Finance Committee - Agenda - 6/7/2017 - P652
WRIGHT-PIERCE
Engineering a Better Environment
WRIGHT-PIERCE
Engineering a Better Environment
PSHM GAT m MI CGC mem CUCL Cys
Notify building personnel prior to making any alterations to the roofing membrane.
Roof repairs must be made by an authorized contractor.
CMU RICORSOR MUM UEM tC elites
Protect the Roof! Installing Solar?
e Report any spills on the roof. e JM must be notified before installing a solar
system on any roof with a JM guarantee.
SPEEA a ANCA m ELT!
TMU RAC RUN lel Case
adverse conditions.
e Care should be taken not to damage the
MOU Mee
OMT Cw MBM Le ele
um
Johns Manville
Building Owner:
City of Nashua
9 Riverside Street
Nashua, NH 03062
Building Name:
Nashua Wastewater Treatment Facility
2 Sawmill Road
Nashua, NH 03060
Approved Roofing Contractor:
ROCKWELL ROOFING INC
PO BOX 479
LEOMINSTER, MA 01453
Peak Advantage Guarantee
PEAK AA OVANTAGE
Guarantee Number: BNE107300188
Expiration Date: December 18, 2030
Job Name: Nashua Wastewater Treatment
Facility
Date of Completion: December 18, 2015
APPENDIX A
Existing John Manville Roof Warranty
16950-4
MEGGER TEST RESULTS
Project: Temperature:
Date: Weather:
Location: Test Equipment:
Equipment/feeder Under Test: Start Time: End Time:
Test Equipment: Make : Serial No.: Test Voltage:
05min 1 min 2 min 3 min 4 min 5 min 6 min 7 min 8 min 9min 10min PI.
Phase A-Gnd.
Phase B-Gnd.
Phase C-Gnd.
Phase A-PhaseB
Phase A-PhaseC
Phase B-PhaseC
16950-3
TESTING ELECTRICAL SYSTEMS AND START-UP
fails to function properly, rectify such defects or inadequacies and make a final
demonstration as directed by the Engineer.
Provide the services of authorized manufacturers’ representatives to instruct the
Owner's representatives in the proper operation of each partial or complete system
installed under this Contract.
1.4
—_
Zr
16950-2
TESTING ELECTRICAL SYSTEMS AND START-UP
3. Check for tools inside equipment or enclosures. All screw, bolt, and terminal
connections shall be checked for tightness as specified by the equipment
manufacturer.
4. Check the bearings of all rotating electrical apparatus and, if required, have
supplier fill with the grease or oil as recommended by the manufacturers.
16950-1
SECTION 16950
TESTING ELECTRICAL SYSTEMS AND START-UP
PART 1 - GENERAL
1.1
1.2
1.3
DESCRIPTION
A. Test and demonstrate, to the satisfaction of the Engineer, all electrical devices in
accordance with the following requirements. All testing and checkout of equipment
specified under this Section shall be performed by the electrical contractor.
16900-4
CONTROLS
2. Atleast four spare sets of clips shall be provided on each fuse block and shall
be labeled “SPARE”.
3. Fuse block switches shall be din rail mounted.
4. Fuse blocks shall be Littlefuse Omni-block, Bussmann, or considered equal.
Terminal Strips