Town of Rockport, MA - New Generator at Water Treatment Plant. Project Manager for the installation of a new
standby generator at the Water Treatment Plant. Responsible for design oversight and preparation of the design
documents. Oversaw bidding and construction administration phases.

Finance Committee - Agenda - 2/17/2021 - P241

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P241

Town of Hardwick, MA - Hardwick Center and Eagle Hill School Sewer Extension. Lead Project Engineer for the
design and construction of a sewer extension to the existing wastewater collection system. The solution includes a
combination conventional and low pressure sewer system with a common pumping station located in the village center and
a force main installed along Route 32A to an existing WWTF in Gilbertville. Several sources of grant/loan funding are being
pursued for this project.

Finance Committee - Agenda - 2/17/2021 - P240

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P240

Town of Tisbury, MA - Hydrogeological Evaluation for Subsurface Effluent Disposal. Project Engineer for the
permitting and design of proposed “wick” effluent disposal system to allow expansion of an existing wastewater treatment
facility. Evaluated upgrades to the WWTF to achieve total suspended solids of < 1 mg/L to allow long-term operation of the
wick systems. Project siting concerns included nutrient loading analysis in nitrogen sensitive watersheds.

Finance Committee - Agenda - 2/17/2021 - P239

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P239

City of Gardner, MA —- Headworks Upgrade. Responsible for evaluation of screening and grit removal technology.
Oversaw design of the new facility, including process and building services designs. Primary author of the Preliminary
Design Report.

Finance Committee - Agenda - 2/17/2021 - P238

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P238

City of Portland, ME - Curtis Road Pump Station Evaluation. Project Manager and Project Engineer responsible for the
evaluation of upgrade options for the City’s aging Curtis Road Pump Station, a small 300-gopm duplex pump station serving
164 single family homes in a residential neighborhood in the City of Portland. As part of a high level City-wide Sanitary
Sewer CMOM Assessment, the pump station was scheduled for elimination however the City sought to take a second look

Finance Committee - Agenda - 2/17/2021 - P237

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P237

City of Nashua, NH - Pump Station Upgrades. Project Manager for the final design of upgrades to 13 wastewater pump
stations and one combined sewer overflow pump station. The project also included design of a new force main installed
under the Nashua River. The force main was installed by horizontal directional drilling. Responsible for the technical review
of the pump and force main design, selection of pump technology, and development of plans and specifications for the
project. Oversaw permitting efforts with NHDES and local agencies.

Finance Committee - Agenda - 2/17/2021 - P236

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P236

JASON JANCAITIS, PE

PROJECT MANAGER 2

Professional Profile

Jason has 20 years' professional experience working on a wide range of
wastewater projects for municipalities and private sector clients. He has a
Bachelors degree from Carnegie Mellon University in Civil and Environmental
Engineering and Engineering and Public Policy. Jason is experienced in
wastewater treatment facility upgrades, collection system and pump stations
projects from the planning stages through construction and startup.

Related Experience

Finance Committee - Agenda - 2/17/2021 - P235

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P235

00S‘6E$ —_ | aati 904UOD joI04
ooT‘ss s}Ue}|NsUuODd qns puke sasuadxg Pas! J3YIO [BIOL
os
os
0s Waid Jad
0s [RAedL
OOTS sasuadxq
000‘s$ s]ue}nsuo) qns
oor’vEs WyOjg pue Joge7 [e10L
Lees %OT @ woud
€L7‘TES padlpul + 4oqe] jeroyqNs
00€ ‘07S S8'T @ $]S07) JaJIpU|
€L60TS j2}0 | 40qe] aIIq
00°9z$ 00'sEs LE"6bS oo°Zss 00°0rS 00'svs 00°z9S 00°SZs soyey
972 OT O€ ov ov O€ 8Y zz 9 AloZa}e) sad sunoy [e301
ove’es os ove’es 8S7$ 9£9'TS 906$ 91 8 9 z saasas sulpplg z00

Finance Committee - Agenda - 2/17/2021 - P234

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P234

FEE SUMMARY
A Based on the scope of work listed above, we have estimated the level of effort for each portion of the

_ work as listed in the table below. Billing will be on a “time and materials” basis.
a. Task Hours Budget
een 2 sire Update Design Documents/NHDES Coordination 210 $37,500
Bidding Services 12 $2,000
TOTAL 240 $39,500
PROJECT TEAM & SCHEDULE

Finance Committee - Agenda - 2/17/2021 - P233

By dnadmin on Mon, 11/07/2022 - 13:48
  • Read more about Finance Committee - Agenda - 2/17/2021 - P233

_
a. =<,
WOODARD
GCURRAN

references in the specifications will be reviewed and items which are no longer applicable to the project
will be removed, struck out or otherwise noted to be “not in contract’. An updated “front end” will be
prepared, to include an updated bid form, bid dates, measurement and payment, and summary of work
to reflect the revised project.