Town of Tisbury, MA - Hydrogeological Evaluation for Subsurface Effluent Disposal. Project Engineer for the
permitting and design of proposed “wick” effluent disposal system to allow expansion of an existing wastewater treatment
facility. Evaluated upgrades to the WWTF to achieve total suspended solids of < 1 mg/L to allow long-term operation of the
wick systems. Project siting concerns included nutrient loading analysis in nitrogen sensitive watersheds.
Town of Lunenburg, MA - Wastewater Management Plan. Project Engineer for a comprehensive wastewater
management plan for the town to include various wastewater infrastructure improvements. The project includes the full
range of tasks associated with wastewater management planning. Investigated and evaluated existing wastewater
collection system. Calculated projected wastewater flows to be generated by residential and commercial properties.
Evaluated suitability of parcels to use traditional Title 5 wastewater disposal.
Private Development, West Bridgewater, MA - WWTP Evaluation. Project Engineer for a packaged wastewater
treatment plant and land-based effluent disposal. Evaluated competing technologies for suitability to treat wastewater from
a residential development, including the feasibility of producing effluent with total nitrogen less than 5 mg/l. Evaluated
potential effluent disposal areas. Designed effluent disposal area, including groundwater mounding analysis and
determination of effluent long-term acceptance rate.
Private Development, East Bridgewater, MA - Subsurface Disposal and pressure Distribution System Design.
Designed membrane bioreactor (MBR) treatment facility and pressure distribution system for a private development.
Conducted site assessments to determine suitability for subsurface disposal. Prepared groundwater discharge permit for
submission to DEP. Evaluated packaged treatment plant alternatives for wastewater treatment on site.
Town of Cheshire, CT - Denitrification Facility. Managed engineering services during construction of the 2.7-MGD
denitrification facility. Reviewed shop drawings, resolved construction issues, and prepared change orders and monthly
pay estimates.
Town of Framingham, MA - Eaton, Chalis, and Nob Hill Pump Station Replacement. Lead Project Engineer for the
construction administration of the project, which involved the construction of two new submersible pump stations to replace
three existing stations. Project included approximately 1,000 LF of gravity sewer and 2,500 LF of force main. Responsible
for contractor oversight, client coordination, and interactions with abutters. Responsible for the start-up and commissioning
of the two new pump stations.
Town of Framingham, MA - Bethany, Irving, Herbert, Loring Water and Sewer Improvements. Lead Project Engineer
for the design and construction administration of this project, which included the replacement of approximately 3,000 LF of
water main and 1,000 LF of gravity sewer, as well as CIPP lining of another 1,500 LF of gravity sewer. Responsible for all
components of the design plans and specifications.
City of Somerville, MA - Illicit Discharge Detection and Elimination. Project Manager for CSO Monitoring and IDDE
work within Somerville, MA. This project included flow monitoring and analysis for several CSO regulators within the City.
Oversaw CCTV inspections and reviewed tapes for illicit connections. Primary author for the City’s regulatory submittals to
EPA, DEP & MWRA during the study period.
City of Medford, MA - Sanitary Sewer Evaluation and Sewer Overflow Evaluation. Lead Project Engineer for the
SSES and SSO mitigation project required as part of Massachusetts DEP Consent Order.
City of Haverhill, MA — Main Street Pump Station. Project Manager for design of a replacement submersible pump
station. Responsible for all aspects of pump station design, and plan and specification preparation. Oversaw bidding and