  2. Finance Committee - Agenda - 8/3/2016 - P137

Finance Committee - Agenda - 8/3/2016 - P137

By dnadmin on Mon, 11/07/2022 - 09:50
Document Date
Wed, 08/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/03/2016 - 00:00
Page Number
137
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080320…

_ Lowell Regional Water Utility, MA ~ Replacement of Tenth Street Storage Tank Contract. Project involves performing
a tank siting study to determine potential water storage tank sites in the City of Lowell, designing a replacement storage tank
for the Tenth Street Standpipe and providing bidding and construction phase engineering services. Project is funded through
the SRF and ARRA programs. Responsibilities include periorming a Tank Siting Study summary report, preparing plans and
specifications for bidding, administering bidding and award process, overseeing construction, and managing scope, schedule
and budget.

Lowell Regional Water Utility, MA - Water System Improvements Contract. Project involves chemical feed system
upgrades, security system improvements, SCADA additions, installation of clearwell baffles, installation of new roof and
drain- age system, various site improvements and a new booster pumping station. Clear well remained ontine when the
baffles were installed by divers. Responsibilities include preparing plans and specifications for bidding; construction
administration and oversight and client and contractor correspondence and coordination.

Lowell Regional Water Utility, MA - Water Treatment Facility Residuals Lagoons Cleanout. Project involves designing
and construction administration of a residuals removal contract.

Responsibilities include preparing plans and specifications for bidding; construction administration and oversight and client
and contractor correspondence and coordination.

Lowell Regional Water Utility, MA — Electrical Evaluation. Project involves evaluating the power distribution at the water
treatment facility and installing power monitors to monifor incoming power from the utility company. Responsibilities include
managing the scope, schedule and budget as well as client correspondence and coordination.

City of Marlborough, MA - Millham Water Treatment Facility Long Term 2 Compliance. Project involves evaluating
options for LT2 compliance at the Millham Water Treatment Facility including monitoring combined filter effluent, installing
additional filtration systems, installing a UV disinfection system and installing a chlorine dioxide system. Responsibilities
include preliminary design of a chlorine dioxide system with schematic plans and construction cost estimates with a
summary report.

Town of Westford, MA — Perchlorate Removal System Media Replacement. Project involves developing technical
specifications fo replace resin from two of the piant’s four perchlorate removal vessels. Responsibilities include evaluating
the existing piping configuration and original O&M information, communicating with resin manufacturers, preparing
specifications for bidding; construction administration and oversight and client and contractor correspondence and
coordination.

Town of Millis, MA— Rehabilitation of Farm Street Standpipe. Project includes design, bid and construction oversight fo
rehabilitate a 940,000-gallon steel tank. Work involved abrasive blasting, interior and exterior coating, vent modifications
and installation of a hydrodynamic mixing system. Responsibilities include managing all aspects of design and construction.

Town of Ashland, MA - Cedar Street Standpipe Mixing System. Project involves installing a hydrodynamic mixing system
in an existing 2.5-million-gallon standpipe storage tank. Responsibilities include preparing plans and specifications for
bidding; construction administration and oversight and client and contractor correspondence and coordination.

City of Lawrence, MA- Water Treatment Facility Security System. Project involves the design and construction
administration of a new security system at the Water Treatment Facility with video surveillance and software. Project is
funded through the SRF Program, Responsibilities include managing project tasks and overseeing the scope, schedule, and
budget.

City of Lawrence, MA- Water Treatment Plant Photovoltaic System Installation. Project involves the design and
construction administration of a 300kW photovoltaic system at the Water Treatment Facility. Project is funded through the
SRF Program. Responsibilities include man- aging project tasks and overseeing the scope, schedule, and budget.