Finance Committee - Agenda - 3/15/2017 - P92
£ SUVLIEG £10z MaBNDRG <aLvO at iat = =
. iy 7m PLT joa Tee ;
apnea 1396 TIVM 49018 SLSYONOD BESNWHNIAIS "2 TOR SEG THAT RTOS CENCE AND
ceacaa sme oa Tey =~ = | VaH i NYOINVS
£ SUVLIEG £10z MaBNDRG <aLvO at iat = =
. iy 7m PLT joa Tee ;
apnea 1396 TIVM 49018 SLSYONOD BESNWHNIAIS "2 TOR SEG THAT RTOS CENCE AND
ceacaa sme oa Tey =~ = | VaH i NYOINVS
Arte LY Oh 44) Weld. pls
ef Bahai he PPA
. my
“Mega batt)
ae “nym AO
3 agya analy
pM Gal adid foe
ag aoe of, ‘ .
Hist Ye, a ONL wae “okt
tite wey”.
Layo
aes”
TRAM BNL ANA. aes
ah Duis Io.
fue nei? WO | Lehe® ACT GO fe
an Oct as oa Algyfleo Cavan
OU dS , . “
"ye old ae : “
“4
Toe
OR
at
st
= .
Bee = ease
ad “ee
oa:
Popor of
be hove es cd
os
er =
alet-ezz (c09) xvd oo6T-sz2 (£09)
TOGO AUIHSdNVH AN ‘dYOaNOD
‘LAALS AMINNOA 02
| A AA
Se re]
OREO
Taw Tam |
eviweenae
y
SliviaQ WALSAS 531 $133HS ¥
STWLAG TIVM H501d SLSYONOO rFESIBaHS ¥
3d0'd ONV NVId 7133aHS ¥
NV1d TIVM AD0718
SLIYONOD ONY SNOLLIGNOD ONILSIXS bISSHS V7
XEON LSSHS (Lioz ‘NMC dasnad) &
SUONIMVEC NOLLONYLSNOO TIVM XOOTE SLSYONOO
City of Nashua, NH
Liability Insurance Requirements
July 1, 2015
The VENDOR must maintain the following lines of coverage and policy limits for the duration of the
contract. Any subcontractors used by the VENDOR are subject to the same coverage and limits and is a
subcontractor to the VENDOR and not the OWNER. It is the responsibility of the VENDOR to update
Certificates of Insurance during the term of the contract.
> General Liability:
$1,000,000 per Occurrence
$2,000,000 Aggregate
(City of Nashua Additional Insured)
Bid Item No. 5 Landfill Gas Conveyance Pipe
BID ITEM DEFINITIONS
Concrete Block Wall
Four Hills Landfill
Nashua, New Hampshire
The following describes the Bid Items and the mechanism for payment to CONTRACTOR for each
completed Bid Item. All incidental costs such as overhead, profit, and insurance shall be factored into
the Bid Item unit prices. All measurements are based on plan view areas and lengths without
consideration of slope. Bidders should factor slope adjustments into their Bid Item unit prices.
Bid Item No. 1 Mobilization /Demobilization
Schedule of Values- Bid Items
2017 Concrete Block Residential Setback Wall Construction
Four Hills Landfill
Nashua, New Hampshire
CHANGE ORDER
No. 3
PROJECT: 2014 Four Hills Landfill Residential Setback Barrier Wall Construction
OWNER’S CONTRACT NO: IFB0593-050514
DATE OF ISSUANCE: March 16, 2017 EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH
OWNER’s Purchase Order NO.: TBD
CONTRACTOR: Northeast Earth Mechanics, Inc.
ENGINEER; «Sanborn Head Associates
You are directed to make the following changes in the Contract Documents: Description, Purpose of Change Order,
and Justification. Attachments: (List Documents supporting change)