SECTION 01450
QUALITY CONTROL
PART 1 - GENERAL
1.1 GENERAL QUALITY CONTROL
A.
CONTRACTOR - shall maintain quality control over the _ suppliers,
manufacturers, products, services, site conditions, and workmanship to
produce Work of specified quality.
CONTRACTOR shall comply with industry standards except when more
restrictive tolerances or specified requirements indicate more rigid standards
or more precise workmanship.
CONTRACTOR shall account for quality control practices in his/her bid pricing
and schedule. No adjustments to the Contract price or schedule will be made
for CONTRACTOR’s failure to provide the requisite quality control.
12 OBSERVATION AND TESTING
A.
The Work shall, at all times, be subject to the observation of OWNER and/or
ENGINEER. Observation or non-observation of OWNER and/or ENGINEER
shall not relieve CONTRACTOR from his/her contractual obligation to furnish
work and material as required, and properly complete the Work in accordance
with the Drawings and Specifications. If OWNER or ENGINEER considers that
the Work is not properly accomplished, then he/she may condemn or reject all
or any part of the Work and any materials or equipment incorporated in it. If
any material, equipment, or work is condemned or rejected by OWNER or
ENGINEER, then CONTRACTOR shall bear all expenses for removal and proper
replacement of such material, equipment, or work, and replacing any Work by
others that is adversely affected by removal and proper replacement of
improper Work by CONTRACTOR.
OWNER shall retain ENGINEER to perform limited construction observation.
These services will be performed in accordance with the requirements of
governing authorities to establish whether the Work is completed in
accordance with the Drawings and Specifications.
CONTRACTOR shall cooperate with ENGINEER during all testing and sampling
activities and furnish tools, equipment, samples of materials, and assistance as
requested.
CONTRACTOR shall allow ENGINEER ample time and opportunity for observe
the materials used in the Work. CONTRACTOR shall advise ENGINEER
promptly upon placing orders for materials so that arrangements may be
SANBORN HEAD