 Reporting and Resolving Discrepancies .....00..0.0 ccc ccc cee cee ene cc eee ce neces eens tens tenet eneteeeseeascnasetieenieesiees 10
3.04 Amending and Supplementing Contract Documents 2.0.0.0... ccc cccec cect eens tees seesteeeseesaeeaestieeneeniees ll
3.05 Reuse of Documents 0.0.0... cece een eee eet eee cece OE EEE SO EE ELLE ROLE EDGE OnE tobe debade bide ciaecieenieeiees 11
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS .u........ccsccsscocssecsscssccnscsecsescescsacsesceassnsssessascnsssasssscnacsnseesseassnaseaseasenasenssecensssnseesseasenssssaseues 11
4.01 Availability of Lands oo... cocci ccc ec ee eee eee ener S EEE LEE EO EE EDEL ED LEEDnEE Dba dete d eta deciaseiaeciaesieenieeiees ll
4.02 Subsurface and Physical Conditions .......0.0000ccc cece ccc cece ccc cence neces eens cece eens eens eeteseneteeiteeaseeectiestiesieesiees 12
4.03 Differing Subsurface or Physical Conditions ......0..00.c ccc cece cece cece cece tess tees teeeseneteeesecaseniecniesiiessesseees 13
4.04 Underground Facilities 000.0000 ccc ccc cece cece cn ne ene ene ene Ente EO nEEDtEE eta Seba dete de eide caus enaeciaesieesieeiees 14
4.05 Reference Points 2.00... ccc ccc ccc cee cee ee ee eee cece CECE EEE LEE ELLE ROLE EDGE SLES Dba debate tide ciat enue ciaecieenstensiees 15
4.06 Hazardous Environmental Condition at Site 0.0.00. c cee cc ce cene eens eens eeneseneteeesecaseneectiestieeseeniees 15
ARTICLE 5 - BONDS AND INSURANCE ..........ccccsscssssecssscescscsesceassncseecsaccnscsecsescnacsncsesceasencsceseacsnsssecsesenasensees 17
5.01 Performance, Payment, and Other Bonds .0......000 coc cece cece ccc ene ee ne cece eens tenseeneteneteeeseeascneestieeseeniees 17
5.02 Licenses Sureties and Insurers .......0.cc ccc cece cece ccc ete ene e ene cre cbt ene cone en be tend tebe tebe tenet eteaeenaecaeenieenieeniees 17
5.03 Certificates of Insurance .....0..0 ccc cc ccc cence cece been ene ce cece EL ne ELLE FEES Dee eta t ete te baat eiaeeiateieenieeiees 17
5.04 CONTRACTOR’s Liability Insurance ..0..000 occ ccc ccc cce cee cee cnet ne ecce eens tens eeneteneteseaeeaseniestieeseeniees 17
5.05 Property Insurance ........ cece cece cece cec cece cece ne eee e enna cece eee GEeELE Gece Ec cade ee ta GE Sae Ge cadEeeeaaeebteeeciiseeeieeetieeeaes 19
5.06 Waiver of Rights 0.00.0 cece enn n en ene nde cde CEE CHE COE SE ELLE ELLE EDGE Da Sete teta de bideenasenaecitenteniees 20
ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIEG.\.............:cscsssssscssscessscssscescscsescsassncseeseacsecssecsesceasensees 20
6.01 Supervision and Superintendence 0.00.00 cce cence eee cece cc ne cele eetd tens eeneteneteteaeeasenieetieenieeniees 20
6.02 Labor; Working Hours .....0.0..cc ccc cece een eee eee e eee cece cE OnE EO ne SELES DE EDGE etd E ete de baat ends cae eieeieeiees 20
6.03 Services, Materials, and Equipment .0....0..000000 ccc cece ecne cnt cee cc nsec ne eeceeenseenseeneseeetesaeeniscnisstieeneensees 21
6.04 Progress Schedule ......0..0 ccc ccc cece ccc een een eer eee CECE CUES EE SO EE ELLE EOE E DEE Dta toned ebedt ends cat eiaeeieeiees 21
6.05 Substitutes and “Or-Equals? o.oo ccc ccc cece ete e teeters cece ene cone en te eed eee eetetetetetiaeeiaeciaeetieenieeniees 21
6.06 Concerning Subcontractors, Suppliers, and Others ........00.co cc ccc ccc cece ee cc cess tens sees tenets eeseeeeeneestieeseesiees 23
6.07 Patent Fees and Royallttes 00.0.0 .cc ccc ccc cece ee ee eee ene cre cone ene SD EE ELLE ROLES Dna Senet ete de baat enaeciaeeieenieeiees 24
6.08 Permits oo. eccccccccccccce ec eee ene ene ene LEE LEE EEE E CLES EEE E EEE EE CEE CEE CEE CCIE CE EOLE ELLE EEE EDGE etatCbade tide ends cieeseensteesiees 24
6.09 Laws and Regulations 22.0.0... .cc ccc cece cece een ee eee cee cece CoE O EEL EE ELLE EDT EDGE Dna E eta de bade enaeciaeeieeieeiees 25
O10 Taxes ices ccc c cece cece eens eect be cee tne cELE Ee CELE EE CHEE EEEEECELE EEC HEEEEEGEEELE EE CLHE EC CAGE ED Ea GESdE Ge cade Eetadeeteeecseeeieeeeieeeaas 27
6.11 Use of Site and Other Areas 0... ccc ccc ccc cece cece ce cece cone en ne ELLE EOE EDs eeta tebe de bide enatciaeeieenieeiees 27
6.12 Record Documents... ccc ccc ccc ene nen rece cE C ECOL EOE EO EE ELLE EEE E DEE eLE EC bade ba dt eiattiaeciaeesaeesiees 28

