Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/2/2021 - P34

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P34

Legend
? 14 Court St

! | A
eT Py 4 if, | é i |
i ae a |
| ee hoe
| | H hh | .
5 men | | i henge S ~
> - f == | | } the | / } /
° Boos pas | | | |
a ftaeese
'

CL JEPDM Area

EBEPDM Wall Coverage 1375.7 SQFT[_] wre
.) Shingle Roof 5420.9 SQFT|_|

Reeth
ee

aa a = “, t . = .) Tower Roof Shingles 421.1 SQFT[_| ad
att he a & —. Ari}

Finance Committee - Agenda - 6/2/2021 - P33

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P33

3.7

3.8

3.9

B. Seal work projecting through or mounted on roof with asphalt roofing cement
and make weather tight.

INSTALLATION- ASPHALT SHINGLES

A. Install shingles in accordance with manufacturer’s instructions for product
type and application specified.

FIELD QUALITY CONTROL
A. Field inspection will be performed under provisions of Section 01 40 00.

B. Visual inspection of the work will be provided by Owner. If conditions are
unacceptable, Owner will notify the Architect.

Finance Committee - Agenda - 6/2/2021 - P32

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P32

A. Follow shingle manufacturer's recommendations for acceptable roof
deck material

B. Broom clean deck surfaces under eave protection and underlayment
prior to their application

3.3. INSTALLATION — EAVE ICE DAM PROTECTION

A. Place eave edge and gable metal edge flashing tight with fascia boards.
Weather-lap joints 2 inches (50mm). Secure flange with nails spaced 8 inches (200
mm) on center.

Finance Committee - Agenda - 6/2/2021 - P31

By dnadmin on Mon, 11/07/2022 - 13:40
  • Read more about Finance Committee - Agenda - 6/2/2021 - P31

1. CertainTeed WinterGuard Sand
2. CertainTeed WinterGuard HT
3. CertainTeed WinterGuard Granular

2.4

2.5

2.6

PART 3
3.1

3.2

FLASHING MATERIALS

A. Sheet Flashing: ASTM A 361/A361M; 26 Gauge (0.45 mm) steel with
minimum G115/Z350 galvanized coating

B. Sheet Flashing: ASTM B 209; 0.025 (0.63mm) thick aluminum, mill
finish.

C. Sheet Flashing: ASTM B 370; cold rolled copper; 16 ounces per square
foot (0.55mm), natural finish.

Finance Committee - Agenda - 6/2/2021 - P30

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P30

manufacturers’ conditions and instructions are met by contractor.

F. Refer to manufacturer’s warranty for adjustments for commercial applications.

PART 2 PRODUCTS
2.1 MANUFACTURERS

Acceptable Manufacturer: Provide products manufactured by the CertainTeed
Corporation. Contact Sales Support Group P.O. Box 860 Valley Forge, PA 19482
Toll Free 800-233-8990

A. Substitutions: Not permitted

B. Requests for substitutions will be considered in accordance with
provisions of Section 1600

2.2 ASPHALT FIBERGLASS SHINGLES

Finance Committee - Agenda - 6/2/2021 - P29

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P29

authorities having jurisdiction.

C. Deliver shingles to site in manufacturer’s unopened labeled bundles.

Promptly verify quantities and conditions. Immediately remove damaged
products from site.

1.7 PROJECT CONDITIONS

A. Anticipate and observe environmental conditions (temperature, humidity
and moisture) within limits recommended by manufacturer for optimum
results. Do not install products under environment conditions outside
manufacturer’s absolute limits.

B. Extra Material — Furnish under provision of section 01 70 00

Finance Committee - Agenda - 6/2/2021 - P28

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P28

2. ASTM D 3161/UL 997 Wind Resistance.
3. ASTM D 3462

E. Shop Drawings: Indicate specially configured metal flashing, jointing
methods and locations, fastening methods and locations and
installation details as required by project conditions indicated.

1.5 QUALITY ASSURANCE

Finance Committee - Agenda - 6/2/2021 - P27

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P27

1.4

ASTM B 370 — Standard Specification for Copper Sheet and Strip for
Building Construction.

D. ASTM D 225 — Standard Specification for Asphalt Shingles (Organic
Felt) Surfaced with Mineral Granules.

E. ASTM D 226 — Standard Specification for Asphalt-Saturated Organic
Felt Used in Roofing and Waterproofing.

F, ASTM D 1970 — Standard Specification for Self-Adhering Polymer
Modified Bituminous Sheet Materials used as Steep Roofing
Underlayment for Ice Dam Protection.

Finance Committee - Agenda - 6/2/2021 - P26

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P26

SECTION 07 31 13

ASPHALT SHINGLE ROOFING SYSTEMS

Display hidden notes to specifier by using "Tools"/"Options"/"View'"/"Hidden Text".

PART 1 GENERAL
1.1. SECTION INCLUDES
A. Granule surfaced asphalt shingle roofing.

B. Moisture shedding underlayment, eaves, valley and ridge protection
C. Associated metal flashing

Finance Committee - Agenda - 6/2/2021 - P25

By dnadmin on Mon, 11/07/2022 - 13:39
  • Read more about Finance Committee - Agenda - 6/2/2021 - P25

3.06

3.07

3.08

3.09

Flashing over the field splice intersection.

FLASHING

A. Wall and curb flashing shall be cured EPDM membrane. Continue the deck membrane as wall flashing
where practicable. Use Pressure-Sensitive Curb Wrap when possible to flash curb units.

B. Follow manufacturer’s typical flashing procedures for all wall, curb, and penetration flashing including metal
edging/coping and roof drain applications.

WALKWAYS

Pagination

  • Previous page ‹‹
  • Page 308
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact