Finance Committee - Agenda - 3/20/2019 - P405
ut
9.
Pipe lines shall be pressure tested in presence of the CQA Consultant.
CONTRACTOR to provide ENGINEER with a minimum of 7 days’ notice
before performing the test.
Provide necessary connections between section of pipe being tested and
nearest available source of water or air supply, together with test
pressure equipment, meters, pressure gauge, other equipment, materials
and facilities necessary to make specified tests.
Owner will provide a source of water for testing.