Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P650

Finance Committee - Agenda - 6/7/2017 - P650

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
650
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

um

Johns Manville

Building Owner:
City of Nashua
9 Riverside Street
Nashua, NH 03062

Building Name:
Nashua Wastewater Treatment Facility
2 Sawmill Road
Nashua, NH 03060

Approved Roofing Contractor:
ROCKWELL ROOFING INC

PO BOX 479
LEOMINSTER, MA 01453

Peak Advantage Guarantee

PEAK AA OVANTAGE

Guarantee Number: BNE107300188

Expiration Date: December 18, 2030
Job Name: Nashua Wastewater Treatment
Facility

Date of Completion: December 18, 2015

Terms & Maximum Monetary Obligation to Maintain a Watertight Roofing System.

Years: 15 Year
Coverage:

$ No Dollar Limit

The components of the Roofing System covered by this Guarantee are:

Total Squares: 347

Membrane Insulation Type
Sec. _Sqs. Roof Type Spec. Layer 1 Layer 2 Layer 3 Cover Board
1 20 EPDM SE6A ENRGY 3
2 36 EPDM SE6A Invinsa
3 74 EPDM SE6A Invinsa
4 153 EPDM SE6A ENRGY 3 ENRGY 3
5 64 EPDM SE6A ENRGY 3
Accessories: Type Product Name Quantity
Expand-O-Flash (1) Style: 0 lin. ft.
Expand-O-Flash (2) Style: 0 lin. ft.
Expand-O-Flash (3) Style: 0 lin. ft.
Drains (1) Style: 0 ea.
Drains (2) Style: 0 ea.
Vents Style: 0 ea.
Fascia Style: 0 lin. ft.
Copings Style: 0 lin. ft.
Gravel Stop Style: 0 lin. ft.
Skylight System 0 ea.

These Johns Manville Guaranteed components are referred to above as the “Roofing System” and ALL OTHER COMPONENTS OF THE OWNER'S BUILDING ARE EXCLUDED
FROM THE TERMS OF THIS GUARANTEE, including any amendments thereto.

Johns Manville* guarantees to the original Building Owner that during the Term commencing with the Date of Completion {as defined above), JM will pay for the materials and labor
reasonably required in Johns Manville's sole and absolute discretion to repair the Roofing System to retum it to a watertight condition if leaks occur due to: ordinary wear and tear,
or deficiencies in any or all of the Johns Manville component materials of the Roofing System, or workmanship deficiencies only to the extent they arise solely out of the application
of the Roofing System. Non-leaking blisters are specifically excluded from coverage. Should any investigation or inspection reveal the cause of a reported leak to be outside the
scope of coverage under this Guarantee, then all such investigation and inspection costs shall be bome solely by the Building Owner.

Page Image
Finance Committee - Agenda - 6/7/2017 - P650

Footer menu

  • Contact