Board Of Aldermen - Minutes - 5/17/2018 - P3
Special Board of Aldermen Public Hearing — 5/17/2018 Page 3
therefore result in a shift. As discussed before, we have hired KRT and we are trying to minimize that
impact.
Special Board of Aldermen Public Hearing — 5/17/2018 Page 3
therefore result in a shift. As discussed before, we have hired KRT and we are trying to minimize that
impact.
Special Board of Aldermen Public Hearing — 5/17/2018 Page 2
have for some time because of the opioid epidemic and the resulting problems. But we tried to stick
with keeping hopefully what we have without adding too much because we want to keep the budget
very tight.
PUBLIC HEARING
MAY 17, 2018
A Public Hearing was conducted by the Board of Aldermen on Thursday, May 17, 2018, at 7:00 p.m.
at the Nashua High School North Auditorium, 8 Titan Way, Nashua, New Hampshire.
President Brian S. McCarthy presided; City Clerk Patricia D. Piecuch recorded.
The prayer was offered by City Clerk Piecuch; Pledge of Allegiance was led by Alderman-at-Large
Lori Wilshire.
The roll call was taken with 14 members of the Board of Aldermen present; Alderman Caron was
recorded absent.
AMENDED
ORDINANCE O-18-012
fg)(o) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
€}(p) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $258500.”
All other ordinances or parts of ordinances inconsistent herewith are hereby repealed.
This ordinance shall become effective 30 days after passage.
AMENDED
ORDINANCE O-18-012
G5) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
@k) Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250275.
(2) Commercial plumbing (including Multi-Family).
(a) Nonrefundable application processing fee: $2530.
AMENDED
ORDINANCE
(0)
(p)
(q)
(r)
O-18-012
Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.
Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5075.
Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250500.
Annual permit fee: $465250.
AMENDED
ORDINANCE
(j)
(k)
(2)
O-18-012
Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
Surcharge for permits issued after construction started without a permit:
100% of applicable fee, but not to exceed $250275.
Commercial electrical (including Multi-Family).
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
G)
(k)
(1)
(m)
(n)
AMENDED
ORDINANCE O-18-012
(g) Kitchen exhaust systems:
[1] | Hoods (each): $3375.
[2] Fans associated with hoods — replacement (each): $3-5010.
(h) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.
(1) Re-inspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $5975.
AMENDED
ORDINANCE
(2)
(e)
(f)
(g)
(h)
(i)
()
O-18-012
Factory-built fireplace and associated chimney, gas or solid fuel (each):
$2440.
Masonry fireplace and associated chimney: $49.5975.
Manufactured Chimney: $2430.
Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section: $3335.
AMENDED
ORDINANCE O-18-012
(12) Re-inspection of the same work due to the failure to pass an initial inspection or
the unavailability of the premises at the time of initial inspection: $5975.
(13) Phased construction (foundation permits, interior demolition permits or shell
permits): Phased construction shall be charged a 25% surcharge on the original
permit fee for each upgrade phase.