Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

panel and panel board with connections to other equipment where specifically
indicated and noted.

C. Bonding conductors shall be continuous where possible. Where splices are
required, provide compression connectors of approved pattern. Insulate
connectors to equivalent thickness of conductors.

Finance Committee - Agenda - 11/15/2017 - P323

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P323

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

1. Provide product data for all grounding equipment and appurtenances,
including but not limited to; wires, connectors, lugs, clamps, ground rods,
bonding jumpers and accessories.

PART 2-— PRODUCTS

2.01 GENERAL

A.

Provide electrical grounding system with assembly of materials required for
complete installation including wires/cables, connectors, lugs, clamps, ground
rods, bonding jumpers and accessories.

Finance Committee - Agenda - 11/15/2017 - P322

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P322

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 26 05 26

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1-— GENERAL

1.01 DESCRIPTION OF WORK

A.

Provide all labor, tools, equipment, materials and appurtenances necessary to
furnish and install grounding materials in accordance with the Drawings and as
specified herein. This section includes solid grounding of electrical systems and
equipment.

1.02 REFERENCES

A.

Finance Committee - Agenda - 11/15/2017 - P321

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P321

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

F. Any cable which fails the insulation tests or which fails when tested under full
load conditions shall be replaced with new cable for the full length and retested at
no additional cost to Owner.

G. The below grade service or feeder splice shall be water immersion Megger tested.
Each splice shall be immersed in a grounded water immersion bath for 24
continuous hours prior to and during the test. Criteria for failure shall be as
described for cable above.

Finance Committee - Agenda - 11/15/2017 - P320

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P320

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

J.

The number of conductors shown on the Drawings is not necessarily the correct
number required. As many conductors as are required in each case shall be
installed. In general, grounding conductors are not scheduled.

In general, wiring for the following systems shall be installed in separate conduits.
Do not mix categories in a single raceway.

Finance Committee - Agenda - 11/15/2017 - P319

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P319

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

approved. Control and metering conductors shall be installed without
splices.

5. All splices shall be made only by specific permission of the Engineer and
then only in manholes or pull boxes and shall be sealed watertight with a
heat-shrunk insulation.

Finance Committee - Agenda - 11/15/2017 - P318

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P318

Project Number: 228730
Issue Date: August 2017

3.

WWTE SCADA Upgrades
Nashua, NH

Provide factory applied nylon or polyvinyl chloride (PVC) external jackets
on wires and cables for pulls in raceways over 100 feet in length, for pulls
in raceways with more than three equivalent 90 degree bends, for pulls in
conduits underground or under slabs on grade, and where indicated.

B. Service & Distribution Wiring

1.

2.

3.

4.

Finance Committee - Agenda - 11/15/2017 - P317

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P317

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

2. WC-7 Cross Linked Thermosetting Polyethylene Insulated Wire and Cable
for the Transmission and Distribution of Electrical Energy

3. WC-8 Ethylene Propylene Rubber Insulated Wire and Cable for the
Transmission and Distribution of Electrical Energy

E. INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)

COMPLIANCE
1. Standard 82 Test Procedure for Impulse Voltage Tests on Insulated
Conductors

1.04 SUBMITTALS

Finance Committee - Agenda - 11/15/2017 - P316

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P316

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

SECTION 26 05 19

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 —- GENERAL
1.01 DESCRIPTION OF WORK

A. The Contractor shall provide the labor, tools, equipment, and materials necessary
to install wires, cables, and connectors in accordance with the plans and as
specified herein.

B. This section includes wires, cables, and connectors for power, lighting, signal,
control, communications and related systems rated 600 volts and less.

Finance Committee - Agenda - 11/15/2017 - P315

By dnadmin on Mon, 11/07/2022 - 10:19
  • Read more about Finance Committee - Agenda - 11/15/2017 - P315

Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH

3.06 CLEANING

A. When all Work is completed and has been tested and accepted by the Owner’s
Representative, the Contractor shall clean all light fixtures, equipment, and
exposed surfaces that have been directly affected by this Work.

END OF SECTION

COMMON WORK RESULTS FOR ELECTRICAL
WOODARD & CURRAN 26 05 00-14