Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 1/15/2020 - P97

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P97

9. Analyze dewatering performance including solids capture, polymer consumption,
and cake solids. Summarize annual average, peak monthly, and peak daily sludge
quantities.

10. For WWFTF flows, summarize available data on BOD and TSS removal rates and

effluent quality in terms of concentration and loading.

E. Conduct Plant Infrastructure Assessment
1. Develop a comprehensive plant infrastructure asset inventory:

Finance Committee - Agenda - 1/15/2020 - P96

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P96

6.

Prepare technical memorandum summarizing projected growth in residential,
commercial, industrial, and institutional flows. Meet with City staff to review and

finalize memorandum.

D. Analyze WWTF Effluent Quality and Sludge Quantities

12/10/19

1,

Analyze primary treatment removal rates for BOD and TSS and typical effluent
quality both in terms of concentration and mass loading. Summarize available data
on primary sludge quantities and compare to predicted values based on removal
rates.

Finance Committee - Agenda - 1/15/2020 - P95

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P95

B. Project Administration and Meetings
1. Each month we will submit a report that details the work performed by the team
on each major task with the monthly project invoice.
2. The following meetings will occur throughout the duration of the project:
a. Eight (8) progress and brainstorming meetings with the project team and
City staff.

b. One project presentation meeting to present final report to City staff.

C. Define Current and Projected Future Influent Wastewater Flows and Loads

Finance Committee - Agenda - 1/15/2020 - P94

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P94

12/10/19

include reports for the WWFTF. It is assumed the other CSO facilities
are not part of this facility planning effort.

The current and draft NPDES permits, the status of discharge
requirements at the facility, and the pending application for a new permit.
The latest budget and Capital Improvements Plan (CIP). It is assumed the
City will provide:

Finance Committee - Agenda - 1/15/2020 - P93

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P93

EXHIBIT A

20-YEAR FACILITY PLANNING STUDY (Phase 1)
CITY OF NASHUA, NEW HAMPSHIRE
WASTEWATER TREATMENT FACILITY
I. Scope of Work

This scope of work has been prepared for assisting the City in continuing its efforts towards
addressing current and future capital planning needs. The Wastewater Facility Planning Study will

include:

e Acomprehensive review of the current and projected future flows and loads,
e An assessment of the plant hydraulic and treatment capacity,

e An assessment of the process and ancillary equipment,

Finance Committee - Agenda - 1/15/2020 - P92

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P92

Pinnette, J.R., Dwinal, C.A.,
Giggey, M.D. and Hendry,
G.E., "Design Implications of
the Biofilter Heat and
Moisture Balance",
Proceedings, 1995 USC/TRG
Conference on Biofiltration,
Los Angeles, California,
October 5-6, 1995

Pinnette, J.R., Dwinal, C.A.,
and Giggey, M.D., “Porosity
of Biofilter Media",
Proceedings, USC/TRG
Conference on Biofiitration,
Los Angeles, California,
October 5-6, 1995

Finance Committee - Agenda - 1/15/2020 - P91

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P91

Treatment Facility: What You
Should Be Doing Now,”
NEWEA Annual Conference,
Boston, Massachusetts
January 27, 2015

Peckenham, J.M., Pinnette,
J.R., and MacDonald, G., "The
Biosolids White Paper -
Making Objective Science
Accessible”, International
Water Association Specialist
Conference on Biosolids,
Moncton, New Brunswick,
June 25, 2007

Finance Committee - Agenda - 1/15/2020 - P90

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P90

Richardson, C.M., Donovan,
J.F., Durfee, D.D., and
Pinnette, J.R., "Agitated Bin
Composting From
Procurement to Start-Up",
BioCycle, November 1993

Giggey, M.D., Marcy, G.J.,
Pinnette, J.R. and St. Hillaire,
G.,"Start-Up of a Large
Advanced Septage
Treatment Facility",
Proceedings, American
Water Works Association,
December 5-8, 1993

Finance Committee - Agenda - 1/15/2020 - P89

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P89

Hankins, W.D., Richardson,
C.M, Tobiason, D.F., Eames,
F., and Pinnette, J.R.,
“Mitigating Wet Weather
and Filamentous Bacterial
Issues at the Lewistan-
Auburn WWITF", WEFTEC,
New Orleans, Louisiana,
2004

Hogan, R.S., Garcia, M.M.,
Pinnette, J.R., and Thayer,
M.W., “Energy Self
Sufficiency for New Biosolids
Digestion and Drying
Facilities," Biocycle, July 2003

Finance Committee - Agenda - 1/15/2020 - P88

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P88

Education
M.S., Civil Engineering,
University of Maine

B.S., Environmental
Engineering, Rensselaer
Polytechnic Institute

Professional Registration
Maine

Massachusetts

New Hampshire

Experience
33 Years

Joined Firm
1987

Professional Affiliations
New England Water
Environment Association

New Hampshire Water
Pollution Contro! Association

Maine Wastewater Control
Association

Water Environment
Federation

Pagination

  • Previous page ‹‹
  • Page 398
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact