Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/15/2017 - P85

Finance Committee - Agenda - 3/15/2017 - P85

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

BID ITEM DEFINITIONS

Concrete Block Wall
Four Hills Landfill
Nashua, New Hampshire

The following describes the Bid Items and the mechanism for payment to CONTRACTOR for each
completed Bid Item. All incidental costs such as overhead, profit, and insurance shall be factored into
the Bid Item unit prices. All measurements are based on plan view areas and lengths without
consideration of slope. Bidders should factor slope adjustments into their Bid Item unit prices.

Bid Item No. 1 Mobilization /Demobilization

This item requires that CONTRACTOR furnish and/or deliver to the job site all labor, materials,
resources, and temporary support facilities, including but not limited to portable sanitary facilities,
and equipment necessary to perform the required Work. In addition, CONTRACTOR shall prepare
all required written plans and schedules, including but not limited to: Site-Specific Health and Safety
Plan, initial and progress construction schedules, and subcontractor work plans. One half of this
item will be paid as part of the initial progress payment after temporary support facilities are set up
and construction equipment and materials have been delivered to the Site. The remainder will be
paid for demobilization after the Work has been deemed substantially complete, CONTRACTOR has
provided Record Documents in accordance with the requirements of the Specifications, and
CONTRACTOR has demobilized from the Site, which shall include removal of all materials, resources,
equipment, temporary support facilities, and all remaining construction debris at the completion of
the work.

Bid Item No. 2 Earthwork

This Bid Item includes all labor, materials, equipment tools, and apparatus as necessary, to place
Screened Till foundation for the east concrete block wall as shown on the Drawings. This item
includes compaction of the material as specified on the Drawings. This item will be paid on a unit
basis per linear foot of Screened Till placement completed. OWNER shall furnish till (unscreened)
from on-site stockpile.

Bid {tem No. 3 Furnish and Install Concrete Blocks

This Bid Item includes all labor, materials, equipment, tools, and apparatus as necessary, to furnish
and install concrete blocks as shown on the Drawings. CONTRACTOR shall be responsible to
provide equipment and labor necessary to transport and unload concrete blocks at the site.
CONTRACTOR shall be responsible for placing and compacting Common Borrow Fill along the west
side of the west concrete block wall and on the east side of the east concrete block wall as shown on
the Drawings. OWNER will supply the Common Borrow Fill material. This item will be paid on
a unit basis per linear foot of wall constructed as specified on the Drawings.

Bid Item No. 4 Supply and Install Wall Lining
This item includes all labor, materials, equipment, tools, and apparatus as necessary, to furnish and
install 60-mil! HDPE Smooth Geomembrane and 10 ounce per square yard nonwoven geotextile

as specified on the Drawings. This item will be paid on a unit basis per linear foot of wall
constructed as specified on the Drawings.

Page 2 af 4

Page Image
Finance Committee - Agenda - 3/15/2017 - P85

Footer menu

  • Contact