Finance Committee - Agenda - 3/17/2021 - P527
SECTION 02200
EARTHWORK
PART 1 - GENERAL
11 SCOPE OF WORK
A.
CONTRACTOR shall provide all labor, materials, equipment, and incidentals
necessary to excavate and backfill trenches for the landfill gas collection and
control system as shown on the Drawings and specified herein, including, but
not limited to: excavation, disposal, and/or replacement of waste; placement
and compaction of earth materials; and grading.
PART 2 - PRODUCTS
2.1 GENERAL
A.