Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P623

Finance Committee - Agenda - 6/7/2017 - P623

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
623
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

1.2

1.3

16050-2
BASIC MATERIALS AND METHODS

electrical wiring. If, after installation of any equipment, piping, ducts, conduit, etc.,
it is determined that ample maintenance and passage space has not been provided,
the work shall be rearranged and/or furnished with other equipment as required to
provide this space at no additional cost to the Engineer. The Contractor shall review
the drawings for all other trades to determine any potential interferences and identify
and coordinate with those with other trades.

When there is a conflict or coordination issue, or if additional information is
necessary for the contractor to proceed with the intended work, a Request for
Information (RFI) form shall be submitted through the General Contractor to the
Engineer. The specific issue shall be described in the RFI and shall be sent to the
Engineer for review and a response shall be provided in an appropriate time period.
RFI form shall be available via the General Contractor through the Engineer as
required for this contract. This process shall be used as part of the work of this
contract.

QUALITY ASSURANCE

A.

In General, the workmanship of the electrical installation shall be as described in the
N.E.C.A. Electrical Design Guidelines. All methods of construction, details of
workmanship, etc. that are not specifically described therein or indicated in the
Contract Documents, shall be subject to the control and approval of the Engineer.
Equipment and materials shall be of the quality and manufacture indicated in their
respective sections of the Specifications.

Work determined by the Engineer to be unsatisfactory according to industry
standards shall be redone at the Contractor's expense, with no additional
compensation.

All efforts shall be made in the location and installations of all raceways and
equipment for a neat, logical, and safe installation as it pertains to personnel and
operations.

An electrical conduit and associated electrical devices, etc., shall be installed
concealed wherever possible in order to provide for a clean and limited amount of
exposed conduit runs. Coordinate all work with the Engineer prior to performing
this work.

SUBMITTALS TO THE ENGINEER

A.

The contractor shall be responsible to submit a complete list of conduit type to be
used for all locations of the project. A Conduit Layout Plan shall be submitted as a
shop drawing with the following:

1. Shall include a column for exposed and concealed conduit heading. Mark up
each location with the type of conduit to be used for the respective space in the
appropriate heading of exposed and concealed installation.

2. Provide detailed drawings indicating intended routing and combination of
conductors. Refer to section 16010 for additional requirements.

Submit a shop drawing for the following equipment, materials, products, etc.:

1. Conduit, Raceway and Tubing.

2. Conductors and Cable
3. Wiring Devices

13089K