GC - 1 of 57

Page Image
Finance Committee - Agenda - 6/7/2017 - P134

Finance Committee - Agenda - 11/15/2017 - P396

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
396
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

CHANGE ORDER
No.1

PROJECT: Primary and Secondary Digesters Cleaning

OWNER’S CONTRACT NO: IFB0285-083117

EXECUTED CONTRACT DATE: _ October 20, 2017

DATE OF ISSUANCE: November 7, 2017 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.: 137375

CONTRACTOR: Denali Water Solutions

You are directed to make the following changes in the Contract Documents:

Description: During the process of cleaning the Primary and Secondary Digesters, the sludge being
removed will not meet Class B requirements and the odors being generated will need control measures
to be provided by Remedia as proposed in the attachment.

Attachments: Denali Water Solutions proposal dated October 15, 2017

Change Order # 1 1 of 2
IFB0285-083117
Primary and Secondary Digesters Cleaning

Page Image
Finance Committee - Agenda - 11/15/2017 - P396

Finance Committee - Agenda - 11/15/2017 - P397

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
397
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Summary

CHANGE IN CONTRACT PRICE:

Original Contract Price

$273,310

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion:
Ready for final payment:

Net changes from previous Change Orders

$0.00

Net change from previous Change Orders

$0.00

Contract Price prior to this Change Order

$273,310

Contract Times prior to this Change Order

Substantial completion:
Ready for final payment:

Net Increase (decrease) of this Change Order

$48,400

Net Increase (deerease} of this Change Order

Contract Price with all approved Change Orders

Contract Times with all approved Change Orders

$321,710 Substantial completion:
Ready for final payment:
RECOMMENDED: ACCEPTED: APPROVED:

By: By: By:

Sanborn, Head & Associates Name Mayor Jim Donchess

Engineer Contractor Owner
(Authorized Signature) (Authorized Signature) (Authorized Signature)

Date: Date: Date:

Change Order # 1 2 of 2

IFB0285-083117

Primary and Secondary Digesters Cleaning

Page Image
Finance Committee - Agenda - 11/15/2017 - P397

Finance Committee - Agenda - 4/6/2022 - P234

By dnadmin on Sun, 11/06/2022 - 21:44
Document Date
Fri, 04/01/2022 - 08:56
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/06/2022 - 00:00
Page Number
234
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__040620…

5. Not resume work after the effective date of a notice of termination unless and until receipt of a written notice
from the OWNER to resume performance.

In the event of a termination for cause, CONTRACTOR shall receive all amounts due and not previously paid to
CONTRACTOR for work satisfactorily completed in accordance with the contract prior to the date of the notice, less all
previous payments. No amount shall be allowed or paid for anticipated profit on unperformed services or other
unperformed work. Any such payment may be adjusted to the extent of any additional costs occasioned to the
OWNER by reasons of CONTRACTOR's failure. CONTRACTOR shall not be relieved of liability to the OWNER for damages
sustained from the failure, and the OWNER may withhold any payment to the CONTRACTOR until such time as the
exact amount of damages due to the OWNER is determined. All claims for payment by the CONTRACTOR must be
submitted to the OWNER within 30 days of the effective date of the notice of termination.

