Finance Committee - Agenda - 3/20/2019 - P365
3.4
3.5
3.6
3.7
3.8
B.
C.
Floors, and similar surfaces shall be given a float finish.
Floor slabs shall be hand-floated and given a smooth finish.
CURING
A.
Concrete shall be maintained in a moist condition for seven (7) days using
methods that will insure complete and continuous saturation.
Floor slabs may be cured by the use of membrane curing compound applied in
accordance with the manufacturer's directions.
EXPANSION JOINTS
A.