Board Of Aldermen - Minutes - 12/16/2019 - P63
Summary
DPW Facilities
ui Administration $5,521,558
—
F x ——
yy Streets Department $4,227,990
Parks and Recreation Department $3,192,628
Solid Waste Department $3,037,789
Total $15,979,965
Summary
DPW Facilities
ui Administration $5,521,558
—
F x ——
yy Streets Department $4,227,990
Parks and Recreation Department $3,192,628
Solid Waste Department $3,037,789
Total $15,979,965
Summary
DPW Facilities
Summary
Solid Waste Department
DPW Facilities
Comments:
- Major demolition
- New slab on grade
- New exterior walls, siding, MEP systems, sprinkler system
- Total 6,427 SF
- 7-Months
Hard Construction Costs $1,923,280
Design Contingency (20%) $384,656
Architectural, Engineering, Planning (15%) $346,190
Geotechnical Engineering $5,000
Haz-Mat Survey $2,500
Furniture, Fixtures and Equipment $100,000
Owner's Contingency (10%) $276,162
Total $3.037,789*
Nashua DPW, Solid Waste Building
Overall Floor Plan
Break Room
Adrnin
Assistant
File Storage
J
Staff Meeting/Training Room
Men's Locker/Restroom
y
Men's Locker'Restroom
<
General Storage Room
a sy
Recycling Tote Storage Room
102
ll
HARVEY
| rs |
Solid Waste Department
DPW Facilities
—-— 5%
Level 1
0'- 0"
Solid Waste Department
DPW Facilities
High Point of Roof
1 9'-6"
Admin. Roof 11'-6"
Average Top of Roof
17'-0"
—— -— 526
Admin Roof
60'-2" >!
Solid Waste Department
DPW Facilities
= 6 Ph aaa
| Gross Floor Area - 6,427 SF
Solid Waste Department
DPW Facilities
Parks and Recreation Department
DPW Facilities
Comments:
- Demolish 1920's building (1,287 sf)
- New 2-story addition (2,970 SF)
- Renovate 2,440 SF
- Total 5,410 SF
- New HVAC, sprinkler system, flooring, paint, ceilings
- 7-Months
Parks and Recreation Department
DPW Facilities
Parks and Rec Admin Building Proposed Basement Reno
102