Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/6/2019 - P624

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P624

Chemical Solution Concentration, %
Tap Water (ph 6-9) 100

Nitric Acid 5

Phosphorus Acid 10

Sulphuric Acid 10

Gasoline 100

Vegetable Oil 100

Detergent 0.1

Soap 0.1

The Contractor shall be responsible for all costs associated with the chemical
resistance tests. Proof of meeting these requirements shall be provided to the
Engineer for approval at least 7 days prior to the commencement of work.

1.09 WARRANTY

Finance Committee - Agenda - 3/6/2019 - P623

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P623

3. Design Thickness Fiberglass: ASTM 1216 Design Formula,

4. Ovality of Pipe: 2% of circumference.

5. Soil Land 120 Ibs/ft.?

6. Traffic Loads Per AASHTO-HS-20-44 Highway Loading

7. Modulus of Soil 500 psi.

8. Maximum Deflection 5%

9. Minimum Safety 2.0

10. Resin Migration Not Allowed

11. Soil Cover Maximum depth of cover over the pipe
crown to highest ground surface along the
length of the pipe lining.

12. Water Table Assume at ground surface.

Finance Committee - Agenda - 3/6/2019 - P622

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P622

8. Supervisory personnel shall have a minimum of five (5) years of experience in
a supervisory role, and shall have completed at least five (5) projects of
similar size and complexity as this project within the past five (5) years.
Attach résumés of each person named. Résumé information shall include, at a
minimum, educational background, the number of years in a supervisory
capacity and a list of completed projects within the past two (2) years,
including project description, complexity and contract total amounts.

1.05 SUBMITTALS

Finance Committee - Agenda - 3/6/2019 - P621

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P621

1.04 QUALITY ASSURANCE

A.

REQUIREMENTS

1.

Products used in the work of this section shall be produced by manufacturers
regularly engaged in the manufacture of cured-in-place liners for municipal
wastewater systems and with a history of successful production acceptable to
the owner.

Finance Committee - Agenda - 3/6/2019 - P620

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P620

ro Aa PP

Section 01110, CONTROL OF WORK AND MATERIALS
Section 02085, POLY VINYL CHLORIDE PIPE AND FITTINGS
Section 02252, SUPPORT OF EXCAVATION

Section 02300, EARTHWORK

Section 02441, CLEANING, ROOT CUTTING, AND TELEVISION (CCTV)

INSPECTION OF PIPELINES

F. Section 02631, PRECAST MANHOLES

G. Section 02745, ROAD RESTORATION

H. Section 02800, MANHOLE REHABILITATION

1.03 REFERENCE STANDARDS

The following references are part of this specification. The latest edition of the following
references shall be used:

Finance Committee - Agenda - 3/6/2019 - P619

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P619

SECTION 02651

CURED-IN-PLACE (CIPP) LINING OF EXISTING SEWERS
(ULTRAVIOLET CURING)

PART 1 GENERAL

1.01 DESCRIPTION

A.

SCOPE

Finance Committee - Agenda - 3/6/2019 - P618

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P618

3. Final acceptance of work shall not be granted until all defective areas are
repaired in accordance with the CIPP manufacturer’s recommendations and to
the Engineer’s satisfaction.

4. Any repairs required by the Engineer as a result of the post construction
internal inspection shall be performed by the Contractor.

Finance Committee - Agenda - 3/6/2019 - P617

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P617

3.09 TESTING, INSPECTION AND ACCEPTANCE

A. MATERIAL TESTING

1.

All material testing shall be performed by a registered independent, third-
party laboratory, and paid for by the Contractor.

The Contractor shall provide test results of the short term properties of the
cured lining material in the quantity of one test per liner batch, or 3,000 feet of
installed liner, or as required by the Owner. The liner shall be in compliance
with the physical properties described in these Specifications. Flexural

Finance Committee - Agenda - 3/6/2019 - P616

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P616

COOL-DOWN

Finance Committee - Agenda - 3/6/2019 - P615

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P615

inspect the materials and “wet out” procedure. A resin and catalyst system
compatible with the requirement of this method shall be used.

Materials shall be transported to, and stored at, the site in such a manner that they
will not be damaged, exposed to direct sunlight, or result in any public safety
hazard. All materials shall be subject to inspection and review by the Engineer
prior to installation.

Pagination

  • Previous page ‹‹
  • Page 610
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact