Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 8/4/2021 - P57

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P57

ENGINEERING CONSTRUCTION PHASE CONTRACT Page 4 of 6
For Professional Services for Treatment Works

2. Payment to the ENGINEER for resident engineering and other special services shall be as follows:

a. Resident engineering and supporting staff (as agreed to by the OWNER and DIVISION) as described
under | (A) (2) (a) for a period of 156 working days, an amount not to exceed One Hundred Twenty-Five
Thousand Three Hundred Dollars ($125,300.00).

Finance Committee - Agenda - 8/4/2021 - P56

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P56

ENGINEERING CONSTRUCTION PHASE CONTRACT Page 3 of 6
For Professional Services for Treatment Works

Resident Inspection and Other Special Services

a. The ENGINEER agrees to provide atleast ene Registered Professional Cit Engineer a part-time Resident

Finance Committee - Agenda - 8/4/2021 - P55

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P55

ENGINEERING CONSTRUCTION PHASE CONTRACT Page 2 of 6
For Professional Services for Treatment Works

|. SERVICES TO BE PERFORMED BY THE ENGINEER

Finance Committee - Agenda - 8/4/2021 - P54

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P54

Page 1 of 2

ENGINEERING CONSTRUCTION PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY AFOMAN OF NASHUA, NEW HAMPSHIRE

This AGREEMENT made and entered into at HILLSBOROUGH County, New Hampshire, this __— day of

2021, by and between City4oewrof NASHUA, NEW HAMPSHIRE hereinafter called the OWNER, and WRIGHT-PIERCE
hereinafter called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to construct Treatment Works in accordance with the contract drawings and bidding

Finance Committee - Agenda - 8/4/2021 - P53

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P53

To:

From:

Re:

D. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: July 22, 2021

David L. Boucher, Superintendent
Wastewater Department

Pump Station Upgrades Phase II — Construction Phase Services

Finance Committee - Agenda - 8/4/2021 - P52

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P52

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (603) 594-3233

July 28, 2021
Memo #22-154

TO: Mayor Donchess
Finance Committee

SUBJECT: Construction Engineering for Phase 2 of the Pump Station Upgrade Project in the amount
not to exceed $427,600 funded from accounts 81700 Infrastructure Improvements

Finance Committee - Agenda - 8/4/2021 - P51

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P51

®
ACORD
(—

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)
05/03/2021

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

Finance Committee - Agenda - 8/4/2021 - P50

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P50

Flow Meter Installation 4 Meters $1,000.00 $4,000.00

2 | Flow Meter Operation, Maintenance, & Rental | 88 Meter | $450.00 | $39,600.00
(4 Meters x 22 Months= 88 Meter Months) Months

3 Flow Data Reduction & Presentation 88 Data $200.00 $17,600.00
(4 Meters x 22 Months= 88 Data Months) Months

_ Total: $61,200.00

VU. METHOD OF PAYMENT

Finance Committee - Agenda - 8/4/2021 - P49

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P49

D. Make arrangements to provide access to and exposure for entry those manholes within the
study area which are buried, covered or otherwise not readily accessible.

E. Provide free and legal access to all sites of work.

F. Assure the prompt clearance of major blockages or obstructions in the sewer system, if any,
should such clearance be required for performance of the work.

G. Provide the shutdown of certain pump stations, upon prior request, should it become
necessary for the satisfactory performance of the work.

Finance Committee - Agenda - 8/4/2021 - P48

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P48

FLOW METER SELECTION/INSTALLATION

Once a site has been identified the appropriate meter with any specific sensors will be installed.
The installation will consist of installing tight fitting aluminum bands with both flow depth and
velocity sensors mounted in such a way as not to obstruct flow or snag paper or other disposed
items m the flow stream.

INITIAL & SUBSEQUENT FLOW VERIFICATION

Pagination

  • Previous page ‹‹
  • Page 335
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact