Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P277

Finance Committee - Agenda - 5/17/2017 - P277

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
277
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

3. Signage not to be separately measured for payment, but shall be considered

incidental to this item.

4. The work shall be paid for per UNIT as Item 8c.

2.09 ASBESTOS ABATEMENT (ALLOWANCE PROVDIED)

A.

2.10

2.11

2.12

ALLOWANCE FOR ADDITIONAL COST FOR REMOVAL OF ASBESTOS-
CONTAINING MATERIAL

Should asbestos material be found in the trench area other than asbestos cement
pipe, the Contractor shall immediately call the project Engineer to make a
decision on how the material shall be removed. Measurement for removal of such
asbestos-containing materials encountered shall be measured by accepted unit
quantities for such work as established under the General Conditions and agreed
to by the Owner and Engineer.

Payment for handling, removal and disposal of asbestos-containing materials will
be for the unit quantities and prices above and shall be full compensation for
furnishing all labor, materials, services and equipment required to excavate,
pump, sample, test, store, treat and/or dispose of asbestos-containing materials
and conform to all requirements as specified in Section 02111. Payments shall be
based on the unit quantities and costs for the work performed and measured under
prevailing rates as established under the General Conditions and as agreed to by
Owner and Engineer. Waste Shipment Records from the disposal facility shall be
included in each payment request. The City may elect to receive such materials at
the City landfill without additional charge.

The work shall be paid at an agreed upon price for the work involved and paid
for using the allowance provided in Item 9c.

SEWER PIPE TELEVISION INSPECTION AND VIDEO TAPES:

Sewer pipe Television inspection performed as specified herein and video tapes
provided to the Owner shall not be separately measured for payment but shall be
considered incidental to the project.

WARRANTY INSPECTION:

All warranty inspections and related work shall not be separately measured for
payment but shall be considered incidental to the project.

WATER FOR ROADWAY DUST CONTROL

Water for roadway dust control shall not be separately measured for payment but
shall be considered incidental to the project.