If after termination for the failure of CONTRACTOR to adhere to any of the terms and conditions of the contract or for
failure to satisfactorily, in the sole opinion of the OWNER, to complete or make sufficient progress on the work in a
timely and professional manner, it is determined that CONTRACTOR had not so failed, the termination shall be deemed
to have been a termination at will. In that event, the OWNER shall, if necessary, make an adjustment in the
compensation paid to CONTRACTOR such that CONTRACTOR receives total compensation in the same amount as it
would have received in the event of a termination-at-will.

15.03 General Provisions for Termination

Upon termination of the contract, the OWNER may take over the work and prosecute it to completion by agreement
with another party or otherwise. In the event CONTRACTOR shall cease conducting business, the OWNER shall have
the right to solicit applications for employment from any employee of the CONTRACTOR assigned to the performance
of the contract.

Neither party shall be considered in default of the performance of its obligations hereunder to the extent that
performance of such obligations is prevented or delayed by any cause, existing or future, which is beyond the
reasonable control of such party. Delays arising from the actions or inactions of one or more of CONTRACTOR's
principals, officers, employees, agents, subcontractors, consultants, vendors, or suppliers are expressly recognized to
be within CONTRACTOR's control.

ARTICLE 16 - DISPUTE RESOLUTION

16.01 Methods and Procedures

A. The parties shall attempt to resolve any dispute related to this contract as follows. Either party shall provide to the
other party, in writing and with full documentation to verify and substantiate its decision, its stated position
concerning the dispute. No dispute shall be considered submitted and no dispute shall be valid under this provision
unless and until the submitting party has delivered the written statement of its position and full documentation to the
other party. The parties shall then attempt to resolve the dispute through good faith efforts and negotiation between
the OWNER Representative and a CONTRACTOR Representative. At all times, CONTRACTOR shall carry on the work
under this contract and maintain and complete work in accordance with the requirements of the contract or
determination or direction of the OWNER. If the parties are unable to resolve their dispute as described above within
30 days, the parties may request that the dispute be submitted to the Board of Public Works for resolution. If the
parties are dissatisfied with the decision of the Board of Public Works, the parties’ reserve the right to pursue any
available legal and/or equitable remedies for any breaches of this contract except as that right may be limited by the
terms of this contract.

GC - 53 0f55

Page Image
Finance Committee - Agenda - 4/6/2022 - P234

Finance Committee - Agenda - 11/15/2017 - P398

By dnadmin on Mon, 11/07/2022 - 10:19
Document Date
Wed, 11/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/15/2017 - 00:00
Page Number
398
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111520…

Denali |

WATER SOLUTIONS

October 16, 2017

City of Nashua, New Hampshire
229 Main Street
Nashua, NH 03060-2019

RE: Primary and Secondary Digesters Cleaning

IFB0285-083117
Odor Control Change order proposal

ATT: Mr. William Keating

Pursuant to our conversation of this afternoon, we have revised our proposal at your direction.

3308 Bernice Avenue

Russellville, AR 72802

PO Box 3036 = Russellville, AR 72811
Phone: 479-498-0500

We are deleting pre dewatering treatment intended for ambient air with both Remedia and

Potassium Permanganate.

While the exact costs remain unknown, we are utilizing the proposal of Remedia for post dewatering

treatment. All Remedia pricing herein is subject to a 10% Denali mark up. You have received the

Remedia proposal to Denali under a 10-13-17 email.

Accordingly, the cost of Post treatment for up to 6 weeks of operation is $48,400.00 after Denali

mark up.

Should you have any questions or need additional clarification, please feel free to call J. Drew

O’Hara, Senior Vice President directly at 413-530-4386 (cell).

Respectfully Submitted,
DENALI WATER SOLLUTIONS, LLC

J Che

J. Drew O’ Hara
Vice President — Dredging and Dewatering

Page Image
Finance Committee - Agenda - 11/15/2017 - P398

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 1024
  • Page 1025
  • Page 1026
  • Page 1027
  • Current page 1028
  • Page 1029
  • Page 1030
  • Page 1031
  • Page 1032
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact