Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P285

Finance Committee - Agenda - 5/17/2017 - P285

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
285
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

SECTION 01570

ENVIRONMENTAL PROTECTION

Description

Notification

Implementation

Areaof Construction Activity

Protection of Water Resources
Construction in Areas Designated as Wetlands on the Drawings
Protecting and Minimizing Exposed Areas
Location of Storage Areas

Protection of Landscape

10. Cleering and Grubbing

11. Dischargeof Dewatering Operations

12. Dust Control

13. Seperation and Replacement of Topsoil

14. Bded Straw

15. Silt Fence

1. Description

OAONDWABRWN >

A. The work covered by this section of the specifications consists of furnishing all labor,
materias, tools and equipment and performing al work required for the prevention of
environmental pollution during and as a result of construction operations under this
contract.

B. Therequirenents set forth in this section of the specifications apply to roadway
reconstruction areas, cross-country areas, river and stream crossings, and construction in and
adjacent to welands, unless otherwise specifically stated.

2. Notification

The Engineer will notify the Contractor in writing of any norm-compliance with the foregoing
provisions. The Contractor shall, after receipt of such notice immediately take corrective action.
Such notice when delivered to the Contractor or his authorized representative at the site of the
work, shal be deemed sufficient for the purpose. If the Contractor fals to act promptly, the
Engineer may order stoppage of all or part of the work until satisfactory corrective action has
been taken. No clam for an extension of time or for excess costs or damage incurred by the
Contractor as a result of time lost due to any stop work orders shall be made unless it was later
determined that the Contractor was in compliance.

01570-1

Page Image
Finance Committee - Agenda - 5/17/2017 - P285

Footer menu

  • Contact