Finance Committee - Agenda - 5/17/2017 - P286

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P286

3. Implementation

A.

Prior to commencement of work, the Contractor shall meet with representatives of the
Engineer to devdoo mutud understandings rddive to compliance of the environmenta
protection program.

The Contractor shdl submit for aoprova six sets of deals and literature fully describing
environmenta protection methods to be enployed in carrying out construction activities within
100 feet of wetlands or across areas desi gnated as wetlands.

4. Areaof Construction Activity

Finance Committee - Agenda - 5/17/2017 - P285

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P285

SECTION 01570

ENVIRONMENTAL PROTECTION

Description

Notification

Implementation

Areaof Construction Activity

Protection of Water Resources
Construction in Areas Designated as Wetlands on the Drawings
Protecting and Minimizing Exposed Areas
Location of Storage Areas

Protection of Landscape

10. Cleering and Grubbing

11. Dischargeof Dewatering Operations

12. Dust Control

13. Seperation and Replacement of Topsoil

14. Bded Straw

15. Silt Fence

1. Description

Finance Committee - Agenda - 5/17/2017 - P284

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P284

SECTION 01550

TRAFFIC CONTROL AND SIGNAGE

PART 1 - GENERAL

1.01

1.02

WORK INCLUDED:
This Section covers furnishing and installing traffic control signs and other devices.
SYSTEM DESCRIPTION:
The Contractor shall furnish and install all construction signs deemed necessary by and in

accordance with the latest edition of Part VI of the Manual on Uniform Traffic Control
Deyices (MUTCD) as published by the U.S. Department of Transportation.

PART 2 - PRODUCTS

2.01

TRAFFIC WARNING AND REGULATING DEVICES:

Finance Committee - Agenda - 5/17/2017 - P283

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P283

All television inspection shall be recorded on VMS format system that utilitizes ¥2-inch
recording videotapes and the SLR mode. The Contractor shall provide two (2) original and
labeled copies of each videotape to the Owner, at no additional cost, at the end of the
project. All VCR videotapes shall have a typed label listing tape number, date work
was performed, “City of Nashua’, contract number and sub area designation. Each tape
shall be referenced in a logbook that details upstream and downstream sub area and

Finance Committee - Agenda - 5/17/2017 - P282

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P282

SECTION 01331

DOCUMENTATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. This section covers the requirements for documentation to be furnished by the

Contractor on this project.

1.02 RELATED WORK:

A. Section 02441, CLEANING, TELEVISION INSPECTION, & TESTING OF NEW
PIPELINES

1.03 DOCUMENTATION:

Finance Committee - Agenda - 5/17/2017 - P281

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P281

techniques of construction; coordinating his work with that of all other trades; and
performing his work in a safe and satisfactory manner. The review of the shop drawings is
general and shall not relieve the Contractor of the responsibility for details of design,
dimensions, code compliance, etc., necessary for interfacing with other components, proper
fitting and construction of the work required by the Contract and for achieving the specified
performance.

Finance Committee - Agenda - 5/17/2017 - P280

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P280

SECTION 01330

SUBMITTALS

SHOP AND WORKING DRAWINGS

A.

As required by the General Conditions, Contractor shall submit a schedule of shop and
working drawing submittals.

In accordance with the accepted schedule, the Contractor shall submit promptly to the
Engineer, through its authorized resident representative at the job site, or by mail, three
(3) copies each of shop or working drawings required as noted in the specifications, of
equipment, structural details and materials fabricated especially for this Contract.

Finance Committee - Agenda - 5/17/2017 - P279

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P279

A contingency for coordination with the Railroad company at Temple St is
provided to cover such costs as Railroad Flaggers. This contingency is provided
as an allowance in Item 11.

NOTE: THE CONTINGENCY DOES NOT COVER THE COSTS
ASSOCIATED WITH THE RAILROAD INSURANCE REQUIRMENTS.
THOSE ARE COVERED UNDER ITEM 1K(1) AS OUTLINED ABOVE.

A contingency for contaminated soil excavation and disposal is provided by the
allowance Item 11a.

Finance Committee - Agenda - 5/17/2017 - P278

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P278

2.13 ASPHALT COST ADJUSTMENT

A. This item is used when the “NE Average” monthly price for asphalt cement as

2.14

2.15

furnished by the NHDOT Bureau of Materials and Research differs from the base
price contained in the proposal. The monthly price posted by NHDOT is
available in the following web page:

http://www.nh.gov/dot/org/projectdevelopment/construction/documents/Mon
thlyFuelPricesImperial.pdf

Finance Committee - Agenda - 5/17/2017 - P277

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P277

3. Signage not to be separately measured for payment, but shall be considered

incidental to this item.

4. The work shall be paid for per UNIT as Item 8c.

2.09 ASBESTOS ABATEMENT (ALLOWANCE PROVDIED)

A.

2.10

2.11

2.12

ALLOWANCE FOR ADDITIONAL COST FOR REMOVAL OF ASBESTOS-
CONTAINING MATERIAL