Finance Committee - Agenda - 7/19/2017 - P34
[eso‘bors
BH JBQUOD 12}01]
[eso‘bors
BH JBQUOD 12}01]
c. SUBCONT RACTS
ESTIMATED
COsT
Geotechnical Engineering (pump stations & Northgate force main) $15,000
Soil Borings (pump stations structural designs) $15,000
Radio Propagation Study $1,725
SUBCONT RACTS SUBTOTAL: $31,725
d. OTHER (Specify categories) ESTIMATED
COST
Document Reproduction $6,000
Shipping $500
OTHER SUBTOTAL: $6,500
e, OTHER DIRECT COSTS TOTAL: $40,580
10. TOTAL ESTIMATED COST $423,297
11. PROFIT (10% of Direct and Indirect Labor)* $38,272
12. TOTAL PRICE $461,569
COST OR PRICE S UMMARY FORMAT FOR SUBAGREEMENTS UNDER NH SAG & SRF
Form Approved
DES 02/06
PART I - GENERAL
1. GRANTEE / LOANEE
City of Nashua, New Hampshire
2. GRANT/LOAN NO.
SRF No. CS-330158-27
3. NAME OF CONTRACTOR OR SUBCONTRACTOR
Woodard & Curran, Inc.
4. DATE OF PROPOSAL
Monday, June 05, 2017
5. ADDRESS OF CONTRACTOR OR SUBCONTRACTOR (Include ZIP)
6. TYPE OF SERVICE TO BE FURNISHED
Role
Staff
Designer
Carlos Barzola
Designer
Kimberly Carpenter
Senior Designer
Dean Boudreau
Senior Designer
Brendhan McDevitt
Senior Technical Advisor(QA/QC)
Ken Carlson
m
eer a
Administrative
Debra Foshay
WOODARD
& CURRAN
+
ss
= i,
=
WOODARD
& CURRAN
FINAL DESIGN - FEE SUMMARY
As outlined in the NHDES price summary forms included with the Nashua Pump Stations Final Design
and Bid Phase Contract, the total cost for final design and bid phase engineering services is $461,569.
&
A
>
WOODARD
S& CURRAN
regularly scheduled meetings with city staff as appropriate to discuss project progress and issues
related to design of the project.
Final Design Engineering & Bid Documents
Pump station and force main upgrades will be designed to the TR-16 industry standards capable of
accommodating the design flows from the contributing sewershed area. Woodard & Curran will work
with the City to specify pump station components interchangeable to current City standards.
a
A
WOODARD
&: CURRAN
Between May 1st — 3" soil borings were completed by New England Boring Contractors within
the Nashua River as part of the Northgate force main replacement preliminary design.
PROPOSED FINAL DESIGN
A
~ A
WOODARD
& CURRAN
COMMITMENT & INTEGRITY
DRIVE RESULTS
ATTACHMENT NO. 1 EXHIBIT A
FINAL DESIGN
PUMP STATIONS UPGRADE PROJECT
NASHUA, NH
BACKGROUND
COST OR PRICE SUMMARY FORMAT FOR SUBAGREEMENTS UNDER NH SAG & SRF
Form Approved
DES 02/06
PART I - GENERAL
1. GRANTEE / LOANEE
City of Nashua, New Hampshire
2. GRANT/LOAN NO.
CS-330158-27
3. NAME OF CONTRACTOR OR SUBCONTRACTOR
Woodard & Curran, Inc.
4. DATE OF PROPOSAL
Monday June 5, 2017
5. ADDRESS OF CONTRACTOR OR SUBCONTRACTOR (Include ZIP)
41 Hutchins Drive Portland, Maine 04102
6. TYPE OF SERVICE TO BE FURNISHED
PART II - COST SUMMARY
ENGINEERING DESIGN PHASE CONTRACT
For Professional Services for Treatment Works
IN WITNESS WHEREOF, the parties hereto have
affixed their hand and seals at Hillsborough County,
New Hampshire, the day, month, and year first above
written.
ENGINEER:
By:
(Authorized Representative*)
Date:
OWNER:
By:
(Authorized Representative*)
Date:
APPROVED: **
DEPARTMENT OF ENVIRONMENTAL SERVICES
Water Division
By:
(Authorized Representative)
Date: