Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/3/2016 - P136

Finance Committee - Agenda - 8/3/2016 - P136

By dnadmin on Mon, 11/07/2022 - 09:50
Document Date
Wed, 08/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2016 - 00:00
Page Number
136
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

RACHEL GILBERT, PE
PROJECT MANAGER

Professional Profile

Rachel is a Project Manager and Professional Engineer with over 15 years of experience Education

in waier, environmental and civil engineering. She has worked on a wide range of projects Bachelors, Civil Engineering,
for both municipalities and private clients, including water treatment, water distribution, Merrimack College

water supply, water planning, wastewater planning, stormwater management, and site

design. Registrations

Professional Engineer - MA, 46263
Related Experience Professional Associations
City of Lawrence, MA~ Water Infrastructure Improvements. Project Manager for the American Water Works Association
design and construction adminisiration of improvements at the Lawrence Water New England Water Works Association

Treatment Facility. The work includes security and SCADA upgrades, a partial enclosure
for the clarfiers, a redundant compressor and blower system, new raw and finished water
pumps, roofing, a mixing system in the 10 MG Low Service Reservoir and upgrades

at remote sites throughout the City. Project is funded through the SRF Program.
Responsibilities include managing project tasks for multiple engineering disciplines and
overseeing the scope, schedule, and budget.

City of Lawrence, MA - Raw Water Pumping Station Evaluation. Project involves
evaluating four raw water pumps io determine needed repairs and upgrades.
Responsibilities include coordinating onsite inspections, meetings and preparing a report
with costs for the City.

City of Marlborough, MA — Millham Water. Treatment Plant Upgrades, Project
Manager for the design and construction of upgrades at the Millham Water Treatment
Plant to comply with EPA Long Tem 2 regulations. Improvements include a new UV
disinfection system, changes in the chemical feed systems, filter media replacement, new
sump pumps, as well as upgrades to the filter, spent backwash system, finish water
pumps, clarifier blowers, HVAC system, instrumentation and SCADA, electrical system
and security. Responsibilities include managing all aspects of design and construction.

Town of North Andover, MA — Demolition of the North Pump Station. Project Manager
for the design, bid and construction oversight to demolish an abandoned pump station.
Responsibilities include managing all aspects of design and construction.

Lowell Regional Water Utility, MA—- Finish Water Pump Replacement. Project involved
acontinued effort in repairing one of the finish water pumps and VFD after the initial startup
and warranty period. Responsibilities include managing the general con- tractor and
subcontractors and coordinating with the client.

Lowell Regional Water Utility, MA - Raw Water Intake Stratification Study. Project
involves performing quarterly sampling for one year at the Raw Water Intake to deter- mine
optimal intake location based on water quality in the Merrimack River at varying levels.
Responsibilities include developing a standard operating procedure for sampling,
managing the field efforts for one year and preparing and presenting the final report and
recommendations.

P#H228700.16 | CITY OF NASHUA, NH - WATER BOOSTER STATION UPGRADES | WOODARD & CURRAN io A