Schedule of Values- Bid Items
2017 Concrete Block Residential Setback Wall Construction
Four Hills Landfill
Nashua, New Hampshire
Estimated «rte te Dut Extended
item . Bid Unit Prices .
No. Construction Items Quantity ($/units) Prices
(w/units) (3)
1 |Mobilization/Demobilization 1 LS | $20,600.00 $20,600.00
2 Earthwork - Furnish and Install 320 LF
Screened Till for East Wall $66.00 $21,120.00
3 Furnish and Install Concrete Blocks
a. Part 1 - East Wall Landfill Base to 310 LF
Elevation 258 ft. $175.00 $54,250.00
b. Part 2- West Wall Elevation 260 301 | LF
ft. to Elevation 268 ft $139.00 $111,339.00
4 {Furnish and Install Wall Lining | :
a. Part 1- East Wall Landfill Base to 310 LF
Elevation 258 ft. $58.00 $17,980.00
b. Part 2 - West Wall Elevation 260 801 LF
ft. to Elevation 268 ft. $43.00 $34,443.00
5 Install Landfill Gas Conveyance Pipe at 300 LF
Base of East Wall $14.00 $4,200.00
6 |Survey 1 LS | $28,000.00 $28,000.00
Bid Price ~- Part 1 $72,230.00
Bid Price - Part2 | $219,702.00
Total | $291,932.00
> A100% Performance Bond and 100% Payment Bond, in the amount equal to the Contract
Award, will be required to be posted.
> Submission of a project specific health and safety plan that conforms to all applicable OSHA
requirements is required. This plan shall be adhered to by CONTRACTOR'S employees while on
site and during performance of the specified work.
CONTRACTOR: NorthEast Earth Mechanics
AUTHORIZED SIGNATURE:_A2chey Stockman
EMAILADDRESS; rodneys@neearth.com
PHONE: 603-365-6284
EAX: 603-435-7950
DATE: 1/16/2017
Page 1 of 4