Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 8/3/2016 - P142

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P142

° All deductibles and_ self-insured retentions

shall be fully disclosed_in the
certificate(s) of insurance:

° If aggregate limits of less than $2,000,000 are
imposed on bodily injury and property damage,
ENGINEER. must maintain umbrella liability
insurance of at least $1.000.000. _ All
ageregates must_be fully disclosed on the
required certificate of insurance:

Finance Committee - Agenda - 8/3/2016 - P141

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P141

V. Additional Covenants

A. The ENGINEER agrees to assign in active
charge of this PROJECT for the life of the con-
tract a Project Engineer who is a permanent
employee of the ENGINEER and who a
“qualified sanitary engineer” is as defined
under the DIVISION'S ‘Rules and Regulations
for the Prequalification of Consulting Engi-
neers.” The Project Engineer shall be*

Woodard & Curran 41 Hutchins Drive. Portland, ME

* See appended resume describing the candi-
date’s qualifications for the assignment.

Finance Committee - Agenda - 8/3/2016 - P140

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P140

IL.

III.

Services to be performed by the ENGINEER

A. The ENGINEER agrees to produce a complete
and definitive Engineering Report to meet current
division requirements and to perform any and all
engineering incidental thereto. The detailed scope of
the work is as outlined in the attached Hydraulic
Needs Assessment and Evaluation of the Nashua
Wastewater Treatment Facility.

Finance Committee - Agenda - 8/3/2016 - P139

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P139

ENGINEERING REPORT PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY OF NASHUA, NEW HAMPSHIRE
This AGREEMENT made and entered into at Hillsborough County, New Hampshire, this day of

WITNESSETH:

Finance Committee - Agenda - 8/3/2016 - P138

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P138

City of Lawrence, MA- Residential Water Meter Replacement Program. Project involves the design and construction
administration of an 8,000 water meter replacement program throughout the City. The contract is the final phase to replace
all City water meters and connect to the new Fixed Network Meter Reading System. Project is funded through the SRF
Program. Responsibilities include managing project tasks and overseeing the scope, schedule, and budget.

Finance Committee - Agenda - 8/3/2016 - P137

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P137

_ Lowell Regional Water Utility, MA ~ Replacement of Tenth Street Storage Tank Contract. Project involves performing
a tank siting study to determine potential water storage tank sites in the City of Lowell, designing a replacement storage tank
for the Tenth Street Standpipe and providing bidding and construction phase engineering services. Project is funded through
the SRF and ARRA programs. Responsibilities include periorming a Tank Siting Study summary report, preparing plans and

Finance Committee - Agenda - 8/3/2016 - P136

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P136

RACHEL GILBERT, PE
PROJECT MANAGER

Professional Profile

Rachel is a Project Manager and Professional Engineer with over 15 years of experience Education

in waier, environmental and civil engineering. She has worked on a wide range of projects Bachelors, Civil Engineering,
for both municipalities and private clients, including water treatment, water distribution, Merrimack College

water supply, water planning, wastewater planning, stormwater management, and site

design. Registrations

Finance Committee - Agenda - 8/3/2016 - P135

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P135

Nashua Wastewater Treatment Facility - Water Booster Station Upgrades Project- Site Study

Finance Committee - Agenda - 8/3/2016 - P134

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P134

a. Potable water booster pumping station data including average and maximum daily
demands.

b. Potable water pressure and flow requirements including fire demands.
A c. Potable water piping configuration.
— d. Potable water backflow requirements.
e. Available pressure and grade line delivered by the City’s potable water system
«4, upstream of the existing booster pump station.
WOODARD f. WWTP process flow requirements.
& CURRAN

Finance Committee - Agenda - 8/3/2016 - P133

By dnadmin on Mon, 11/07/2022 - 09:50
  • Read more about Finance Committee - Agenda - 8/3/2016 - P133

A

a

m *®

WOODARD
G& CURRAN

COMMITMENT &c INTEGRITY 40 Shattuck Road | Suite 110 T 866.702.6371
DRIVE RESULTS Andover, Massachusetts 01810 T 978.557.8150
www.woodardcurran.com F 978.557.7948

Via Electronic Mail

June 28, 2016

Mr. William Keating

Project Engineer

Nashua Wastewater Treatment Facility
2 Sawmill Drive

Nashua, NH 03061

Re: Hydraulic Needs Assessment and Evaluation of the Nashua Wastewater Treatment Facility
RFQ0265-060316

Pagination

  • Previous page ‹‹
  • Page 1761
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact