Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P412

Finance Committee - Agenda - 3/20/2019 - P412

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
412
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

SECTION 15310
SUMP RISER BUILDING PIPE, FITTINGS, AND APPURTENANCES
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Furnish and install all pipe, valves, and appurtenances in the Sump Riser
Building, including:
1. Polyvinyl chloride (PVC) pipe and fittings.
2. Check valves, regulating valves, shutoff valves, air release/vacuum relief
valves.
3. Labels.
B. Furnish and install blind flanges to sideslope risers.
C. Furnish and install vent piping.
D. Perform hydrostatic testing.

1.2 PRODUCT HANDLING

A. Ship, store, and install material and equipment in a manner which does not
degrade quality, serviceability or appearance. Store in clean, dry location.

B. Do not spill or cause release of any chemicals used to clean or bond piping
materials.

1.3. SUBMITTALS
A. Manufacturers product data, including catalog cuts, specifications, dimensions.
1.4 WORKMANSHIP

A. All pipe shall be installed by qualified workmen, with minimum 5 years’
experience in industrial process plumbing.

PART 2 - PRODUCTS
2.1 PVC VALVES

A. PVC for pressure applications shall be Schedule 80, ASTM D1785, Type 1, Grade
1. Fittings shall be socket type, ASTM D2467.

B. Solvent cements shall conform to ASTM D2564.,

File No. 3066.09 Sump Riser Building Pipe, Fittings, and Appurtenances 15310- 1 of 7 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P412

Footer menu

  • Contact