City of Portland, ME - Curtis Road Pump Station Evaluation. Project Manager and Project Engineer responsible for the
evaluation of upgrade options for the City’s aging Curtis Road Pump Station, a small 300-gopm duplex pump station serving
164 single family homes in a residential neighborhood in the City of Portland. As part of a high level City-wide Sanitary
Sewer CMOM Assessment, the pump station was scheduled for elimination however the City sought to take a second look
and perform a Business Case Study (BCS). The City’s goal of the BCS was to evaluate direct costs and non-direct costs
(environmental and social impacts) to select the best option to address the aging pump station. This was the City’s first
Business Case Study (BCS) and thus we were tasked with developing their process. We evaluated four options including
elimination and connection to another station, comprehensive upgrades to the existing station, prioritized upgrades, and
the “do nothing’ alternative. The four step process we created involved our work to Define the Project Drivers (safety and
health requirements, regulations, system limitations, reliability, cost efficiencies, and aesthetic concerns); Develop a
Problem Statement - the “why” for the project; Formulate the Options; and Complete a Triple Bottom Line Analysis of the
Options — present worth analysis to compare mutually exclusive options and using life-cycle cost inclusive of budgetary
impacts, risk, environmental considerations, and societal costs. The result of the BCS were well received and the City is
moving forward with comprehensive upgrades to the aging pump station, consistent with our recommendation.
City of Haverhill, MA - Odor Control Improvements. Project Manager for the design and construction administration for
odor control improvements at the Haverhill WWTF. Evaluated available technologies and developed the recommended
plan for a new facility-wide odor control system. Designed chemical storage and feed system associated with the odor
control project. Responsible for the design of a new biofilter which will treat 23,000 cfm of odorous air. Oversaw
construction administration for the project.
Lowell Regional Wastewater Utility, Lowell, MA - Wastewater Treatment Facility Upgrades. Managed design and
construction administration of the upgrades at the Lowell Regional Wastewater Utility's Duck Island WWTF. Project
includes clarifier mechanism replacement, chemical feed systems, septage receiving, sludge thickening, and associated
piping and controls improvements. Develop a Request for Proposals to allow the client to preselect critical pieces of
equipment. Managed preselection process, including the technical and vendor evaluation for new multi-stage blowers,
clarifier equipment, rotating drum thickener, and dewatered sludge conveyors. Managed the pre-qualification of general
contractors and filed sub-bid contractors in accordance with Massachusetts General Laws. Served as Project Manager
during the bidding and construction administration phases of the project.
Private Client, Mashpee MA — Wastewater Treatment Facility Evaluation. Project Manager for an evaluation of a
private wastewater treatment facility serving a retirement community in Mashpee, MA. Performed an evaluation of existing
equipment and developed a plan for upgrading the facility to meet current DEP requirements and codes. Performed a cost
estimate and evaluated several options for phased implementation of the work.
Town of Tewksbury, MA - Andover Street Force Main Replacement. Project Manager for the replacement of a 6000
LF force main in a busy commercial/industrial area of Tewksbury. Evaluated existing pump station capacity and historical
infiltration and inflow records. Prepared cost estimate for the project. Responsible for permitting of the project with
ConComm and Mass Highway. Prepared cost estimate for the project. Project Manager during bidding and construction
administration of the new force main installation.
Town of Acushnet, MA - Infiltration/Inflow Study. Project Manager for an infiltration and inflow study for the entire
collection system of the Town of Acushnet. Responsible for overseeing subcontractors, evaluating data, and presenting
recommendations to the Town for improvements.
Town of Acushnet, MA - Comprehensive Wastewater Management Plan. Developed preliminary designs for a
potential sewer expansion to serve unsewered areas in the Town of Acushnet. Developed layouts for gravity sewer design,
pump station locations, and force main layouts. Developed system curves for the proposed pump stations to determine the
pump size required. Developed cost estimates for the sewer expansion.
City of Gardner, MA - WWTF Facilities Plan. The Facilities Plan included: an evaluation of the existing treatment
process and building systems; BioWin modeling to evaluate the WWTF’s ability to remove nutrients; an evaluation of
sludge dewatering technologies, and an energy efficiency evaluation.