Document Date
Meeting Description
Document Type
Meeting Date
Page Number
651
PSHM GAT m MI CGC mem CUCL Cys
Notify building personnel prior to making any alterations to the roofing membrane.
Roof repairs must be made by an authorized contractor.
CMU RICORSOR MUM UEM tC elites
Protect the Roof! Installing Solar?
e Report any spills on the roof. e JM must be notified before installing a solar
system on any roof with a JM guarantee.
SPEEA a ANCA m ELT!
TMU RAC RUN lel Case
adverse conditions.
e Care should be taken not to damage the
MOU Mee
OMT Cw MBM Le ele
Jj f Johns Manville Roofing Contractor:
A4¥ (800) 922-5922
Johns Manville
RS-7292 2-13
Page Image